LV Switchgear PS-1

The document contains specifications for power and control circuit cable sizes and terminal block (T.B) ratings for Schneider Electric. It includes a table detailing current ratings for various cable sizes and colors, as well as standards for indication lights and push buttons. Additionally, it emphasizes that the drawing is proprietary and cannot be reproduced without authorization from Schneider Electric.

Uploaded by

AAMIR QAMAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views59 pages

LV Switchgear PS-1

The document contains specifications for power and control circuit cable sizes and terminal block (T.B) ratings for Schneider Electric. It includes a table detailing current ratings for various cable sizes and colors, as well as standards for indication lights and push buttons. Additionally, it emphasizes that the drawing is proprietary and cannot be reproduced without authorization from Schneider Electric.

Uploaded by

AAMIR QAMAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 59

SPECIAL NOTE

POWER CIRCUITS CABLE & T.B SIZE TABLE CONTROL CIRCUITS CABLE & T.B SIZE TABLE THIS DRAWING IS THE EXCLUSIVE PROPERTY OF OF
(SCHNEIDER ELECTRIC) AND MAY NOT BE COPIED,
EXPLODED DUPLICATED,REPRODUCED TO THE
CURRENT COLOUR mm2 CURRENT T.B THIRD PARTY IN ANY FORM WITHOUT THE PRIOR
SR/NO. mm T.B CIRCUIT RATING COLOUR WRITTEN AUTHORIZATION
RATING OF SCHNEIDER ELECTRIC LTD.
AC 1 13.5A Black
1 1.5 17.5A Black SPECIAL INSTRUCTIONS
AC 2.5 24A Black
2 2.5 24A Black
DC +VE 1 17.5A Red
3 4 32A Black
DC -VE 1 17.5A Blue
4 6 41A Black
Earth 2.5 24A Green/Yellow
5 10 57A Black
FOR APPROVAL
6 16 72A Black FOR MANUFACTURING

AS BUILT
7 25 101A Black
DESCRIPTION

8 35 125A Black LVSG PS-01

9 50 151A Black .......... CLIENT

DESCON ENGINEERING

PROJECT
NOTE: SCHNEIDER ELECTRIC

FOR RS-485
AL CONSULTANT

Communication use
Twisted Pair Shielded
O V N/A

R
PROJECT NO
Cable.
P GTD-586261124-REV02

AP DRAWING NO

OR
SEWD1-586261124

F MO NUMBER

MO-N/A

REVISION

STANDARDS OF INDICATION LIGHTS & PUSH BUTTONS REV. DATE DESCRIPTION OF MODIFICATION BY

01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R

02
Indication Lamp COLOR Push Button COLOR 03

04
Phase Indication R-Y-B
STANDARDS CIRCUIT CABLES OF CT, PT AND EARTH On Indication Green ON Push Button Green DESIGN BY M.R DRAWN DATE 16-05-2025

CHECKED BY N.A SCALE N.T.S


CONTROL CIRCUIT Off Indication Red OFF Push Button Red
BLACK RE-CHECKED BY M.R REV NO 00
Trip Indication YELLOW Lamp Test Black APPROVED BY S.A
PT CIRCUIT BLACK
SHEET NO:
Heater On Red Reset/Ack. Blue 01 OF 51

RED
Acknowledge Blue Emergency Stop Red
CT CIRCUIT YELLOW Service Blue
BLUE Earth Switch On Green
EARTH CIRCUIT GREEN Test Indication White
1 2 3 4 5 6 7 8

SYMBOL DEVICE No. DESCRIPTION SYMBOL DEVICE No. DESCRIPTION SYMBOL DEVICE No. DESCRIPTION SYMBOL DEVICE No. DESCRIPTION

COIL NO CONTACT NC CONTACT


MF -P80 MULTI FUNCTION METER
A A1 13 11
-C1 AUXILIARY CONTACTOR -F1 MCB -H HEATER
A
A2 14 12
KW -P81 ENERGY METER

COIL CHANGE OVER CONTACT INDICATION LIGHT


11 OFF : RED COLOUR A -P1, -P2, -P3 AM-METER
A1 12 14 ON : GREEN COLOUR
-R1 AUXILIARY RELAY -H1 -R1 BELL
22 TRIP : YELLOW COLOUR
A2 11 RESET : BLUE COLOUR V -P16 VOLT METER

COIL NO NC POWER NO CONTACT NC CONTACT


CONTACT CONTACT CONTACT PF -P55 POWER FACTOR METER
A1 3 1 1L1 3 1
-K1 MAGNETIC CONTACTOR -S1 ILLUMINATED PUSH -R2 BUZZER
BUTTON
B A2 4 2 1T1 4 2 VSS -S70 VOLT SELECTOR SWITCH B
COIL NO CONTACT NC CONTACT NO CONTACT NC CONTACT PUSH BUTTON
OFF : RED COLOUR ASS -S69 AM-SELECTOR SWITCH
A1 5 1 3 1 ON : GREEN COLOUR
-KT1 ON DELAY TIMER -S1 TRIP : YELLOW COLOUR -R3 SIREN
A2 7 3 4 2 TEST : WHITE COLOUR 26 -F26 TRANSFORMER STATUS RELAY
RESET : BLUE COLOUR
COIL NO CONTACT NC CONTACT NO CONTACT NC CONTACT
EMERGENCY PUSH 27 -F27 UNDERVOLTAGE RELAY
A1 5 1 3 1 BUTTON CAPACITOR BANK
-KT11 OFF DELAY TIMER -S1 -C1
RED COLOUR UNDERCURRENT OR
A2 7 3 4 2 37 -F37
UNDERPOWER RELAY

COIL NO CONTACT NC CONTACT REVERSE-PHASE OR


C 46 -F46
PHASE-BALANCE CURRENT RELAY C
L1 97 95
-F49 OVER LOAD RELAY -Q8 DISCONNECTOR SWITCH -M MOTOR
98 96 41 -F41 REVERSE-SEQUENCE OR
1L1
PHASE-BALANCE VOLTAGE RELAY
NO CONTACT NC CONTACT
49 -F49 THERMAL OVERLOAD RELAY
3 1 VACCUME CIRCUIT -T11 VT
-S11 LIMIT SWITCH -Q42 -T12
BREAKER (VCB) (VOLT TRANSFORMER)
-T13 INSTANTANEOUS AC
4 2 50 -F50
OVERCURRENT RELAY
2-REMOTE

