Fence Elevation: ST1 ST2 SA

The document outlines specifications for constructing septic tanks and associated drainage systems, emphasizing the exclusion of air to promote bacterial growth for sludge liquefaction. It details the materials, dimensions, and installation requirements to ensure proper function and prevent blockages. Additionally, it includes maintenance instructions for the septic system to ensure effective operation over time.

Uploaded by

sarpongfelix700
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views1 page

Fence Elevation: ST1 ST2 SA

The document outlines specifications for constructing septic tanks and associated drainage systems, emphasizing the exclusion of air to promote bacterial growth for sludge liquefaction. It details the materials, dimensions, and installation requirements to ensure proper function and prevent blockages. Additionally, it includes maintenance instructions for the septic system to ensure effective operation over time.

Uploaded by

sarpongfelix700
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NOTE:

NOTE
Air should be excluded from s.t.l. to encourage the growth of amaaic bacteria to liquify sludge to facilitate the flow of the effluent accumated gasses are expected to be connected and expelled through f.a.o which should carried
above eave be protected against nestling of birds as in drawing. drains should be givien sufficient falls and joints should be properly made to prevent blocking of the apperture and expedite the excape of accummulated gasses.
septic tanks must be construd in concrete and not sandecrete blocks top of septic tank to be not less than 150mm above finished ground level where two or more water closets connected to the same soil pipe the trap on each
water closet other than the highest shall be ventilated to be an antisyphon pipe to the open air at point 75mm above the water seal in the highest water antisyphon pipe and connection should be at 50mm intervals and shall be
connected with the arm of soil sipe at point not less than 150mm and not more than 300mm from the highest point of the water seal which is nearest to the soil pipe

SA
ST1 ST2
75

MH
75
1200

2250

ground level
+ 00 FENCE ELEVATION ground plan
earth 1200 1200
226 600

SA
foundation 450
MH ST1 ST2
SECTION V-V V

2400
1201 1201

450
1001 links
450

450
1201 1201
section
450

450 4500 450 1050 450 2600 300 2600 300 precast system,cross section
ballon cage to svp termination
above roof level

FENCE WALL PLAN V


500

50 600x600 precast conc manhole cover

100
soil and vent pipe

600
2100

sludge level
non return valve
PROJECT:

PROPOSED RESIDENCIAL FACILITY FOR


reinforced concrete wall

flushing cistern

soak away
225mm average depth

cistern overflow pipe


2100
3000
375

benching to full

2700
wc with 50mm
minimum seal 50mm dia. anti - syphonage pipe bore channel
LOCATION:
225

baffle wall Acheampong Akuapem North


1200
front height inspection eye
1350 Eastern
12mm smooth paster
hardcore filling

reinforced conc. wall


concrete
benching floor gradient
mortar mix for joint 12' 2" grips
should be made under joint.
225

to septic tank
concrete base

300
foundation concrete TITLE
allow shanks of drains to rest on rammed SHEET NO:
earth base (drain gradient 21-40) 450
50mm blinding

17
900

longitudinal section
cross section
SEPTIC TANK DETAILS & FENCE WALL

CLIENT:
450

Dunu Antoinnette Amma


3000

soak away
1800
750

perforated pipe should be removed every 3 months and 750

perforated of slots cleaned with wire brush top over of filter


section DRAWN BY: JOB
450

median should be examined and nessary turned over and cleaned


every 2 mont. it may be necessary on account of clogging to MARY DOFENYO (+(233) - 246 - 568328 )

remove part of median and renew.s.t.should be opened every six 750 225 1350 150 1200 225 3000 225

months and depth ot top crust scertaine if this exceeds 12 plus DESIGN BY:
should be removed.
ground plan
MARY DOFENYO (+(233) - 246 - 568328 )

DATE:
June,2025

SCALE: 1 : 100

Note: All diamension are in millimater and go through diamension befroce setting out excuvation