Control Plan
Control Plan
MACHINE NAME :-
SPECTRO MACHINE
INGOTS INWARD INSPECTION
04 Manganese 0.30 % max. Chemical analysis 1 NO / BATCH 1 NO / BATCH Spectro report IF SPECIFICATION IS OUT
OF TOLERANCE REJECT
10 A HOLD THE LOT THE MATERIAL AND
SENT BACK TO THE
05 Magnesium 0.20 – 0.80 % Chemical analysis 1 NO / BATCH 1 NO / BATCH Spectro report SUPPLIER
Rev No. : 00 Describtion : First release Revision Date [Control Plan] : 10/08/2023 Approved by : Ramesh Shinde
Control Plan No :- CP/ABB/VX3/7482/20
JIG. & FIXTURE NO. :- IF RETURNS ARE NOT
CHARGE PREPERATION
AVAILABLE AS PER
01 FRESH ALLOYS 40 % Of Charge mix Weighing Scale EVERY HEAT EVERY HEAT MELTING LOG SHEET STANDARD CHARGE
LM25 MIX, USE FRESH
20
MACHINE NAME :- 02 RETURNS 60 % Of Charge mix Weighing Scale EVERY HEAT EVERY HEAT MELTING LOG SHEET RESET OR INFORM TO INDTED, DO NOT USE
WEIGHING SCALE SUPERVISOR RETURNS ABOVE 60%
TOOL :-
03
Rev No. : 00 Describtion : First release Revision Date [Control Plan] : 10/08/2023 Approved by : Ramesh Shinde
Control Plan No :- CP/ABB/VX3/7482/30
JIG. & FIXTURE -
01 Cleaning of furnace Inside of furnace should be clean. Visual Before Melting NA DAILY MELTING LOG SHEET
RESET OR INFORM TO
SUPERVISOR
MELTING
MACHINE NAME :- NA 02 Addtion of raw AS PER OP. NO 20 Weighing balance Before Melting NA
30 material
TOOL :- Crane,
spanners, allen key, etc 03
Rev No. : 00 Describtion : First release Revision Date [Control Plan] : 10/08/2023 Approved by : Ramesh Shinde
Control Plan No :- CP/ABB/VX3/7482/40
01 Treatment TEMEPRATURE DISPLAY ONCE IN HOUR ONCE IN HOUR PROCESS MONITERING CHECK
temperatture 725º ± 5º SHEET
02 Addition of flux & 200gm per 100kg WEINGH SCALE ONCE IN HEAT ONCE IN HEAT MELTING LOG SHEET
removing the dross
03 Degassing Time 14 ~ 16 minute TIMER AUTOMATIC STOP ONCE IN 45 MIN ONCE IN HEAT MELTING LOG SHEET
MACHINE NAME :- AFTER CYCLE
MELTING CUM
HOLDING FURNACE
04 N2 Flow Rate 12 ~ 18 LPM DISPLAY UNIT ONCE IN HEAT ONCE IN HEAT MELTING LOG SHEET
TOOL :- NA
05 N2 Pressure 3 ~ 5 bar PRESSURE DIAL ONCE IN HEAT ONCE IN HEAT MELTING LOG SHEET
06 DI VALUE < 2.7 DI MACHINE ONCE IN HEAT ONCE IN HEAT MELTING LOG SHEET
07 Addition of TiB (5:1) 200gm per 100kg WEINGH SCALE ONCE IN HEAT ONCE IN HEAT MELTING LOG SHEET
METAL TREATMENT
40 08 Addition of Sr 200gm per 100kg WEINGH SCALE ONCE IN HEAT ONCE IN HEAT MELTING LOG SHEET RESET OR INFORM TO
SUPERVISOR
Rev No. : 01 Describtion : Rotor Speed Added. Revision Date [Control Plan] : 23/04/2025 Approved by : Ramesh Shinde
Control Plan No :- CP/ABB/VX3/7482/50
01 Die temperature Min 300°C Temperature Gun ONCE IN HOUR ONCE IN HOUR FIRST OFF & STAGE INSPECTION
REPORT
02 Pouring temperature Temperature Gun ONCE IN HOUR ONCE IN HOUR FIRST OFF & STAGE INSPECTION
730º ± 5ºC REPORT
03 Use of shell cores Core insert in Die Visual 100% ONCE IN HOUR FIRST OFF & STAGE INSPECTION
REPORT
MACHINE NAME :- TILT
GRAVITY MACHIINE
04 Placement of shell cores Sand should not fall in the die while placing the core Visual 100% ONCE IN HOUR FIRST OFF & STAGE INSPECTION
in the die in the die REPORT
05 Tilting Time 12-15 Sec Timer AUTO TILTING AT THE START OF SHIFT AT THE START OF SHIFT FIRST OFF & STAGE INSPECTION
REPORT
TOOL :- NA
06 Solidification Time 120 sec + 10 Sec Timer Buzzer AT THE START OF SHIFT AT THE START OF SHIFT FIRST OFF & STAGE INSPECTION
REPORT