NO NC
1-LOCAL

INSTANTANEOUS AC EARTH FAULT


CONTACT CONTACT 50N -F50N
CT RELAY
0-OFF

L1 L2 L3
-T1
-S1 SELECTOR SWITCH -Q42 AIR CIRCUIT BREAKER -T2 (CURRENT TRANSFORMER)
3 1
(ACB) -T3 AC INVERSE TIME OVERCURRENT
T1 T2 T3
51 -F51
D 4 2 RELAY D
L1 L2 L3
51N -F51N AC INVERSE TIME EARTH FAULT
X1 X1 X1 TB MOLDED CASE RELAY
-X1,X2,X3 -Q42 CIRCUIT BREAKER -LA LIGHTING ARRESTOR
1 1 1
(TERMINAL BLOCK)
T1 T2 T3
(MCCB) 51G -F51G AC EARTH LEAKAGE RELAY

L1 55 -F55 POWER FACTOR RELAY


1 2

-F23 THERMOSTATE -F1 H.R.C. FUSE FERRULE/WIRE NO.


1L1 67 -F67 DIRECTIONAL OVERCURRENT RELAY

COLOUR BLACK
67N -F67N DIRECTIONAL EARTH FAUL RELAY
E 1.0mmSq. CONTROL WIRING Z.C.T E
-F FAN 2.5mmSq. C.T WIRING -T51G ZERO SEQUENCE
UNLESS SPECIFIED CURRENT DETECTION CT
-X51 RELAY TEST BLOCK
OTHERWISE

REVISION
FOR APPROVAL DESCRIPTION SYMBOL PAGE DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 02 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

LV PANELS FOR PS-1


A A

B B

OUTGOING BUS SECTION-A


CUBICAL-01 CUBICAL-02 CUBICAL-03 CUBICAL-04
415V, 1000A, 3P+N+E, 50Hz, 25kA, 1S

TO NEXT
SHEET
PFI PF
RESLAY METER
ON

ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP
ON PB -S21 OF PB

A/O/M ON PB OFF PB ON PB OFF PB ON PB OFF PB ON PB OFF PB ON PB OFF PB ON PB OFF PB ON PB OFF PB ON PB OFF PB ON PB OFF PB ON PB OFF PB ON PB OFF PB ON PB OFF PB ON PB OFF PB ON PB OFF PB

C -P1
A.M 3XC.Ts
150/5A
-S21

A/O/M
-S21

A/O/M
-S21

A/O/M
-S21

A/O/M
-S21

A/O/M
-S21

A/O/M
-S21

A/O/M
-S21

A/O/M
-S21

A/O/M
-S21

A/O/M
-S21

A/O/M
-S21

A/O/M
-S21

A/O/M
-S21

A/O/M
-Q -Q -Q C
FP MCCB FP MCCB FP MCCB
16A 125A 100A
-Q -Q -Q -Q -Q -Q -Q -Q -Q -Q -Q -Q -Q -Q -Q
TP MCCB MPCB TP MPCB TP MPCB TP MPCB TP MPCB TP MPCB TP MPCB TP MPCB TP MPCB TP MPCB TP MPCB TP MPCB TP MPCB TP MPCB TP
125A 13~18A 13~18A 13~18A 13~18A 13~18A 13~18A 17~23A 17~23A 17~23A 17~23A 17~23A 17~23A 17~23A 17~23A

-P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1
3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts
A.M 30/5A
A.M 30/5A
A.M 30/5A
A.M 30/5A
A.M 30/5A
A.M 30/5A
A.M 30/5A
A.M 30/5A
A.M 30/5A
A.M 30/5A
A.M 30/5A
A.M 30/5A
A.M 30/5A
A.M 30/5A
A.M 30/5A
A.M 150/5A
A.M 100/5A
HRC
FUSE
32A
-K1 -K1 -K1 -K1 -K1 -K1 -K1 -K1 -K1 -K1 -K1 -K1 -K1 -K1
TP M.C TP M.C TP M.C TP M.C TP M.C TP M.C TP M.C TP M.C TP M.C TP M.C TP M.C TP M.C TP M.C TP M.C
18A 18A 18A 18A 18A 18A 25A 25A 25A 25A 25A 25A 25A 25A

EOCR EOCR EOCR EOCR EOCR EOCR EOCR EOCR EOCR EOCR EOCR EOCR EOCR EOCR
TP 5~60A 5~60A 5~60A 5~60A 5~60A 5~60A 5~60A 5~60A 5~60A 5~60A 5~60A 5~60A 5~60A 5~60A
M.C
32A

TORIDE.C.T TORIDE.C.T TORIDE.C.T TORIDE.C.T TORIDE.C.T TORIDE.C.T TORIDE.C.T TORIDE.C.T TORIDE.C.T TORIDE.C.T TORIDE.C.T TORIDE.C.T TORIDE.C.T TORIDE.C.T
E.L.R 65A E.L.R 65A E.L.R 65A E.L.R 65A E.L.R 65A E.L.R 65A
E.L.R 65A E.L.R 65A E.L.R 65A E.L.R 65A E.L.R 65A E.L.R 65A E.L.R 65A E.L.R 65A

D D
( 4 STAGE)
STAGES-1 TO 4(12.5KVAR)

PFI 45KVAR
0.6/1kV,Cu/PVC/PVC-4C (3P+E)-16 mm2

0.6/1kV,Cu/PVC/PVC-4C (3P+E)-16 mm2

0.6/1kV,Cu/PVC/PVC-4C (3P+E)-16 mm2

0.6/1kV,Cu/PVC/PVC-4C (3P+E)-16 mm2

0.6/1kV,Cu/PVC/PVC-4C (3P+E)-16 mm2

0.6/1kV,Cu/PVC/PVC-4C (3P+E)-16 mm2

0.6/1kV,Cu/PVC/PVC-4C (3P+E)-10 mm2

0.6/1kV,Cu/PVC/PVC-4C (3P+E)-10 mm2

0.6/1kV,Cu/PVC/PVC-4C (3P+E)-16 mm2

0.6/1kV,Cu/PVC/PVC-4C (3P+E)-16 mm2

0.6/1kV,Cu/PVC/PVC-4C (3P+E)-16 mm2

0.6/1kV,Cu/PVC/PVC-4C (3P+E)-16 mm2

0.6/1kV,Cu/PVC/PVC-4C (3P+E)-16 mm2

0.6/1kV,Cu/PVC/PVC-4C (3P+E)-16 mm2


FOR AIR OUT-EXHAUST (7.5KW EACH)

