RFP - Scope
RFP - Scope
Copyright © 2025 by Muscat Municipality All rights reserved. This document, including
any writings, drawings, notes or verbal representations made or shown in the course of this
communication are confidential and proprietary to Muscat municipality. This material
whether in electronic, paper format and any Muscat municipality ideas, processes, lists,
planning information, financial, operational or customer data contained herein constitute the
trade secrets of Muscat municipality which are valuable items of proprietary property owned
by Muscat municipality.
This document contains confidential information that is being shared for the purpose of
enabling a focused response to the RFP. No part of the materials included in this
communication should be: - a) reproduced; b) published in any form by any means,
electronic or mechanical, including photocopy or information storage or retrieval system; or
c) disclosed to third parties, without the express written authorization of Muscat
municipality. Bidders who choose not to respond to this RFP are requested to return it to
Muscat municipality
Muscat Municipality is the local government authority responsible for the administration
and maintenance of Muscat, the capital of Oman. It is responsible for providing a wide
range of services to the residents of Muscat, including waste management, street cleaning,
public parks and gardens, building regulation and inspection. The municipality plays an
important role in the development and planning of the city, working to ensure that new
constructions and development projects are in line with the city’s overall vision and
goals. The municipality also works with other government agencies and organizations to
provide services and support to the residents of Muscat.
Muscat Municipality was founded in 1975 and its main aim is to provide high standards
of living for the residents of Muscat, by providing essential services, implementing
regulations and laws that promote safety and well-being.
The Municipality is responsible for the upkeep of public areas, including roads, side-
walks, and streets, as well as maintaining public parks and gardens, managing waste
disposal and recycling. It also issues licenses and permits for construction and
development projects, and conducts inspections to ensure that buildings and other
structures are safe and comply with local building codes.
The Muscat Municipality also plays an important role in promoting tourism in Muscat city
by preserving and promoting
cultural
S heritage sitesSystand
hain Mana gement em landmarks by organizing events and festivals that highlight the city’s
1.1 Definitions
The following are key definitions for acronyms used in the RFP:
Term Description
MM Muscat
Municipality –
Sultanate of Oman
CRM Customer
Relationship
Management
HRMS Human Resources
Management
System
FINANCI Core financials
AL modules covering
General Ledger,
Accounts
Receivables,
Accounts
Payables, and
Cash Management
RDBMS Relational
Database
Management
System
OMR The Currency of
Sultanate of Oman
(Omani Riyal)
(Table 1-1) – Key Definitions
1.2 Confidentiality
This RFP, plus any other documents released, information provided, discussions, and
others, as part of the selection process, are strictly confidential and should not be
disclosed to anyone who is not directly involved in response preparation of this RFP.
Additionally, all information within this RFP or gained during the RFP or other processes
will remain confidential with tenderers. No information or publicity shall be allowed to
any third party unless specific written authorization is obtained from Muscat
Municipality.
It is a condition of this RFP that the information provided herein is for the purpose of
allowing Tenderers to submit proposals to Muscat Municipality. It may not be used in any
other context nor revealed to any other party not directly involved in the submission of a
proposal in accordance with the terms of the specification.
N Aspect Description
o
.
APC
Technology
deployed with
1 Data Center
Hot Aisle
Containment
System, with a
comprehensive
DC
requirements
and
capabilities
such as
Outdoor/Indoo
r Cooling
System,
Leakage
System, Fire
Suppression
System,
Power, Racks,
SAN Storage,
Backup and
Library
System, UPS,
Generator,
Adaption
Management
System to
support
adopting any
additional
future
requirements.
More than 20
remote sites
supported by
local LAN and
2 Network
integrated with
MM Head
office through
Government
Network
(MPLS), The
lines capacity
varies between
1MB – 1GB,
and other site
using point to
point high
speed fiber
optic
connection
speed 1GB
”MM WAN”,
LAN & WAN
devices are
Cisco
Technology, to
support more
than 2
thousand as
MM Network
users. As well
IP Telephony
system using
Avaya Call
Manager and
IP Office
Integrated
among the
remote site as
a single
platform to
communicate
between HQ
and Remote
sites.
An ERP
3 Oracle
system
e-
deployed in
Business
accordance
Suite R12
with MM
Requirements.
The Deployed
Oracle
Systems are
CRM, HRMS,
Financials and
iSupport. The
Database used
is Oracle
Database RAC
19c.
An IBM
Document FileNet
4 Management Technology
System System is
deployed
recently at MM
to manage the
different types
of Documents
& Records. In
Addition, it
manages the
different type
of files such as
video, audio,
images … etc.
The System is
using Oracle
Database RAC
12c. The
system will be
Integrated with
almost all MM
deployed
Information
Systems
Custom built-
In-house in application
5
Applications using Oracle
application
server such as
Purchasing,
Stores, Fleet
Management
and
Maintenance
System, Fuel
System, and
Contract
Management
System. The
Database used
is Oracle DB
11gR2.
