Doc no : F-05-14-14
PROCESS FLOW DIAGRAM Rev/Date : 00/08.08.2019
Page : 01 of 01
Process
Part no Customer name Orginated date
reponsibility
Part Core function
Issue No. Revised date
name Team
process Silver Plating Issue Date Prepared by SUJATA D Approved by DANIEL D
Moving / operation with Storage / Despatch Decision
Inspection Operation
transportion inspection
Process Flow Diagram Operation Control Limit
Movement /
Opn.No Operation Movement Operation description Method / Machine / Toolings
transport
Operation with Inspection Store / transport Time Temp
Subcontract/
inspection Inhouse
Customer
10 Receipt of parts - - GRN Entry
20 Inward Inspection - - As per Inspection Plan QP
30 Parts storage - - Stock record
For Blasting Process
30.1
- - Delivery Note
( If Needed )
As Per Customer
40 Glass Bead Blasting Process - -
Specification
DC & Test Reports from
40.1 Receving from Sub-contractor - -
Sub-contractor
As per Inspection Plan
50 Inward Inspection - -
QA/R/01
60 Storage - - Stock record
70 Issue to Production - - Route card
70.1 Buffing (If Required ) - - Work Instruction
Room
70.1
By Daniel D at 6:16 pm, Jun 14, 2022 Intial Cleaning 1-2 Mins Work Instruction
Tempreature
Room
70.2 Water Rinse 2-3 Dips Work Instruction
Tempreature
70.3 Ultrasonic Cleaning 2-5Mins 50°-60°C Work Instruction
Room
70.4 Water Rinse 2-3 Dips Work Instruction
Tempreature
Room
70.4 Water Rinse 2-3 Dips Work Instruction
Tempreature
70.5 Soak Cleaning 10-15 Mins 50-70°C Work Instruction
Room
70.6 Water Rinse 2-3 Dips Work Instruction
Tempreature
Room
70.7 Water Rinse 2-3 Dips Work Instruction
Tempreature
70.8 Anodic Cleaning 3-5 Mins 50-70°C Work Instruction
Room
70.9 Water Rinse 2-3 Dips Work Instruction
Tempreature
Room
70.1 Water Rinse 2-3 Dips Work Instruction
Tempreature
70.10 Copper Plating(If Required) 30-45 Mins 50°-70°C Work Instruction
Room
70.11 Water Rinse 2-3 Dips Work Instruction
Tempreature
Room
70.12 Water Rinse 2-3 Dips Work Instruction
Tempreature
Nickel /Electroless Nickel Plating(If
70.10
13-15 Mins 90°C Work Instruction
Required)
Room
70.11 Water Rinse 2-3 Dips Work Instruction
Tempreature
Room
70.12 Water Rinse 2-3 Dips Work Instruction
Tempreature
As Per Room
70.13 Silver Plating Work Instruction
Thickness Tempreature
Room
70.11 Water Rinse 2-3 Dips Work Instruction
Tempreature
Room
70.12 Water Rinse 2-3 Dips Work Instruction
Tempreature
70.12 Final Hot Rinse 2-3 Dips 40°-60°C Work Instruction
80 Drying 5-10 Mins 30°-40°C Work Instruction
90 Final Inspection Spec Visual As Per Standards
100 Packing & Stored - - Work Instruction
110 For Dispatch - - Work Instruction
ISSUED BY : SUJATA D APPROVED BY : DANIEL D