FOR AIR OUT-EXHAUST (7.5KW EACH)

FOR AIR OUT-EXHAUST (7.5KW EACH)

FOR AIR OUT-EXHAUST (7.5KW EACH)

FOR AIR OUT-EXHAUST (7.5KW EACH)

FOR AIR OUT-EXHAUST (7.5KW EACH)

11 KW TOTAL LOAD (1-STANDBY)


11 KW TOTAL LOAD (1-RUNNING)

FOR FRESH AIR IN (11KW EACH)

FOR FRESH AIR IN (11KW EACH)

FOR FRESH AIR IN (11KW EACH)

FOR FRESH AIR IN (11KW EACH)

FOR FRESH AIR IN (11KW EACH)

FOR FRESH AIR IN (11KW EACH)


SUMP DRAINAGE PUMPS

SUMP DRAINAGE PUMPS

CENTRIFUGAL FANS - 01

CENTRIFUGAL FANS - 02

CENTRIFUGAL FANS - 03

CENTRIFUGAL FANS - 04

CENTRIFUGAL FANS - 05

CENTRIFUGAL FANS - 06
CENTRIFUGAL FANS 01

CENTRIFUGAL FANS 02

CENTRIFUGAL FANS 03

CENTRIFUGAL FANS 04

CENTRIFUGAL FANS 05

CENTRIFUGAL FANS 06

(PS1-P-3107,3108)

(PS1-P-3107,3108)

SPARE - 01
SPARE - 06

SPARE - 02
E E

REVISION
FOR APPROVAL DESCRIPTION SINGLE LINE DIAGRAM OF LV PANEL FOR (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 02A OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
F
E
B
A

D
C
1

1
SHEET

ON
FROM PREVIOUS

-P1
A.M
-Q

40A
OFF TRIP

FP MCCB
SPARE - 03

60/5A
3XC.Ts
ON

-P1
A.M
-Q

40A
OFF TRIP

FP MCCB
SPARE - 04

60/5A
3XC.Ts
ON

-P1
A.M
-Q

40A
OFF TRIP

FP MCCB

2
2

SPARE - 05

60/5A
3XC.Ts

01
REV.
REVISION

DATE
ON

-P1
A.M
-Q

16A
MOTORIZED BUTTERFLY VALVE-01
OFF TRIP

TP MCCB
VALVES (PS1-BTV-3601 TO 3606)
0.4KW EACH
CUBICAL-05

30/5A
3XC.Ts
0.6/1kV,Cu/PVC/PVC-4C (3P+E)-2.5 mm2
ON

-P1
A.M
-Q

16A

MOTORIZED BUTTERFLY VALVE-01


OFF TRIP

TP MCCB

3
3

VALVES (PS1-BTV-3601 TO 3606)


0.4KW EACH

30/5A
3XC.Ts
0.6/1kV,Cu/PVC/PVC-4C (3P+E)-2.5 mm2
ON

-P1
A.M
-Q

16A

MOTORIZED BUTTERFLY VALVE-03


OFF TRIP

TP MCCB

VALVES (PS1-BTV-3601 TO 3606)

DESCRIPTION OF MODIFICATION
0.4KW EACH
30/5A
3XC.Ts

0.6/1kV,Cu/PVC/PVC-4C (3P+E)-2.5 mm2


ON

-P1
A.M

13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS


-Q

16A
OFF TRIP

TP MCCB

MOTORIZED BUTTERFLY VALVE-04


VALVES (PS1-BTV-3601 TO 3606)
0.4KW EACH
30/5A
3XC.Ts

BY
0.6/1kV,Cu/PVC/PVC-4C (3P+E)-2.5 mm2

M.R
ON

-P1
A.M
-Q

16A

4
4

OFF TRIP

TP MCCB

MOTORIZED BUTTERFLY VALVE-05


VALVES (PS1-BTV-3601 TO 3606)
0.4KW EACH
30/5A
3XC.Ts

AS BUILT
0.6/1kV,Cu/PVC/PVC-4C (3P+E)-2.5 mm2
ON

-P1

FOR APPROVAL
A.M
-Q

16A
OFF TRIP

TP MCCB

MOTORIZED BUTTERFLY VALVE-06


VALVES (PS1-BTV-3601 TO 3606)
0.4KW EACH
30/5A

FOR MANUFACTURING
3XC.Ts

0.6/1kV,Cu/PVC/PVC-4C (3P+E)-2.5 mm2


ON

-P1
A.M
-Q

25A

CHAIN HAULED RAKING BAR


OFF TRIP

FP MCCB

SCREENS (PS1-S-1202,03,04) CONTROL PANEL


4.4KW
OUTGOING BUS SECTION-A

5
30/5A
3XC.Ts

0.6/1kV,Cu/PVC/PVC/SWA/PVC-5C (3P+N+E)-6 mm2


5

CLIENT
CUBICAL-06

ON

PROJECT
-P1
A.M

MO NUMBER
PROJECT NO

DRAWING NO
-Q

25A

DESCRIPTION
PENSTOCK GATES CONTROL PANEL
OFF TRIP

FP MCCB

(PS1-G-1301,1303,1305)
4.4 KW (TOTAL RUNNING LOAD)
30/5A
3XC.Ts

0.6/1 kV-Cu/PVC/PVC/SWA/PVC- 5C (3P+N+E)-6 mm2


ON

MO-N/A
-P1
A.M
-Q

25A

PENSTOCK GATES CONTROL PANEL


OFF TRIP

FP MCCB

(PS1-G-1302,1304,1306)
4.4 KW (TOTAL RUNNING LOAD)
30/5A
3XC.Ts

0.6/1 KV-CU/PVC/PVC/SWA/PVC- 5C (3P+N+E)-6 MM2

SEWD1-586261124
ON

-P1

GTD-586261124-REV02
A.M

SCHNEIDER ELECTRIC
DESCON ENGINEERING
-Q

25A

PUMP STATION - LIGHTING AND SMALL POWER


FP MCCB
OFF TRIP

DISTRIBUTION BOARD - EXTERNAL 2 (DB-EX2-PS1)


