The document outlines general notes and specifications for construction works, emphasizing the need for on-site verification of dimensions and compliance with architectural and engineering details. It includes details on civil, structural, and mechanical works, particularly focusing on plumbing and drainage systems. The project is for the Proposed Central Perk Mall in Nairobi, with specific fittings and materials listed for the water supply system.

Uploaded by

Daniel Ndiragu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views1 page

Isometric A1 Coloured

The document outlines general notes and specifications for construction works, emphasizing the need for on-site verification of dimensions and compliance with architectural and engineering details. It includes details on civil, structural, and mechanical works, particularly focusing on plumbing and drainage systems. The project is for the Proposed Central Perk Mall in Nairobi, with specific fittings and materials listed for the water supply system.

Uploaded by

Daniel Ndiragu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERAL NOTES

1.All dimensions to be checked on site before


commencement of work.
2.Use figured dimensions. Any discrepancy
should be reported to the Architect before
commencement of works.
3.All dimensions in millimeters unless
otherwise stated
4.All sanitary fittings,doors,windows and
lifts to schedules.
5.Permanent ventilations to be provided on
all walls and windows except on WC doors
2,000

2,0
00 CIVIL WORKS
5000 Litres water tank 1.All R.C works to structural engineer's
details

1,500
30mm Ø overflow pipe

STRUCTURAL WORKS
15mm
mm
Ø Ø
b 1.Refer to Engineer's details for all R.C
20 wh wh
b
works.
wc
urinal 20mm Ø Rising Mains
wc wc urinal 2.Foundation depth to be determined on
wc na
l
l urinal
25mm Ø distribution pipe 3,500
uri r i na b site on Architect's approval.
20mm u
Ø wh wh
b 20mm
Ø

mm
Ø
b wc MECHANICAL WORKS
20
wh b wc wc 00
wh 20mm wc wc
4,0 Ø
Ø mm 1.All plumbing and drainage to comply with
wc 20
urinal
wc wc council requirements

600
urinal
wc na
l urinal
uri al
rin b 2.Plumbing and drainage to mechanical
20mm u
Ø wh wh
b 20mm
Ø
engineer's detail.
wc
Ø
mm b wc
20 wh wh
b wc Ø
20mm wc wc 20
mm
Ø
wc
Stop Cork
ins urinal
Ma wc wc

600
c urinal
bli
w c rinal
0
Pu 1,000
1,000 urinal 70
l 0
Water meter 1,000 u
ur ina 70
b
1,000

20mm
1,000
700
700
70
0
wh wh
b 20mm
Ø PROJECT NAME
Ø
wc
3,000

wc wc
Ø PROPOSED CENTRAL PERK MALL ON

600
Stop Valve
wc mm
3,000
Gate valve
1,000
1,000
wc 20
PLOT LR NO.82/6929 DONHOLM,OFF
1,000
ink MANYANJA ROAD, NAIROBI.
1,000
1,000
s
en
ch
20mm 20mm
Ø Ø
Kit
10,000

CLIENT

TEN COMMODITIES WHOLESALE


LIMITED

DRAWING NO

DRG NO 015

DRAWING TITLE
WATER SUPPLY
KEY
WATER SUPPLY FITTINGS SCHEDULE DRAWING SCALE
Cold Water Supply NUMBER
FITTINGS DIAMETER
NOTES
1:100
Direct supply Elbows 25 mm 11 1.Pipes along the wall to be chased in.
25 2.The diameter for the pipes to water closet=20mm, wash hand basin=15mm, CHECKED BY
20 mm kitchen sink= 20 mm.
whb wash hand basin 3.Average depth for the pipe trench is 525mm. 1.Prof.Qs.Dr. S.M Masu
4.All pipes are Polypropylene (PPR).
Reducers 25-20 2 2.Dr. A.H.V Lamka
wc water closet 20-15 12 3.Qs D. Choka
Tee joint 25mm 1
20 mm 39

Reducer Tee 20-15mm 12

Double bowl sink 2


THE TECHNICAL UNIVERSITY OF KENYA
SCHOOL OF CONSTRUCTION AND
PROPERTY STUDIES
DEPARTMENT OF CONSTRUCTION
ECONOMICS AND MANAGEMENT
BACHELOR OF QUANTITY SURVEYING
SEMESTER 2 YEAR 4 2021
CLASS CODE: EACQ/2017
UNIT:PROJECT B EACQ 4297
STUDENT DETAILS
NAME:DENIS K. MWANGI

REG NO:EACQ/00147/2017

GSPublisherVersion 0.2.100.100