ININ
Muscat Technology is
6
used to support
Contact Center the contact
center, align
with e-
complain
system
implemented
using Java &
asp.net
supported by
SQL Database
Server.
A messaging
System
7 Implemented
to support the
SMS Gateway different type
of
Internal/Extern
al applications
& E-services.
It is integrated
directly with
the databases
to interact
directly with
the customers
through
different types
of messages
(auto push,
pull, manual
Push).
The Gateway
is implemented
using ASP.net,
Java, XML,
Web services
technologies,
along with
Oracle
Databases as a
backend
system.
8 (www.mm.gov
MM Portal
.om).
Social MM has
9
official
Media accounts in
Networking
Face book,
Twitter,
Instagram and
YouTube,
Managed by
MM specialist
team.
Esri ArcGIS
Server
Advanced
1 10 .8.1(8
0
GIS application Cores)
& Portal (MM Map
services are
published
using ArcGIS
Server)
Database:
Oracle DB 12c
Front-end :
ArcGIS 10.8.1
http://gis.mm.g
ov.om
(website is
implement
using OnPoint
and ArcGIS
Server)
Available in
two operating
systems:
Android and
1 IOs
1 Baladiyeti Application
Development
Mobile Apps
environment:
- Framewo
rk:
IONIC, .
NET 4.x ,
SWIFT(i
ONIC 1.0
and
Angular
1.x).
- Database:
Oracle
and SQL
Server.
Currently in
the last stage
of
implementing
NEW
Application
Development
environment:
Framework:
Flutter
2.2.1, .NET
4.x, Android
29, IOS 9.0
Parking
1
3 Organizing the
Violation
Mobile Apps procedures and
mechanisms
for registering
violations
The purpose of
the application
Facilitate
the
1 Restaurant
Evaluation evaluatio
4
Program n process
and link
the
evaluatio
n with the
geographi
cal data
of
restaurant
s. Mainly
focusing
in:
Develop
ment of
an
electronic
evaluatio
n form on
the GIS
Cloud
program
helps the
user in
the
process of
evaluatin
g the
restaurant
s easily
using
smart
devices.
Develop
an
applicatio
n on
ArcMap
to serve
the
restaurant
evaluatio
n team to
issue and
preview
the
evaluatio
n reports
in Excel
format.
Centralized
Geo–Enabled
NOC Issuing
1
system to
5
businesses.
Muscat e-NOC
The Muscat e-
NOC System
will act as a
One Stop
solution for all
NOC needs
(Excavation
Permits). The
NOC System
will be
developed in
coordination
with related
Public and
Private entities
who are
involved in the
NOC process.
The system
implemented
using:
Oracle
Business
Process
Managem
ent
(BPM)
Oracle
Service-
Oriented
Architect
ures
(SOA)
ArcGIS
Server
http://
GOM portal gom.gov.om/
1
6 The website is
developed
using PHP.
The database
used is
MYSQL.
GOM website
is developed in
ARABIC
1.4 Purpose of RFP
The objective of this RFP is to seek proposals from qualified vendors to provide scope
require the bidder to:
Supply and implement turn key solution of Supply Chain Management System.
MM looks for an enterprise widely adopted solution.
Provide Three years AMC after the Deployment of the Solution phase and Sign-off
date.
The Bidder is expected to implement the solution based on the following Phases:
Phase1: Study & Assess the Current MM Systems, Services, RDBMS and the related
Business Processes and Propose the Recommended Systems, Services Process and
RDBMS to be implemented as part of the solution for Supply Chain Management
System.
Phase2: Implementation Phase for Supply Chain Management System as per the
approved recommended systems, Services and Business Process.
Phase3: Pre Go-Live Phase for Supply Chain Management System.
Phase4: Post Go-Live Phase (onsite full support), the bidder should cover all the
changes required for Supply Chain Management System (and its backend database
(RDBMS)) after the Go-Live to assure the system's stability as per MM satisfaction for
about 6 months. In addition, the phase activities should be aligned with the AMC
requirements stated in the AMC sections.
2. SCOPE OF WORK
3. Functional Requirements
The below table lists the general requirements common for all the solution components.
Bidder has to respond to all of the specifications by either: full compliant (FC), partially
compliant (PC) or Non-compliant (NC) and briefly explain how it is achieved (Referring to
relevant section in the proposal). Bidder has to submit all supporting documents (datasheets,
screenshots. . . etc.).
Note: For FC and PC, the bidder must provide an accurate reference from the
proposal (Document Name/Section number/ page) proving compliance with the
requirement. Otherwise, offer is considered disqualified.