3.24KW
30/5A
3XC.Ts

0.6/1 KV-CU/PVC/PVC/SWA/PVC- 5C (3P+N+E)-6 MM2

6
6

ON

-P1
A.M
-Q

25A

PUMP STATION - LIGHTING AND SMALL POWER


OFF TRIP

FP MCCB

DISTRIBUTION BOARD - EXTERNAL 1 (DB-EX1-PS1)


3.96KW
30/5A
3XC.Ts

0.6/1 KV-CU/PVC/PVC/SWA/PVC- 5C (3P+N+E)-6 MM2


ON

-P1
A.M

SINGLE LINE DIAGRAM OF LV PANEL FOR (PS-1)


-Q

25A

COMPRESSOR ROOM-LIGHTING AND SMALL


OFF TRIP

FP MCCB

POWER DISTRIBUTION BOARD (DB-AR-PS1)


2.8KW
30/5A
3XC.Ts

0.6/1 kV-Cu/PVC/PVC/SWA/PVC- 5C (3P+N+E)-10 mm2


ON

-P1
A.M
-Q

20A

MOTORIZED BUTTERFLY VALVE


OFF TRIP

TP MCCB

(PS1-BTV-6601)
5KW
30/5A
3XC.Ts

0.6/1 kV- Cu/PVC/SWA/PVC- 4C (3P+N)-10 mm2


7
7

ON

-P1
A.M

REV NO
-Q

40A
OFF TRIP

FP MCCB

INDUSTRIAL SOCKET
DESIGN BY

10kW
CHECKED BY

0.6/1 kV-Cu/PVC/PVC- 5C (3P+N+E)-10 mm2


60/5A
3XC.Ts

APPROVED BY
ON

RE CHECKED BY
CUBICAL-07

-P1
A.M
-Q

40A
OFF TRIP

FP MCCB

CATHODIC PROTECTION RECTIFIER


00
S.A
N/A
S.M

M.R

10KW
0.6/1 kV- Cu/PVC/SWA/PVC- 4C (3P+N)-16 mm2
60/5A
3XC.Ts

QTY

8
8

SCALE
LV PANELS FOR PS-1

SHEET
TO NEXT

SHEET NO
N.T.S

03 OF 51
DRAWN DATE 16-05-2025

F
E
B
A

D
C
1 2 3 4 5 6 7 8

CUBICAL-08 CUBICAL-09 CUBICAL-10

INCOMING INCOMING
LV PANELS FOR PS-1
FROM FROM T/F - 2
630 kVA
A T/F - 1
630 kVA
Y TRAFO-01 TRAFO-02 Y 11/0.415 A
11/0.415 kV, 50Hz,
-F -F
kV, 50Hz, FP MCCB FP MCCB Z=4%
Z=4% SPD 63A SPD 63A

70KA 70KA

MCB MCB
TP 2A TP 2A

UV/OV UV/OV
SUPPLY FROM SUPPLY FROM
MV SWITCHGEAR MV SWITCHGEAR
-P16 335 -P16
V.M MODULE V.M
MCB MCB
Phase SP 2A Phase SP 2A
Indications Indications
E.M PB MOA

ON OFF TRIP
INTERLOCK ON OFF TRIP

ON OFF L.T ACK ON OFF L.T ACK


PB PB PB PB PB PB PB PB

QM1 QM3
B FP ACB
1000A
M
E M FP ACB
1000A
B
With With
Key Interlock Key Interlock

-P1 -P81 -P1 -P81


3XC.Ts 3XC.Ts
A.M E/A 1000/5A
A.M E/A 1000/5A

OUTGOING BUS SECTION-B


1XC.T 1XC.T
FOR PFI FOR PFI
1000/5A 1000/5A

3XC.T 3XC.T
FOR FOR
1000/5A 1000/5A
MODULE MODULE

CUBICAL-11 CUBICAL-12 CUBICAL-13

M
FROM PREVIOUS
SHEET -QM2
PFI PF
FP ACB RESLAY METER
1000A ON
ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP With ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP
Key Interlock
ON PB -S21 OF PB
BUS COUPLER
ON OFF TRIP A/O/M

C ON OFF -P1
3XC.Ts
C
-Q -Q -Q -Q -Q PB PB -Q -Q -Q -Q -Q -Q -Q -Q -Q -Q -Q -Q A.M 150/5A
FP MCCB FP MCCB FP MCCB FP MCCB FP MCCB FP MCCB FP MCCB FP MCCB FP MCCB FP MCCB FP MCCB FP MCCB FP MCCB FP MCCB FP MCCB FP MCCB FP MCCB
40A 40A 40A 40A 50A 250A 250A 100A 80A 50A 40A 25A 25A 16A 250A 80A 32A
8680
MODULE -Q
TP MCCB
125A
E.M PB MOA

-P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1 -P1
3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts 3XC.Ts
A.M 60/5A
A.M 60/5A
A.M 60/5A
A.M 60/5A
A.M 60/5A
A.M 300/5A
A.M 300/5A
A.M 100/5A
A.M 100/5A
A.M 60/5A
A.M 30/5A
A.M 30/5A
A.M 30/5A
A.M 30/5A
A.M 300/5A
A.M 100/5A
A.M 30/5A
HRC
FUSE
32A

TP
M.C
32A

D D

0.6/1 kV-Cu/PVC/PVC/SWA/PVC- 5C (3P+N+E)-10 mm2


0.6/1 kV-Cu/PVC/PVC/SWA/PVC- 5C (3P+N+E)-4 mm2
PUMP STATION LIGHTING & SMALL POWER DB -
PUMP STATION LIGHTING & SMALL POWER DB

PUMP STATION LIGHTING & SMALL POWER DB

PUMP STATION LIGHTING & SMALL POWER DB

PUMP STATION LIGHTING & SMALL POWER DB


0.6/1 kV- Cu/PVC/SWA/PVC- 4C (3P+N)-185 mm2
( 4 STAGE)
0.6/1 kV- Cu/PVC/SWA/PVC- 4C (3P+N)-35 mm2

0.6/1 kV- Cu/PVC/SWA/PVC- 4C (3P+N)-35 mm2

0.6/1 kV- Cu/PVC/SWA/PVC- 4C (3P+E)-4 mm2


STAGES-1 TO 4(12.5KVAR)