07 Wall thickness 23 ±0.5 Vernier AT THE START OF AT THE START OF FIRST OFF & STAGE INSPECTION
SETUP SETUP REPORT
08 OD Ø 148 ± 0.20 Vernier ONCE IN HOUR ONCE IN HOUR FIRST OFF & STAGE INSPECTION
REPORT
09 OD Ø 105 ± 0.20 Vernier ONCE IN HOUR ONCE IN HOUR FIRST OFF & STAGE INSPECTION
REPORT
DIE CASTING
50 RESET OR INFORM TO
SUPERVISOR
12 Total Height 224±1
13 Width 40±0.5
14 Width 30±0.5
15 Distance 80±0.5
16 Ribs at pad Visuali ok Visual 100% ONCE IN HOUR FIRST OFF & STAGE INSPECTION
REPORT
17 Calender punch as per month Visual 100% ONCE IN HOUR FIRST OFF & STAGE INSPECTION
REPORT
18 Ejection Pin mark 0.50 projection or depression -- ONCE IN HOUR ONCE IN HOUR FIRST OFF & STAGE INSPECTION
REPORT
20 Visual Defects Unfill,cold shut,ejector pin marks, sand --- 100% ONCE IN HOUR FIRST OFF & STAGE INSPECTION
removal,warpage,blow hole, shrinkage,crack REPORT
W23J31B
21 Heat code punch Visual 100% ONCE IN HOUR FIRST OFF & STAGE INSPECTION
(W-WELLPRO,23- YEAR CODE,J-MONTH CODE,31 - REPORT
DATE CODE,B- SHIFT)
Rev No. : 00 Describtion : First release Revision Date [Control Plan] : 10/08/2023 Approved by : Ramesh Shinde
Supplier/Plant : WELLPRO
Prototype Prelaunch Production Key Contact / Phone : RA
Part Name/Description : VX-3 Core Team:- RAMESH SHI
Part No/Latest Change Level : 1HC0027482 Customer Name -: HITACH
Casting Drawing NO. -: NA Assly Drawing NO. - :
Characteristics
Gun
01
Placement
MACHINE NAME :- Decoring
DECORING
Gun
10 Visual
02
Defects
TOOL :- NA 03
No under
01 cut / no
over cut
MACHINE NAME :- Cutting
DEGATING
TOOL :- NA 03
01 Shots size
MACHINE NAME :- Shot
SHOT BLASTING
Blasting Machine
40 02 Cycle time
Uniform
TOOL :- NA 03 Casting
surface finish
VISUAL
50 MACHINE NAME :- NA 01
DEFECTS
At the riser of
Decoring Gun
Part
As per master
Visual
sample
CHECKED BY :- RANAJIT PISHTE
As per master
Visual
sample
Shot Size
Party Test Report
0.40mm
Visually
Visual
accepted
as per
Visual
accepatance
Sample Frequency
Control
Reaction Plan Corrective Action
Method
Checking Frequency Record Frequency
100% NA NA
RESET OR
100% NA NA INFORM TO
SUPERVISOR
100% NA NA
Inform to
Tool room
supervisor
Inform to
Tool room
supervisor
Inform to
100% NA NA Tool room
supervisor
Inform to
Tool room
supervisor
Inform to
100% NA Tool room
supervisor
ONCE IN ONCE IN
01 Die temperature Min 300°C Temperature Gun
HOUR HOUR
ONCE IN ONCE IN
02 Pouring temperature 730º ± 5ºC Temperature Gun
HOUR HOUR
ONCE IN
03 Use of shell cores Core insert in Die Visual 100%
HOUR
Sand should not fall
Placement of shell in the die while ONCE IN
04 Visual 100%
cores in the die placing the core in HOUR
the die AT THE AT THE
05 Tilting Time 12-15 Sec Timer START OF START OF
SHIFT SHIFT
AT THE AT THE
06 Solidification Time 120 sec + 10 Sec Timer START OF START OF
SHIFT SHIFT
AT THE AT THE
07 Wall thickness 23 ±0.5 Vernier START OF START OF
SETUP SETUP
ONCE IN ONCE IN
08 OD Ø 148 ± 0.20 Vernier
HOUR HOUR
ONCE IN ONCE IN
09 OD Ø 105 ± 0.20 Vernier
HOUR HOUR
ONCE IN ONCE IN
10 width 13.0 ± 0.8 Vernier
HOUR HOUR
ONCE IN ONCE IN
11 width 13 ± 0.80 Vernier
HOUR HOUR
13 Width 40±0.5 0 0 0
14 Width 30±0.5 0 0 0
15 Distance 80±0.5 0 0 0
ONCE IN
16 Ribs at pad Visuali ok Visual 1
HOUR
ONCE IN
17 Calender punch as per month Visual 1
HOUR
Corrective Action -
Reaction Plan - Reset or Inform to the Suervisior.
Inspected By-: Approved By-:
QCA-F-14, Rev. No. 00