The document outlines the commissioning and synchronizing report for the SRTPV system, detailing consumer and meter information, grid-tied inverter specifications, and PV module details. It includes verification of earthing and protective systems, as well as inspection and approval requirements from BESCOM. All formats must be submitted online, as offline submissions will not be processed.

Uploaded by

setfusionsales
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
124 views2 pages

Format 6 2020

The document outlines the commissioning and synchronizing report for the SRTPV system, detailing consumer and meter information, grid-tied inverter specifications, and PV module details. It includes verification of earthing and protective systems, as well as inspection and approval requirements from BESCOM. All formats must be submitted online, as offline submissions will not be processed.

Uploaded by

setfusionsales
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Format - 6

Bangalore Electricity Supply Company Limited


(wholly owned Government of Karnataka undertaking)

Commissioning & Synchronizing report of SRTPV system


( Net / Gross metering)

A Consumer Details

1 Name of the Consumer

2 Category

3 RR No./Account ID/Connection ID

4 Pole Number
Bi-directional Meter
Generation
B Meter Details Check
meter
Main Meter Meter
1 Meter make: 1ph / 3 ph

2 Type

3 Serial number

4 Capacity

5 Meter constant

6 Initial reading (Tri vector parameters)

i) Import

ii) Export
Note:
1. The Bi-directional meter records solar generation and existing meter records
installation consumption in case of Gross metering.
2. The Bi-directional meter records export of solar energy to grid and Import of
energy by the installation. Existing meter records the total solar energy
generated.
C Grid Tied Inverter

1 Make
2 Serial number

3 Capacity
4 Input voltage

5 Output voltage
Whether Anti-islanding feature is in
6 working condition Yes/No
D PV Module

1 Make

2 Serial number

3 Type of module

4 Capacity of each module

5 Number of modules

6 Total capacity of module


Earthing verified: DC earthing, AC
E earthing, LA earthing of SRTPV
system Yes/No
 AC & DC DB: Yes/No
Details of protective system  Manual Switch solar side: Yes/No
F available  Relay operated automatic switch
at net-meter side: Yes/No
AEE, BESCOM inspection &
G approval letter obtained Yes/No

Work completion report of SRTPV


H system obtained from agency Yes/No

Date of synchronizing
I with BESCOM grid dd/mm/yyyy

AEE(Ele.)/EE(Ele.) AEE(Ele.)/EE(Ele.) Name &


MT S/D/Dvn,--------------, BESCOM O&M---------------, BESCOM Signature of Consumer

Note: All SRTPV formats should be updated in online portal and no offline format
shall be processed.

You might also like