CENTRAL FLOW BAND SCREENS CONTROL


WATER SUPPLY SYSTEM CONTROL PANEL

0.6/1 kV-Cu/PVC/PVC- 5C (3P+N+E)-10 mm2


0.6/1 kV-Cu/PVC/PVC- 5C (3P+N+E)-10 mm2

0.6/1 kV-Cu/PVC/PVC- 5C (3P+N+E)-10 mm2

0.6/1 kV-Cu/PVC/PVC- 5C (3P+N+E)-25 mm2

0.6/1 kV-Cu/PVC/PVC- 5C (3P+N+E)-25 mm2

0.6/1 kV-Cu/PVC/PVC- 5C (3P+N+E)-10 mm2


FIRE FIGHTING SYSTEM CONTROL PANEL

(PS1-S-1205,1206,1207) CONTROL PANEL


PFI 45KVAR

LIFTING ARRANGEMENT (SCREENING)


0.6/1kV,Cu/PVC/PVC-4C (3P+N)-70 mm2
OVERHEAD CRANE CONTROL PANEL
5.5KW 0.6/1 kV- Cu/PVC/SWA/PVC- 4C

AIR COMPRESSOR PACKAGE UNIT-1

AIR COMPRESSOR PACKAGE UNIT-2

ESSENTIAL DISTRIBUTION BOARD


(PS1-C-7810) CONTROL PANEL

(PS1-C-7811) CONTROL PANEL

3.44 KW (total running load)


80KW (total running load)

(DB-BF-PS1)10.1KW
(1F-DB-PS1) 25.2KW

BASEMENT FLOOR
MEZZANINE FLOOR
WELDING SOCKET
(PS1-P-2101, 2102)

METERING ROOM
GROUND FLOOR
(3P+N)-10 mm2

FIRST FLOOR

(DB-MR-PS1)
(DB-MF-PS1)
(DB-GF-PS1)

SPARE - 01

SPARE - 02

SPARE - 03
(PS1-4401)

12.06KW
51.3 KW

24.9KW
18.9KW

4.3 KW

1.5KW
15KW

15KW

10kW

E E

REVISION
FOR APPROVAL DESCRIPTION SINGLE LINE DIAGRAM OF LV PANEL FOR (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 04 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CUBICAL 01

A A
SHEET 06/D2

SHEET 06/D2

SHEET 06/E2

SHEET 06/E2

SHEET 06/E2

SHEET 06/E2
SHEET 06/C2

SHEET 06/C2
44C1

54C1
62C1

72C1

82C1
22C1
14C1

4C1
B B
R2 6/A3
R2 R2 R2
-1S2 -2S2 -3S2 -4S2
OFF OFF OFF OFF
PB PB PB PB

23C1 63C1 73C1 83C1

C -1S1 13 21 -2S1 13 21 -3S1 13 21 -4S1 13 21 C


ON 1K1 1K1 ON 2K1 2K1 ON 3K1 3K1 ON 4K1 4K1
PB PB 22
PB 22
PB
14 22 14 14 14 22

44C1

44C1

64C1

74C1

54C1

54C1

84C1
24C1
14C1

14C1

4C1

4C1
1R42 1R42 1R42
7/C6

D D
12 14 22 24 32 34 42 44 12 14 22 24 32 34 42 44

11 21 31 41 11 21 31 41
45C1

65C1

75C1

55C1

85C1
25C1
15C1

5C1
A1 A1 G R A1 G R A1 A1 G R A1 G R
-R1 -1K1 -1H1 -1H2 -2K1 -2H1 -2H2 -R2 -3K1 -3H1 -3H2 -4K1 -4H1 -4H2
E 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 E
220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC

N1 N1 N1 N1 N1 N1 N1 N1 N1 N1 N1 N1 N1 N1
FROM SHEET
6/E1
LAMP TEST MAGNETIC ON OFF MAGNETIC ON OFF LAMP TEST MAGNETIC ON OFF MAGNETIC ON OFF
RELAY CONTACTOR LIGHT LIGHT CONTACTOR LIGHT LIGHT RELAY CONTACTOR LIGHT LIGHT CONTACTOR LIGHT LIGHT
E

REVISION
FOR APPROVAL DESCRIPTION CONTROL DIAGRAM OF 45KVAR PFI PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 05 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL 01
L1 L1
L2 L2
L3 L3

Y1
R1

B1
A A
-F1 -F2 -F3
SP/MCB SP/MCB SP/MCB
2A 2A 2A CAMSCO
5/B8 R2 POWER FACTOR METER

Y2
R2

B2
Aux Supply Voltage Input Current Input
M 0 A

10
11
4
3

6
7

8
9
1 3 5 7 9 11

-S21 M 2 A4 M6 A 8 M 10 A 12
B B

B12

B13
Y13
R11

R12

Y12
R11 N1 Y12 B12 -1X1/1
S2 S1R21
FROM
S1 2 S2K21 SHEET 26/B2
R11

R12

R12
C C1 C

S2
S1
Y13 B13
N1
22
21

22C1 5/B1

A
D

B
C
14
13

6/E7 NR1 14C1 5/B1


ISKRA
POWER FACTOR CONTROLLER
PFC MAX 06
62
61

62C1 5/B3
D D
44
43

6/E7 NR2 44C1 5/B2

COM

4
2
3

5
6
1
72
71

72C1 5/B4

NR4
NR2
NR3

NR5
NR6
NR1
NR3 4C1
4
3

6/E7 5/B4
82
81

E 82C1 E

SHEET 6/D3
SHEET 6/D3
SHEET 6/D1
SHEET 6/D1
SHEET 6/E1
SHEET 6/E1
5/B6
54
53

5/E7 NR4 54C1 5/B6


R12

TO SHEET N1 -1X2/1 FROM SHEET


5/E8 N1 7/E8

REVISION
FOR APPROVAL DESCRIPTION CONTROL DIAGRAM OF 45KVAR PFI PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 06 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-01 0-150A
L1
L2
L1 DIGITAL A/M -P1
BUILT-IN S.S AL3 L3
L2 AL2 AL1
AUX
S2 S1 S2 S1 S2 S1 -1X1/1 S1R N1
L3