N Requirement Compliance R
o (FC/PC/NC e
) m
a
r
k
s
r
e
f
e
r
e
n
c
e
i
n
p
r
o
p
o
s
a
l
(
D
o
c
n
a
m
e
/
S
e
c
t
i
o
n
/
P
a
g
e
)
T Closed/Open
E Source:
C Based on
_
1 International
Best
Practices
(should be
clearly stated
in the
proposal)
either to be
a
commercial
or an Open
Source
T Language: The
E System must
C support Bilingual
_ (English/Arabic)
2
T Interactive &
E Responsive
C Interfaces: Cover
_
3 different interactive
interfaces (such as
mobile apps, portals
(Intranet/Internet), ...
etc.).
T Customization and
E Extensibility: The
SCM solution
C should be
_ customizable and
4 extensible to adapt
to MM’s unique
business
requirements,
workflows, and
T Omni-Channel
E Accessibility:
Support all MM
C technical interactive
_ channels such as;
5 Mobile interaction
Internal/ External
Portals, Email, Self-
Service Portal,
T Reporting and
E Dashboarding: The
C system should
_
6 provide
comprehensive
reporting and
analytics
capabilities to
monitor processes,
identify trends, track
key metrics, and
make data-driven
decisions. It should
support
customizable
dashboards, ad-hoc
reporting, and trend
analysis.
T Security: Access
E control and
C authorization should
_
7 be integrated with
active directory and
can be integral with
third-party solution
T Security and
E Auditing: Built with
C high consideration of
_
8 security concerns
therefore it should
support the
following:
• Users access
control,
• Security,
• Tracking,
• Auditing,
• Data History,
• Logs of users’
activities,
T Scalability: Ability
E to scale horizontally
C and vertically to
_ accommodate
9 growing user bases
and increasing
workloads.
T High-Availability:
E Redundancy and
C failover mechanisms
_ to ensure continuous
1 service availability
0 and minimize
downtime.
T Performance:
E Efficient resource
C utilization and
_ response times to
1 meet user
1 expectations.
T Deployment
E Options: The bid
C should clearly state
_ type of deployment.
1 MM is open to
2 consider both
traditional on-
premises and cloud-
based solutions
(complying with
Oman regulations).
Vendors are
encouraged to
propose cloud
solutions if they
believe it will provide
additional value or
advantages.
T Compliance with
E Best Practices &
C International
_
1 Standards: The
3 proposed system
must comply with
applicable local and
international security
standards and
regulations. This
includes adherence
to best practices for
data protection, risk
management, and
compliance with
relevant laws, such
as GDPR or ISO
standards. These
measures has to be
integrated to the
system to enhance
its reliability and
trustworthiness,
ultimately
protecting sensitive
information and
maintaining user
confidence.
Bidder has to respond for all of the specifications by either full compliant (FC),
partially compliant (PC) or Non-compliant (NC) and briefly explain how it is achieved
(Refer to relevant section in the proposal if needed). Bidder have to submit all
supporting documents (datasheets, screenshots. . . etc.).
Supply C
Note: For FC and PC, the bidder must provide an accurate reference from the
proposal (Document Name/Section number/ page) proving compliance with the
requirement. Otherwise, MM has the right to disqualify the bidder’s offer.
N Requirement C R
o ema
o
rks
m refe
p renc
e in
l
prop
i osal
a (Doc
na
n me
/
Se
c cti
on/
e Pa
ge
)
(
F
C
/
P
C
/
N
C
)
I Integration
N Scope:
T Solution
G
_ should cover
1 the
integration
with any
internal
systems,
external
systems and
external
entities (up
on MM
approval)
with no extra
cost. scope
should
include
current and
future
integration.
I Minimum
N Integration
T Requiremen
G
_ t: Current
2 integration
include
Oracle E-
Business
Applications
, payment
gateway,
SMS
gateway,
MM mail
server
(Active
Directory), e-
ticketing/ITS
M solution,
e- tendering
portal
(Esnad),Mini
stry of
Commerce
and
Industry(MO
CI), Oman
Chamber of
Commerce &
Industry
(OCCI),
SME
Development
Authority,
Tax
Authority,
and Ministry
of Finance
(MoF) and
any other
systems or
solutions
identified
during
design phase.
I APIs/
N Connectors:
T All web
G
_ services,
3 APIs and
other
connectors
must be
defined and
created by
the bidder for
all possible
integrations
with other
internal or
external
systems. The
I Push and
N Pull of data:
T The solution
G
_ architecture
4 should
support any
mechanism
of API
integration
standards.
The bidder
should
implement
both push
and pull of
data as far
as required
and/or as
per the
agreed
process at
the design
phase.
