New Layout - Orean Foam-3
New Layout - Orean Foam-3
CATV 4
MDF
B119
EXHAU
ST AIR
TELCO-0 SHAFT
1 2
TELCO
-02
8
T2-8
R.C.
9 EXHAU
PLENU
ST
M
LINE OF
GROUN
D FLOO
R
B128
T1-1 10
FEMALE
TOILET
JAN-01
MALE
TOILET
REF
B130
PANTRY
RAMP S
11
STO. OFFIT
Ø75
SECURITY ROOM
BLADDER VENT/FILL
AUX.-01 4 COMPOSTABLE FUEL STO. TANK
FE-01
PE/SE
FOOD
WASTE
WASTES Ø2
5
S Ø25 Ø25 Ø25 S
12
PL./SAN.-01 EE-01
4
T1-3
CONCENTRATE SUPPLY VALVE
MAINTENANCE ROOM
HOUSEKEEPING
ROOM
T1-4
1
AFT
SH
R
AI
UST
HA
EX
SPRINKLER HEAD TABULATION
PROVISION OF PREACTION SYSTEM FOR OIL TYPE
EXTENDED 8 TRANSFORMER ROOM 06/25/18
SIDEWALL
UPRIGHT 165°F UPRIGHT 212°F PENDENT 165°F PENDENT 212°F SIDEWALL PROVISION OF SPRINKLER SYSTEM W/ HIGHER
06/25/18
Number of 165°F 7 TEMPERATURE RATING AT GENERATOR RM.
FLOOR LEVEL 165°F Subtotal
Floors PROVISION OF SENSING LINE TO CONTROL PANEL
6 & WATER LEVEL INDICATOR INTERFACING TO FDAS 06/25/18
(Standard (Standard (Standard (Standard (Standard (Extended POWERHOUSE EE ROOM TO BE PROTECTED BY
5 PREACTION SUPPRESSION SYSTEM. 06/25/18
Coverage) Coverage) Coverage) Coverage) Coverage) Coverage)
OREAN PLACE N 1
REMOVAL OF SPRINKLER @ TOILET WITH LIMITED
COMBUSTIBLE MATERIAL AS PER EMCD BULLETIN 03/15/2018
CONSTRUCTION
BULLETIN NO. 1
RA 9266 SECTION 33
MECHANICAL CONSULTANT
FIRE-PROTECTION CONSULTANT DRAWINGS AND SPECIFICATIONS AND OTHER STRUCTURAL CONSULTANT ARCHITECT FIRE PROTECTION
MECHANICAL CONSULTANT
CONSULTANT QUANTITY SURVEYOR PROJECT OWNER SHEET CONTENTS PROJ. NO. B10654
CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED,
AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL SY^² + ASSOCIATES,Inc CH PEREZ Bros. Consultancy
PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER BASEMENT 1 SHEET NO.
THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
Unit 504 Pryce Center, 1179 Chino Roces
Corp.
FORTUNATO R. DAVANTES, JR
NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO
DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR
USE IN THE REPETITION OF AND FOR OTHER PROJECTS OR
BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE,
Avenue corner Bagtikan St, Makati City
Architecture Interior Design Planning Graphic Environments
30/F Ayala Life FGU Centre 6811 Ayala Avenue, Salcedo Village 1229 Makati City, Philippines
T +632 758 8888 F +632 758 2888 / 758 3888 E philippines@aidea.com.ph W www.aidea.com.ph
ENGINEERING MANAGEMENT
Unit 2007 20th Floor, The Trade and Financial Tower
SUSTAINABILITY
32nd St. cor. 7th Ave., Fort Bonifacio, Taguig City 1634
Philppines
Tel. Nos.: (02) 856-4262 / 856-4283
Fax No.: (02) 856-6065
www.ecosolutions.com.ph
Suite 3B, St. Mary's Bldg., No.5 Central
Ave., New Era, Q.C., Philippines
AYALA LAND, INC. FIRE-PRO LAYOUT
WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR 31st Floor, Tower One & Exchange Plaza, Ayala Triangle, Ayala
FP1-CD-03A
ENGINEERING MANAGEMENT SUSTAINABILITY PROFESSIONAL MECHANICAL ENGINEER OF SAID DOCUMENTS. ELECTRICAL CONSULTANT PLUMBING CONSULTANT LANDSCAPE CONSULTANT
Unit 2007 20th Floor, The Trade and Financial Tower Tel. Nos.: (02) 856-4262 / 856-4283 Avenue, Makati City
32nd St. cor. 7th Ave., Fort Bonifacio, Taguig City 1634 Fax No.: (02) 856-6065 PRC NO. 4368 CAD: APPROVED: Inspira Design Core, Inc.
Philppines www.ecosolutions.com.ph IAPOA NO. Validity 07 JULY 2017
FPA
ENGINEERING MANAGEMENT SUSTAINABILITY ENGINEERING MANAGEMENT SUSTAINABILITY
27 Malipajo corner Mercury Road Pilar
PTR NO. 3303897 CHECK: DATE:
Date Issued 20 JAN 2017 Unit 2007 20th Floor, The Trade and Financial Tower Tel. Nos.: (02) 856-4262 / 856-4283 Unit 2007 20th Floor, The Trade and Financial Tower Tel. Nos.: (02) 856-4262 / 856-4283