S1
S1R1

P1
1N1
S2R1 2 S2R
A A

S2

P2
3 -T1~T3

S1
S1Y1 S1Y

P1
3xC.Ts
S2Y1 4 S2Y 150/5A

S2

P2
S1B1 5 S1B

S1
P1
-1F1-1F3 -2F1-2F3 -3F1-3F3 -4F1-4F3
32A 32A 32A 32A 6
FUSE FUSE FUSE S2B1 S2B
FUSE

S2

P2
1N1

B -1F1,1F2 B
SP MCB
2A,
1R11 1R1

1R12 1R12 1R1

CUSTOMER
-1K1 -2K1 -3K1 -4K1
-1X2/1

FOR
TP CONTACTOR TP CONTACTOR TP CONTACTOR TP CONTACTOR 31 31
50A 50A 50A 50A -2 -1R1
34 32 -1R2
1R13 34

C 1R16 1R17 1R18 C


L1 L2 L3 01 01 -1X4/1
1R42
5/D8 8/D5
-QMF OF SD
MCCB-TP SHUNT
220VAC 12 14 22 24 32 34
125A, T1 T2 T3
04 02 04 02

11 21 31

1R14 1R15 1R19 1R20 1R21

G R Y -1R3 A1
-1H1 -1H2 -1H3
-1R1 A1 -1R2 A1
220VAC A2
220VAC A2 220VAC A2 220VAC 220VAC 220VAC
D D

1N1
1N1

1N1

1N1

1N1

1N1
1N1
ON OFF TRIP LAMP TEST
11 21 11 LIGHT LIGHT LIGHT RELAY

14 22 14

204
200

202

203

205
201
-1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip


Status Status Status
To PLC TO PLC To PLC

E CR1 CR2 CR3 CR4


E
12.5KVAR@440VAC 12.5KVAR@440VAC 12.5KVAR@440VAC 12.5KVAR@440VAC
1ST STAGE 2ND STAGE 3TH STAGE 4TH STAGE
-1X4/1
6/E8
PFI INCOMING
E

REVISION
FOR APPROVAL DESCRIPTION POWER DIAGRAM OF 45KVAR PFI PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 07 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-02
L1 L1
L2 L2
L3 L3
N 0-30A N
-P1 DIGITAL A/M
BUILT-IN S.S
A AL1 AL2 AL3
AUX
A
S1R -1X1/1
S1 S2 S1 S2 S1 S2

S1
P1 S1R1
1R11 1R11 1R11 1R11 1R11
S2R 2 S2R1
P1 S2
P2

3 97
S1
S1Y S1Y1 95
1F49
-T1~T3 S2Y 4 S2Y1 96
98
P1 S2

3xC.Ts
P2

S1B 5 S1B1 1R12


S1

30/5A
R 0 L
S2B 6 S2B1
B 3 1 7 5 B
S2
P2

R 4 L 2 R 8 L 6
-1S21
-1Q1

104

105

106

107
1R13
TP MPCB
13~18A -1F1 -1X3/5 -6 -7 -8
MCB SP 1
1S2
2A 1X2/1 P.B Remote Local
1R20
Status Status

START & STOP COMAND FROM PLC/LC


1R1 1R11 OFF
2 To PLC To PLC

-2 1R21 1R14
-1K1
TP 25A
C 83 3 13 11
C
1S1 21 1R1
1K1 P.B 1K1 1K1 08/E8
84 ON 14 22 14
-1F49 95 96 97 98 4

-3 1R15
EOCR
5~60A

31 1R17 1R18 1R19


A2 A1
-1F51G
08/E2
32
S1 1T1
D -1X4/2 1R42 -1X4/1 D
1T2 7/C7 9/D5
-1T51G
S2
NOTE:
-1F51G
T1 T2 A1 A2 This Control Drawing will be Applicable
-1X1/1 -2 -3 ELR For 7.5 KW DOL Starter Circuit
Schneider
Fault 1R16 FOR
(1,2,3,4,5 & 6)Wire Number &
W
V
U

RH99M 32 31 34
12 14 22 24 32 34 TRIP LIGHT

Components Marking will be -1R2 A1


1R13 1R12
53 A1 11 21 31
A1 11 21
Changed As per Circuit Number. -1K1
M SHEET
8/D5
1K1 -1R1
54 1R20 1R21 1R22 14 24
3~ A2 A2 A2

1R18
1R11

102

103
100

101

E -1H1 -1H2 -1H3 E


DOL CIRCUIT -1X3/1 -2 -1X3/3 -4
7.5KW Motor ON Motor Trip
N1 N1 N1 N1 N1 TO SHEET
QTY-06 Status N1 N1 08/C6 Status
To PLC To PLC
N
MAGNATIC ON OFF TRIP CONTROL CONTROL
CONTACTOR LIGHT LIGHT LIGHT RELAY RELAY
E

REVISION
FOR APPROVAL DESCRIPTION POWER AND CONTROL DIAGRAM OF 7.5 KW DOL CIRCUIT (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 08 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-03
L1 L1
L2 L2
L3 L3
N 0-30A L4
-P1 DIGITAL A/M
BUILT-IN S.S
A AL1 AL2 AL3
AUX
A
S1R -1X1/1
S1 S2 S1 S2 S1 S2

S1
P1 S1R1
1R11 1R11 1R11 1R11 1R11
S2R 2 S2R1
P1 S2
P2

3 97
S1

S1Y S1Y1 95
1F49
-T1~T3 S2Y 4 S2Y1 96
98
P1 S2

3xC.Ts
P2

S1B 5 S1B1 1R12


S1

30/5A
R 0 L
S2B 6 S2B1
B -1S21 3 1 7 5 B
S2
P2

R 4 L 2 R 8 L 6

-1Q1

104

105

106

107
1R13
TP MPCB
17~23A -1F1 -1X3/5 -6 -7 -8
MCB SP 1
1S2
2A 1X2/1 P.B Remote Local
1R20
Status Status