N Requirement C R
o ema
o
rks
m refe
p renc
e in
l
prop
i osal
a (Doc
na
n me
/
c
Se
e cti
on/
Pa
ge
(
)
F
C
/
P
C
/
N
C
)
M Migrate to
I the new
G system:
_
1 Scope pf
work should
cover Data
Conversion
and
Migration
from MM
current
systems to
the new
proposed
SCM
solution.
M Migrated
I data: The
G data migration
_ should cover
2
both
transactional
and historical
data.
M Migration
I Plan: The
G bidder should
_ submit data
3
migration
plan.
I Data size:
N current
T Approximatel
G
y 2.5 GB and
_
4 7GB file size
Supply Chain Mana gement Syst em
N Requirement C R
o ema
o
rks
m refe
p renc
e in
l
prop
i osal
(Doc
a
na
n me
/
c Se
e cti
on/
Pa
ge
(
)
F
C
/
P
C
/
N
C
)
I The proposed
N solution
T Interface
_ should be user
1
friendly and
as per MM
users
Satisfaction
and
confirmation
I support\
N working
T
_
mobile
2
platform.
I support
N English and
T Arabic based
_
on user
3
preferences.
Architecture Requirements
N Re C Remark
o qu o s
. ire m referenc
me p e in
nt l proposa
i l (Doc
a
n
c
e
( name/
F Section/
C Page )
/
P
C
/
N
C
)
A Sol
R uti
C on
H Ar
_ chi
1 tec
tur
e:
Th
e
bi
dd
er
sh
oul
d
su
b
mi
ta
co
m
ple
te
tec
hn
ica
l
Sol
uti
on
Ar
chi
tec
tur
e.
A Int
R eg
C rat
H ion
_ Ar
2 chi
tec
tur
e:
Th
e
sol
uti
on
ar
chi
tec
tur
e
sh
oul
d
all
ow
for
ma
xi
m
u
m
int
eg
rat
ion
wit
h
ot
he
r
M
M
IT
sys
te
ms
,
too
ls
ar
chi
tec
tur
e
an
d
ext
er
nal
sys
te
ms
.
A Ar
R chi
C tec
H tur
_ e
3 De
sig
n:
Th
e
pr
op
ose
d
sol
uti
on
is
rec
om
me
nd
ed
to
be
de
sig
ne
d
to
wa
rd
s
the
Ap
pli
cat
ion
De
vel
op
me
nt
inf
ras
tru
ctu
re
an
d
pla
tfo
rm
wit
h
all
rel
ate
d
co
m
po
ne
nts
to
wa
rd
s
Se
rvi
ce-
Or
ien
ted
Ar
chi
tec
tur
e
co
nc
ept
,
Int
eg
rat
ion
-
lay
er,
Bu
sin
ess
Pr
oc
ess
M
od
elli
ng
(B
P
M)
.
A Da
R ta-
C La
H ye
_ r:
4 Sol
uti
on
ar
chi
tec
tur
e is
a
ce
ntr
ic-
da
ta
ar
chi
tec
tur
e
for
da
ta
co
nsi
ste
nc
y
an
d
re
us
abi
lit
y
A Ad
R op
C ta
H ble
_
5 St
an
da
rd
s:
Sol
uti
on
Ar
chi
tec
tur
e is
ba
se
d
wi
del
y
ad
op
ted
sta
nd
ar
ds
th
at
ca
n
fac
ilit
ate
the
ad
ap
ta
bil
ity,
re
us
e
an
d
cos
t-
eff
ect
ive
ne
ss
of
ap
pli
cat
ion
s
A W
R eb-
C Ba
H se
_ d
6 Sol
uti
on
:
Sol
uti
on
is
dis
tri
bu
ted
,
dy
na
mi
c,
fle
xib
le,
an
d
re-
co
nfi
gu
ra
ble
ser
vic
e
sys
te
m
ov
er
Int
er
net
.
A Te
R ch
C an
H d
_ Lo
7 gic
al
Ar
chi
tec
t:
Ve
nd
or
pr
op
os
als
m
ust
co
nt
ain
su
gg
est
ed
tec
hn
ica
l
an
d
log
ica
l
ar
chi
tec
tur
es.
A Ar
R chi
C tec
H t
_ De
8 sig
n
Co
nsi
de
rat
ion
:
the
pr
op
ose
d
sol
uti
on
sh
olu
d
be
ali
gn
ed
wit
h
int
er
na
tio
nal
,
M
T
CI
T
an
d
M
M
sec
uri
ty
pol
ici
es
inc
lu
di
ng
:
standa
rds
and
best
practi
ces
such
as(IS
O/IEC
27001
NIST
Cyber
securit
y
Frame
work
OWA
SP
Top
Ten
GDPR
and
Data
Protec
tion
Regul
ations
Circul
ar
2/2016
,1/202
1
(MCT
IT)
A Hi
R gh
C -
H Av
_ ail
9 abi
lit
y
De
sig
n
Pl
an
:
As
pa
rt
of
Hi
gh
Av
ail
abi
lit
y/
Di
sas
ter
Re
co
ve
ry
ar
chi
tec
tur
e
the
pr
op
ose
d
sol
uti
on
m
ust
pr
ovi
de
Fa
ilo
ve
r
pla
n
eq
uiv
ale
nt
to
M
us
cat
M
un
ici
pal
ity
bu
sin
ess
co
nti
nu
ity
ac
ce
pte
d
val
ue
s.
