The document is a communication from NHAI regarding the construction of a 20.56 km service road parallel to the Ahmedabad-Dholera Expressway. It confirms the appointed date for the project as 20.02.2025 following the signing of a Joint Handover Memorandum. The letter requests necessary action from the contractor, M/s M.S. Khurana Engineering Ltd, and includes references to previous agreements and communications.

Uploaded by

KumarTejas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views2 pages

Draft

The document is a communication from NHAI regarding the construction of a 20.56 km service road parallel to the Ahmedabad-Dholera Expressway. It confirms the appointed date for the project as 20.02.2025 following the signing of a Joint Handover Memorandum. The letter requests necessary action from the contractor, M/s M.S. Khurana Engineering Ltd, and includes references to previous agreements and communications.

Uploaded by

KumarTejas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

NHAI/RO-GNR/Ahmedabad-Dholera/Service Road/2024-25/

Dated:10.04.2025

To,
The Authorized Signatory,
M/s M.S. Khurana Engineering Ltd,
2nd Floor, "MSK", near Fusion Kidney Hospital,
Passport office to Panjrapol Rd.,
Ambawadi, Ahmedabad-380015, Gujarat
e-mail- mskel@mskhurana.in, vishal@mskhurana.in

Sub: Construction of 20.56 km long two lane service road from Ch.0.000 to
Ch.20.560 parallel and LHS to Dholera – Bavaliyari section of Ahmedabad –
Dholera Expressway (NH-751) in the state of Gujarat on EPC Mode – handing
over of balance land - reg.

Ref:
(i) LOA issued vide RO-Gandhinagar, NHAI letter no. 3990 dated 06.11.2024.
(ii) Contract Agreement dated 13.12.2024.
(iii) Joint Handover Memorandum dated 10.02.2025.
(iv) Contractor letter no. 12143 dated 12.02.2025
(v) RO-Gandhinagar letter no. D-815 dated 04.03.2025.
Sir,
With reference to subject matter, consequent upon signing of Joint
Handover Memorandum on 10.02.2024 and as requested by contractor vide
letter cited above under ref(iv), the appointed date of subject project has been
declared w.e.f. 20.02.2025 vide RO-Gandhinagar letter cited above under ref(v)
in line with Article 3 and Article 8 of the contract agreement.

2. As per

This is for your information and necessary action please.

Thanking you,
Yours sincerely,

Encl: As above
(Rajeev Chandra)
GM(T) & PD
NHAI, PIU-Ahmedabad

Copy to:
(i) RO-Gandhinagar, NHAI……for kind information please.
(ii) Team Leader cum Senior Highway Engineer, AE….for kind information and
necessary action please.

You might also like