START & STOP COMAND FROM PLC/LC


1R1 1R11 OFF
2 To PLC To PLC

-2 1R21 1R14
-1K1
TP 25A
C 83 3 13 11
C
1S1 21 1R1
1K1 P.B 1K1 1K1 09/E8
84 ON 14 22 14
-1F49 95 96 97 98 4

-3 1R15
EOCR
5~60A 1R18 1R19
1R17

A2 A1 31
-1F51G
09/E2
32
S1 1T1
D -1X4/2 1R42 -1X4/1 D
1T2 8/D8 10/D3
-1T51G
S2
NOTE:
-1F51G
T1 T2 A1 A2 This Control Drawing will be Applicable
-1X1/1 -2 -3 ELR For 11KW DOL Starter Circuit
Schneider
Fault 1R16 FOR
(1,2,3,4,5,6,7 & 8)Wire Number &
W
V
U

RH99M 32 31 34
12 14 22 24 32 34 TRIP LIGHT

Components Marking will be -1R2 A1


1R13 1R12
53 A1 11 21 31 -1R1 A1 11 21
Changed As per Circuit Number. -1K1
M SHEET
9/B5
1K1
54 1R20 1R21 1R22 14 24
3~ A2 A2 A2

1R18
1R11

102

103
100

101

E -1H1 -1H2 -1H3 E


DOL CIRCUIT -1X3/1 -2 -1X3/3 -4
11KW Motor ON Motor Trip
N1 N1 N1 N1 N1 TO SHEET
QTY-08 Status N1 N1 09/C6 Status
To PLC To PLC
N
MAGNATIC ON OFF TRIP CONTROL CONTROL
CONTACTOR LIGHT LIGHT LIGHT RELAY RELAY
E

REVISION
FOR APPROVAL DESCRIPTION POWER AND CONTROL DIAGRAM OF 11KW DOL CIRCUIT (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 09 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-04
L1 L1
L2 L2
L3 L3
N N
0-150A 0-100A
-P1 -P1
A DIGITAL A/M DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1 S1R -1X1/1
S1

S1
S1R1 S1R1
P1

P1
S2
S2R 2 S2R1 S2R 2 S2R1

S2
P2

P2
3 3
S1

S1
S1Y S1Y1 S1Y S1Y1
P1

P1
S2Y 4 S2Y1 S2Y 4 S2Y1
S2

S2
-T1~T3 -T1~T3
P2

P2
S1B 5 S1B1 S1B 5 S1B1
S1

S1
P1

P1
B 3xC.Ts 3xC.Ts B
150/5A 6 100/5A 6
S2B S2B1 S2B S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 9/D8
1R42
10/D7
1R13 10/D5
1R42
11/D3

N1 L1 L2 L3 01 01 N1 L1 L2 L3 01 01
-Q1 OF SD
12 14 22 24 32 34
-Q2 OF SD
12 14 22 24 32 34

D MCCB-TP SHUNT
220VAC 11 21 31
MCCB-FP SHUNT
220VAC 11 21 31 D
125A, N1 T1 T2 T3
04 02 04 02 100A, N1 T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP ON OFF TRIP
11 21 11 LIGHT LIGHT LIGHT 11 21 11 LIGHT LIGHT LIGHT
E E
N1 L1 L2 L3 14 22 14 N1 L1 L2 L3 14 22 14

OUTGOING OUTGOING

204
200

202

203

205
104
100

102

103

105

201
101

-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Close MCCB Open MCCB Trip
Status Status Status Status Status Status
To PLC TO PLC To PLC To PLC TO PLC To PLC
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 10 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-04
L1 L1
L2 L2
L3 L3
N N
0-60A 0-60A
-P1 -P1
A DIGITAL A/M DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1 S1R -1X1/1
S1

S1
S1R1 S1R1
P1

P1
S2
S2R 2 S2R1 S2R 2 S2R1

S2
P2

P2
3 3
S1

S1
S1Y S1Y1 S1Y S1Y1
P1

P1
S2Y 4 S2Y1 S2Y 4 S2Y1
S2

S2
-T1~T3 -T1~T3
P2

P2
S1B 5 S1B1 S1B 5 S1B1
S1

S1
P1

P1
B 3xC.Ts 3xC.Ts B
60/5A 6 60/5A 6
S2B S2B1 S2B S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 10/D8
1R42
11/D7
1R13 11/D5
1R42
12/D3

N1 L1 L2 L3 01 01 N1 L1 L2 L3 01 01
-Q3 OF SD
12 14 22 24 32 34
-Q4 OF SD
12 14 22 24 32 34

D MCCB-FP SHUNT
220VAC 11 21 31
MCCB-FP SHUNT
220VAC 11 21 31 D
40A, N1 T1 T2 T3
04 02 04 02 40A, N1 T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP ON OFF TRIP
11 21 11 LIGHT LIGHT LIGHT 11 21 11 LIGHT LIGHT LIGHT
E E
N1 L1 L2 L3 14 22 14 N1 L1 L2 L3 14 22 14

OUTGOING OUTGOING

404
400

402

403

405
304
300

302

303

305

401
301

-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Close MCCB Open MCCB Trip
Status Status Status Status Status Status
To PLC TO PLC To PLC To PLC TO PLC To PLC
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 11 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-04
L1 L1
L2 L2
L3 L3
N N
0-60A 0-30A
-P1 -P1
A DIGITAL A/M DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1 S1R -1X1/1
S1

S1
S1R1 S1R1
P1

P1
S2
S2R 2 S2R1 S2R 2 S2R1

S2
P2

P2
3 3
S1

S1
S1Y S1Y1 S1Y S1Y1
P1

P1
S2Y 4 S2Y1 S2Y 4 S2Y1
S2

S2
-T1~T3 -T1~T3
P2

P2
S1B 5 S1B1 S1B 5 S1B1
S1

S1
P1

P1
B 3xC.Ts 3xC.Ts B
60/5A 6 30/5A 6
S2B S2B1 S2B S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 11/D8
1R42
12/D7
1R13 12/D5
1R42
13/D3

N1 L1 L2 L3 01 01 N1 L1 L2 L3 01 01
-Q5 OF SD
12 14 22 24 32 34
-Q6 OF SD
12 14 22 24 32 34

D MCCB-FP SHUNT
220VAC 11 21 31
MCCB-FP SHUNT
220VAC 11 21 31 D
40A, N1 T1 T2 T3
04 02 04 02 12A, N1 T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP ON OFF TRIP
11 21 11 LIGHT LIGHT LIGHT 11 21 11 LIGHT LIGHT LIGHT
E E
N1 L1 L2 L3 14 22 14 N1 L1 L2 L3 14 22 14