N Re C R
o qu emar
o
. ire ks
me m refer
nt
p ence
in
l
prop
i osal
a (Doc
na
n me/
Sec
c
tio
e n/
Pa
ge )
(
F
C
/
P
C
/
N
C
)
S Se
E cu
C rit
_ y
1 Re
qu
ire
me
nt
:
the
off
er
sh
oul
d
ad
dr
ess
the
sol
uti
on
an
d
da
ta
ba
se
sec
uri
ty.
S Av
E ail
C abi
_ lit
2 y:
Th
e
pr
op
ose
d
sol
uti
on
sh
oul
d
be
wit
h
Hi
gh
Av
ail
abi
lit
y
24/
7.
Co
nsi
de
rin
g
an
y
Ba
ck
up
re
qu
ire
me
nts
an
d
pr
oc
ed
ur
es
to
be
co
nfi
gu
re
d.
De
scr
ibi
ng
the
tec
hn
iq
ue
s
us
ed
to
en
su
re
av
ail
abi
lit
y
S Lo
E ad
C Ba
_ lan
3 cer
:
Th
e
pr
op
ose
d
sol
uti
on
sh
oul
d
inc
lu
de
ap
pli
cat
ion
loa
d
bal
an
cin
g.
S Au
E the
C nti
_ cat
4 ion
:
Th
e
pr
op
ose
d
sol
uti
on
sh
oul
d
Pr
ovi
de
lev
els
of
Au
the
nti
cat
ion
&
Re
sp
on
sib
ilit
ies
co
nsi
de
rin
g
the
Be
st
Pr
act
ice
s
an
d
m
atc
hi
ng
the
dis
tri
bu
tio
n
of
the
pri
vil
eg
es
of
Or
ga
niz
ati
on
Hi
er
ar
ch
y
S Pe
E net
C rat
_ ion
5 Te
st:
Bi
dd
er
m
ust
pr
ovi
de
pe
net
rat
ion
tes
t,
str
ess
tes
t
an
d
an
y
ot
he
r
pe
rfo
rm
an
ce
tes
tin
g
th
at
sh
oul
d
en
su
re
the
hig
h
av
ail
abi
lit
y,
pe
rfo
rm
an
ce
an
d
sec
uri
ty
of
the
sys
te
m.
S ba
E ck
C up
_ pla
6 n:
bi
dd
er
sh
oul
d
su
b
mi
ta
ba
ck
up
pla
n
to
de
m
on
str
ate
the
me
ch
ani
sm
s
of
m
aki
ng
ful
l
ba
ck
up
of
the
sol
uti
on
inc
lu
di
ng
ba
ck
up
of
da
ta,
ap
pli
cat
ion
,
an
d
sys
te
m
co
nfi
gu
rat
ion
s
an
d
set
tin
gs
3.2.1 Application Development environment:
Bidder has to respond for all of the specifications by either full
compliant (FC), partially compliant (PC) or Non-compliant (NC)
and briefly explain how it is achieved (Refer to relevant section in
the proposal if needed). Bidder have to submit all supporting
documents (datasheets, screenshots. . . etc.).
Note: For FC and PC, the bidder must provide an accurate
reference from the proposal (Document Name/Section number/
page) proving compliance with the requirement. Otherwise,
offer is considered disqualified.
N Requirement C R
o em
ar
ks
ref
ere
nc
e
in
pr
op
os
al
(D
oc
n
a
m
e
/
S
e
c
ti
o
n
/
P
a
g
e
)
A Solution
P Environment:
P Vendor should
_
1 consider
solution
environment
architecture
having at least:
Development
environment,
Test
environment,
UAT
environment,
and Production
environment.
A Rapid
P Deployment:
P The proposed
_
2 system should
support the
rapid
deployment
initiatives to
expedite the
setup,
configuration,
and launch of a
system so that it
becomes
operational as
soon as
possible.
A Required
P
P Interfaces:
_ implementation
3 of all the
required
interfaces with
the
Internal/Extern
al MM systems
supported by
different types
of Technologies
and Releases.
A System
P Documentation:
P Provide all
_ software
4 development
access,
documentation
and other
requirements to
allow MM team
to extend the
solution
functionality.
A Additional
P Features:
P Provide the
_ required API
5 that allows for
the development
of additional
features or
integration and
make the API
accessible by
MM team.
