To,
The Provincial
................................
Montfort kindergarten
Fathima ITI Campus
Fathima Nagar
Warangal.
Dear Sir,
Sub: Undertaking for proposed construction of
Quotation and Specifications- Reg.
I the undersigned being the authorized person representing the above builders, submitting Plans,a
Quotation, Specifications as per your requirements. Kindly go through it and if you are satisfied
with the said specification and accepted we are prepared and under take to commence the construction
work in accordance with your work order.
If you are confirmed the work order then we will also submit the following
drawings
a).Structural Plan
b).Civil Plans
c). Elevation 2D/3D Designed Color Photo Copy
Work will be completed with in 18 months after receiving the permission copy of municipal
Corporation Authority and your work order.
We shall be grateful if you provide us opportunity to get our execution of works at your almost
satisfaction.
Encloses
1.Civil Plans
2.Quotation
3.Specifications
4.Terms and Conditions
Your Sincerely
Thanking you in anticipation SR CONSTRUCTIONS
SPECIFICATION FOR MONTFORT KINDERGARTEN BUILDING AT FATHIMAITI
COMPUS FATHIMANAGAR WRANGAL.
Structure RCC Framed Structure and P.T. Technology for Dias only
Super Structure 9'' Thick External Walls and 4'' Internal Walls in Light Weight Clay Bricks
Plastering Sponge Finish inside and Out side
Steel MS 550 Q Sujana, Vizag,Jindal ISI brand with testing report.
Cement JP Cement, Bharati,Ambuja, Ultratech
Doors Teak Wood Frames with Green ply HDF Flush Shutters with 7 Yrs.Company
Garentee Letter Or Lamination Flush Shutters with SS or Aluminum Fixings
Windows Teak Wood Frames and Teak Shutters Frame with Elegantly Designed Class
Fixing M.S. Safety Grills and Standard HardwareFixings (or) UPVC Windows.
Electrical Concealed Copper Wiring with Finolex (or)Polycab Cables
Conduces of Standard Modular Switches, Anchor Roma, Heavells, Vimal.
Elevetion as per architect plan.
Flooring Than door Blue Flooring
Tiles Toilets Glazed tiles up to 6'0'' height and Toilets Flooring
Railing S.S. Railing with Jindal Brand
Land Scraping land Leveling as per architect plan
PAINTING
Painting 1 Coat primer 2 Coats Apex Acrylic emulation for external walls.
1 Coat primer 2 Coats Interior Emulation paint for internal walls
and ceiling Enamel Paint for Windows , Doors and M.s.Grills
Dustbin Toys designed required dust bins provided
Black board Green ply board and green glass boards each class room (4x8)
Selves as your required area
CIVIL WORKS
a) G+2 (Three) Floors School Building as per Plan
b) 2 Nos, Staircase rooms
c) Water Tank
d) Septic Tank
e) Drainage lane with ISI Brand Clay Mud pipes up to Septic Tank
f) Elevation work as per architect plan after copletion of total 3 floors
g) List 2 Nos.
TERMS & CONDITIONS
1 Power and water should be supplied by the land owner, for the construction
of project under the terms and agreement.
2 The amount dues are payable towards the completion of the project
according to the payment schedule which was provided with quotation.
3 I agree and assure that, I alone will be responsible for the damages
accidents,/if any/ causedto machinery or labour during the course of
construction.
4 I agree to complete the project in a period of 18 months from the date of
getting permissions from statutory bodies and a work order from your
side albeit with a clause that the required payments to be made from your
side at intervals mentioned by me supra should be adhered to for my
compliance.
5. If Required lift Exction Extra Payment.
CONSTRUCTION AREA DETAILS
Construction Area as per engineer plans as below.
a) Ground Floor 19268.00 Sq.Fts.
b) First Floor 18172.00 Sq.Fts.
c) Second Floor 18172.00 Sq.Fts.
Total Slab Area 55612.00 Sq.Fts.
PROJECT COST DETAILS
Construction Estiated Cost as per our abstract
a) Ground Floor 19268.00 Sq.Fts. @ Rs. 1000.00 Per S.Fts. Rs. 19268000.00
b) First Floor 18172.00 Sq.Fts. @ Rs. 900.00 Per S.Fts. Rs. 16354800.00
c) Second Floor 18172.00 Sq.Fts. @ Rs. 950.00 Per S.Fts. Rs. 17263400.00
Total Civil Work Cost Total Rs. 52886200.00
Water Suply & Sanitary 15% Cost of Civil Work Rs. 7932930.00
Internal Electrification 10% Cost of Civil Work Rs. 5288620.00
External Electrification LS Rs. 500000.00
Cables,Panel Boards Ect.
Water supply Boaring,Sump moter LS Rs. 300000.00
Fire Protection Equpment & Pipeline LS Rs. 500000.00
Land levaling as per architech plan. LS Rs. 1000000.00
Total Project cost Rs. 68407750.00
(Rupees Six Crores Eighty Four Lakhs Seven Thoused Seven Hundred and Fifty only)