A Source-Code:
P Provide all
P source code of
_ the proposed
6 solution.
A Third party
P software: If any
P 3rd Party
_ software/tool
7 proposed, it
should be
clearly
mentioned,
defined,
supported and
licenses paid by
the Bidder.
Database Requirements
N Requirement C R
o ema
o
rks
m refe
p renc
e in
l
prop
i osal
a (Doc
na
n me
/
Se
c cti
on/
e Pa
ge
)
(
F
C
/
P
C
/
N
C
)
D sizing
B details: The
_ bidder should
1
be specifying
the required
specs (i.e.
CPU, RAM,
Storage, etc.)
of the
database
sizing details
(i.e. users’
number,
transactions’
number, etc.)
of the
proposed
application.
D DB
B Preparation:
_ The vendor
2
should
provide and
implement all
the steps of
the database
(RDBMS)
architecture
design of the
proposed
solution as
per best
practice
D Data
B Migration:
_ The vendor
3
should cover
any data
migration/upg
radation
requirement
to the
proposed
solution’s
database
RDBMS.
N Requirement C R
o ema
o
rks
m refer
p ence
in
l
prop
i osal
a (Doc
na
n me
/
Sec
c tio
n/
e Pa
ge
)
(
F
C
/
P
C
/
N
C
)
D DB
B Preparation:
_ The vendor
4 should
provide
and
implement all
the steps of
the database
(RDBMS)
architecture
design of the
proposed
solution as
per best
practice
D DB
B operations:
_ The vendor
5
should handle
all DBA tasks
on the
database
(RDBMS)
architecture
of the
proposed
solution
during
implementati
on phase.
D DB Sizing:
B The vendor
_ should be
6
specifying
the required
specs (i.e.
CPU, RAM,
Storage, etc.)
of the
database
server as per
the sizing
(i.e. users’
number,
transactions’
number, etc.)
of the
proposed
application.
D Data
B Migration
_ The vendor
7
should cover
any data
migration/upg
radation
requirement
to the
proposed
solution’s
database
RDBMS.
D DB Release:
B The database
_ version
8
should the
latest code-
level and
certified with
latest OS
version of the
Database
server.
D DB Backup:
B The vendor
_ should
9
provide and
implement
the best
practice
backup and
recovery
strategies for
the proposed
solution’s
database
RDBMS.
Documentation Required: Database Schemas' Details, and data
classification, All Database Objects including their structures and
brief description for each object, backup policies
N Requir Co Re
o ement marks
mp
referenc
lian e in
ce proposal
(Doc
(F
name/
C/P Section
/Page )
C/
NC
)
T Tender
R ers are
_ require
1
d to
mentio
n the
trainin
g
approa
ch,
courses
,
session
s, and
tools to
be
used to
support
the
trainin
g and
knowle
dge
transfer
.
Tender
ers are
require
d to
handle
all
trainin
g
activiti
es
includi
ng but
not
limited
to the
provisi
on of
trainin
g
venue,
site
set-up,
PCs,
trainin
g
materia
l,
standar
d
office
supplie
s, and
any
other
support
tasks
as
require
d to
ensure
success
ful
trainin
g.
T Tender
R ers are
_ require
2 d to
provide
trainin
g
progra
ms
targete
d for
three
group
of
users:
a) MM
IT
Tea
ms:
Two
mai
n
trac
ks
(Op
erati
on
and
syst
ems
adm
inist
ratio
n) of
train
ing
each
of
whic
h
wou
ld
resul
t
into
form
al
certi
ficat
ion.
IT
team
me
mbe
rs
are
expe
cted
to
enro
ll in
eithe
r the
oper
atio
n
trac
k
and
or in
the
adm
inist
ratio
n
trac
k.
MM
End
Users
&
Emplo
yees:
Organi
zed
trainin
g
session
s as
approp
riate at
differe
nt
locatio
ns
within
Muscat
. The
purpos
e of
these
session
s is to
train
MM
end
users
(emplo
yees)
on
using
the
new
system.
The
session
s must
be
deliver
ed in
Arabic.
b)
Inform
ative
present
ation
materia
ls must
be
deliver
ed as
part of
the
trainin
g
session
to the
attende
es.
C)
Partici
pants
and
Genera
l
Public:
Online
user-
friendl
y
tutorial
,
explain
ing in
detail
all
possibl
e use
case
scenari
os of
the
service
s. The
tutorial
should
be
availab
le in
both
Arabic
and
English
. In
additio
n, the
tutorial
can be
downlo
aded
and
CD-
ROM
version
must
be
deliver
ed as
part of
the
project.
The
tutorial
could
be
animat
ed and
having
instruct
ive
comme
nts in
Arabic
and
English
. The
scenari
o and
storybo
ard
must
be
approv
ed by
MM
prior to
implem
entatio
n.
T Knowl
R edge
_ Transfe
3 r
during
the
contrac
t
period
and
during
the
differe
nt
project
phases.
T Provid
R e
_ present
4 ation
(Arabic
&
English
) to
explain
all
feature
s in the
solutio
n.
T Provid
R e 2-3
_ minute
5 s'
videos
designe
d
specifi
cally
for
MM
illustrat
ing the
main
feature
s and
advant
ages of
the
solutio
n
T Users
R Trainin
_ g after
6 the
installa
tion &
whene
ver a
major
change
is done
(if
applica
ble).
T Provid
R e
_ Certifie
7 d
Techni
cal On-
Class/P
hysical
Trainin
g
(Outsid
e
Oman)
on the
technol
ogy
propos
ed (and
its
backen
d
Databa
se
(RDB
MS) if
a
dedicat
ed
separat
e
Databa
se
require
d).
T Provid
R e an
_ Onsite
8 Practic
al
Techni
cal
Trainin
g
during
the
Pre-
Go-
Live
Phase,
post
Go-live
and
First
Year
AMC
period
for
MM
Emplo
yees,
as per
the
deploy
ed
solutio
n (and
its
backen
d
Databa
se
(RDB
MS) if
a
dedicat
ed
separat
e
Databa
se
require
d).
T All
R trainin
_ g
9 courses
are
require
d to be
conduc
ted at
certifie
d
trainin
g /
authori
zed
trainin
g
centers
by
certifie
d /
authori
zed
trainers
conside
ring
Arabic
(if
applica
ble)
and
English
.
T Bidder
R s will
_ also be
1 require
0
d to
provide
electro
nic and
hard
copies
of all
trainin
g
materia
ls used
during
the
trainin
g
session
s
conside
ring
Arabic
(if
applica
ble)
and
English
.
T Provid
R e a
_ proper
1 handov
1
er for
the
solutio
n in the
applica
tion
and
DB
level.
T Provid
R e
_ Trainin
1 g
2
whene
ver
require
d for
any
major
change
s or
additio
nal
feature
s
related
to the
solutio
n
functio
nality
or
technic
al
solutio
n
compo
nents .
The AMC period of this scope of work will be for three years.
The AMC will start after six months of the on-site post-
implementation support. The AMC (1st year, 2nd year, and 3rd
year) will be first level support, which requires having:
On-site Techno/Functional Consultants to provide all types of
Technical Support services including analyzing and
developing the new requirements. The consultants should
be qualified enough to provide the required services.
Moreover, the consultants should have at least six years'
experience in the scope of work. Bidders are required to
provide maintenance process plan with the required team
abilities to perform the maintenance.
All required support services and maintenance activities
including all HW and SW for the Solution that ensures the
system version is up-to-date and running smoothly with no
issues.
If the proposed system required/needed a dedicated separate
Database (RDBMS) system, then an On-site DBA & App-
Admin to provide all types of DBA & App-Admin tasks. The
DBA & App-Admin should be certified and qualified enough
to provide the required support on the proposed solution and
its backend Database (RDBMS). In addition, the DBA &
App-Admin should have at least 6 years’ experience on the
proposed solution and its backend Database (RDBMS)
solution.
Note:
Second level support requires having an off-site
Techno/Functional Consultant for all type of Technical
Support services and off-site DBA to provide all types of
DBA tasks if the proposed system required/needed a
dedicated separate Database (RDBMS) system.
nd
MM has the right to change the AMC plan for the 2
year and 3rd year from first-level AMC (on-site) to
second-level AMC (off-site) during the RFP process,
execution of this RFP contract and after awarding.
Bidders must provide the pricing for second-level
support (commercial proposal – optional ITEMS) for 2 nd
and 3rd year AMC.
RFP ( /2025)
RFP ( /2025 )
RFP ( /2024 )
The bidder must use and complete the below table as part of its
Commercial Proposals in the following format:
S U Q T
. Descri n u o
ption i a t
N n
O t a
t
. l
i
P t
r y P
i r
c i
e c
/ e
A (
c O
t M
i R
v )
i
t
y
(
O
M
R
)
1 Study & Assessment
1 Study
. &
A Assess
for
Supply
Chain
Manag
ement
System
2 Software cost and licenses
Softwa
2 re and
. Licens
A e for
Supply
Chain
Manag
ement
System
(and its
backen
d
Databa
se
(RDB
MS) if
a
dedicat
ed
separat
e
Databa
se
require
d) with
breakd
own.
3 Implementation and Testing
3 Imple
. mentat
A ion and
Testin
g for
Supply
Chain
Manag
ement
S U Q T
. n u o
Descri
N i a t
ption
O t n a
. ti l
P t P
r y r
i i
c c
e e
/
(
A O
c M
t R
i )
v
i
t
y
(
O
M
R
)
System
(and its
backen
d
Databa
se
(RDB
MS) if
a
dedicat
ed
separat
e
Databa
se
require
d) with
breakd
own.
4 Certified Training
Certifie
d
4
technic
.
A al
trainin
g for
Supply
Chain
Manag
ement
System
(and its
backen
d
Databa
se
(RDB
MS) if
a
dedicat
ed
separat
e
Databa
se
require
d) with
breakd
own.
(from
mother
compa
ny in
case of
comm
ercial
system
)
5 Onsite support & change implementation for 6
months (Post Go Live Support)
Onsite
5 support
. &
A change
implem
entatio
n
Supply
Chain
Manag
ement
System
(and its
backen
d
Databa
se
(RDB
MS) if
a
dedicat
ed
separat
e
Databa
se
require
d) with
breakd
own.
6 AMC for Supply Chain Management System (and its
backend Database (RDBMS) if a
dedicated separate Database
required) for 1st year
6 First-
. level
A AMC
for 1st
Year
for
Supply
Chain
Manag
ement
System
with
breakd
own.
6 Licens
. e
B Renew
al with
breakd
own
per
module
s/applic
ation
7 AMC for Supply Chain Management System (and its
backend Database (RDBMS) if a
dedicated separate Database
required) for 2nd year
7 First-
. level
A AMC
for 2nd
Year
for
Supply
Chain
Manag
ement
System
with
breakd
own.
7 Licens
. e
B Renew
al with
breakd
own
per
module
s/applic
ation
8 AMC for Supply Chain Management System (and its
backend Database (RDBMS) if a
dedicated separate Database
required) for 3rd year
8 First-
. level
A AMC
for 3rd
Year
for
Supply
Chain
Manag
ement
System
with
breakd
own.
8 Licens
. e
B Renew
al with
breakd
own
per
module
s/applic
ation
Sub
Total
Add
VAT
5%
Grand
Total
Carrie
d to
Grand
Summ
ary
S U T
Description
. n
N i
O t
.
P
r
i
c
e
/
A
c
t
i
v
i
t
y
(
O
M
R
)
1 Hardware Cost
1 Any special hardware
. required for the
A proposed system
2 AMC for Supply Chain Management
System (and its backend Database
(RDBMS) if a dedicated separate
Database required) with upgrades, bug
fixing, security compliance
2 Second-level AMC
. for 2nd Year for SCM
A with breakdown.
2 Second-level AMC
. for 3rd Year for SCM
B with breakdown.
3 Other costs (if any)
Sub Total
Add: VAT 5%
Grand Total
Carried to
Grand
Summary
S RFP Que An
er Prefer stion swe
ia ence r
l
(Secti
on &
Page
Numb
er)
S. Description Payment
No
.
Study & Assess the
1 Current MM Systems, 10%
Services, RDBMS and
Business Processes and
Propose the
Recommended Service
Process to be
implemented as part of
the solution with the
Sign-Off.
2 Pre-Go-Live Sign-Off 20%
3 Go-Live of all 30%
deliverables Sign-Off
4 Post Go-Live Sign-Off 40%
The AMC payments are monthly based
4.9 Exceptions
Evaluation Inquiries
During the evaluation phase, the evaluation team appointed by
MM, and assigned the task of evaluating and ranking submitted
proposals, may require further clarifications or information from
bidders.
All evaluation inquiries shall be forwarded to the points of
contacts appointed by the bidder to receive communications
related to this RFP. All inquiries will be considered as delivered
when forwarded to any of points of contacts appointed by bidder.
Failure by the bidder to respond during the specified time period
in the inquiry may result in lower grades being assigned to the
bidder proposal during the evaluation process and may lead to the
rejection of the proposal.
Responses to inquires shall be considered in the evaluation of the
Bidder’s proposal and may affect the overall ranking obtained by
Bidder. Responses to inquiries may be incorporated in to the
signed contract between both parties.
4.10 Withdrawal & Modifications to Proposals:
Proposal modification and withdrawal terms and conditions are
governed by MM tendering terms and conditions shall always
prevail at all times.
Bidders are not allowed to modify their financial proposal if such
actions are a result of negligence or omissions in the bidder
technical proposal.
4.12 Ownership:
All materials submitted in response to this RFP become the
property of MM and will not be returned to the bidder.
All materials submitted by the winning bidder become the
property of MM.
Contract Termination/Cancellation
After the awarding stage and during the contract period:
Muscat Municipality has the full rights – if required- to evaluate
the need to terminate one or more services or resources from the
defined scope of work of this RFP as well as eliminating the
corresponding proposed cost for that particular scope/resource.
Muscat Municipality reserves also the full rights to evaluate the
need for Contract termination if there was no need to continue
providing the services within the same contract.