OUTGOING OUTGOING
504

604
500

502

503

505

600

602

603

605
501

601
-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Close MCCB Open MCCB Trip
Status Status Status Status Status Status
To PLC TO PLC To PLC To PLC TO PLC To PLC
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 12 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-05
L1 L1
L2 L2
L3 L3
N N
0-30A 0-30A
-P1 -P1
A DIGITAL A/M DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1 S1R -1X1/1
S1

S1
S1R1 S1R1
P1

P1
S2
S2R 2 S2R1 S2R 2 S2R1

S2
P2

P2
3 3
S1

S1
S1Y S1Y1 S1Y S1Y1
P1

P1
-T1~T3 -T1~T3
3xC.Ts S2Y 4 S2Y1 3xC.Ts S2Y 4 S2Y1
S2

S2
30/5A 30/5A
P2

P2
S1B 5 S1B1 S1B 5 S1B1
S1

S1
P1

P1
B B
S2B 6 S2B1 S2B 6 S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 12/D8
1R42
13/D7
1R13 13/D5
1R42
14/D3

L1 L2 L3 01 01 L1 L2 L3 01 01
-Q1 OF SD
12 14 22 24 32 34
-Q2 OF SD
12 14 22 24 32 34

D MCCB-TP SHUNT
220VAC 11 21 31
MCCB-TP SHUNT
220VAC 11 21 31 D
16A, T1 T2 T3
04 02 04 02 16A, T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP ON OFF TRIP
11 21 11 LIGHT LIGHT LIGHT 11 21 11 LIGHT LIGHT LIGHT
E E
N1 L1 L2 L3 14 22 14 N1 L1 L2 L3 14 22 14

OUTGOING OUTGOING

204
200

202

203

205
104
100

102

103

105

201
101

-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Close MCCB Open MCCB Trip
Status Status Status Status Status Status
To PLC TO PLC To PLC To PLC TO PLC To PLC
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 13 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-05
L1 L1
L2 L2
L3 L3
N N
0-30A 0-30A
-P1 -P1
A DIGITAL A/M DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1 S1R -1X1/1
S1

S1
S1R1 S1R1
P1

P1
S2
S2R 2 S2R1 S2R 2 S2R1

S2
P2

P2
3 3
S1

S1
S1Y S1Y1 S1Y S1Y1
P1

P1
-T1~T3 -T1~T3
3xC.Ts S2Y 4 S2Y1 3xC.Ts S2Y 4 S2Y1
S2

S2
30/5A 30/5A
P2

P2
S1B 5 S1B1 S1B 5 S1B1
S1

S1
P1

P1
B B
S2B 6 S2B1 S2B 6 S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 13/D8
1R42
14/D7
1R13 14/D5 1R42
15/D3

L1 L2 L3 01 01 L1 L2 L3 01 01
-Q3 OF SD
12 14 22 24 32 34
-Q4 OF SD
12 14 22 24 32 34

D MCCB-TP SHUNT
220VAC 11 21 31
MCCB-TP SHUNT
220VAC 11 21 31 D
16A, T1 T2 T3
04 02 04 02 16A, T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP ON OFF TRIP
11 21 11 LIGHT LIGHT LIGHT 11 21 11 LIGHT LIGHT LIGHT
E E
N1 L1 L2 L3 14 22 14 N1 L1 L2 L3 14 22 14

OUTGOING OUTGOING

404
304

400

402

403

405
300

302

303

305

401
301

-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Close MCCB Open MCCB Trip
Status Status Status Status Status Status
To PLC TO PLC To PLC To PLC TO PLC To PLC
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 14 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-05
L1 L1
L2 L2
L3 L3
N N
0-30A 0-30A
-P1 -P1
A DIGITAL A/M DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1
S1

S1
S1R1
P1

P1
S2
S2R 2 S2R1

S2
P2

P2
3
S1

S1
S1Y S1Y1
P1

P1
-T1~T3 -T1~T3
3xC.Ts 3xC.Ts S2Y 4 S2Y1
S2

S2
30/5A 30/5A
P2

P2
S1B 5 S1B1
S1

S1
P1

P1
B B
S2B 6 S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 14/D8 1R42


15/D7
1R13 15/D5 1R42
16/D3

L1 L2 L3 01 01 L1 L2 L3 01 01
-Q5 OF SD
12 14 22 24 32 34
-Q6 OF SD
12 14 22 24 32 34

D MCCB-TP SHUNT
220VAC 11 21 31
MCCB-TP SHUNT
220VAC 11 21 31 D
16A, T1 T2 T3
04 02 04 02 16A, T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP ON OFF TRIP
11 21 11 LIGHT LIGHT LIGHT 11 21 11 LIGHT LIGHT LIGHT
E E
N1 L1 L2 L3 14 22 14 N1 L1 L2 L3 14 22 14

OUTGOING OUTGOING
504

604
500

502

503

505

600

602

603

605
501

601
-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Close MCCB Open MCCB Trip
Status Status Status Status Status Status
To PLC TO PLC To PLC To PLC TO PLC To PLC
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 15 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-06
L1 L1
L2 L2
L3 L3
N N
0-30A 0-30A
-P1 -P1
A DIGITAL A/M DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1 S1R -1X1/1
S1

S1
S1R1 S1R1
P1

P1
S2
S2R 2 S2R1 S2R 2 S2R1

S2
P2

P2
3 3
S1

S1
S1Y S1Y1 S1Y S1Y1
P1

P1
S2Y 4 S2Y1 S2Y 4 S2Y1
S2

S2
-T1~T3 -T1~T3
P2

P2
S1B 5 S1B1 S1B 5 S1B1
S1

S1
P1

P1
B 3xC.Ts 3xC.Ts B
30/5A 6 30/5A 6
S2B S2B1 S2B S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 15/D8 1R42


16/D7
1R13 16/D5 1R42
17/D3

L1 L2 L3 01 01 N1 L1 L2 L3 01 01
-Q1 OF SD
12 14 22 24 32 34
-Q2 OF SD
12 14 22 24 32 34

D MCCB-FP SHUNT
220VAC 11 21 31
MCCB-FP SHUNT
220VAC 11 21 31 D
25A, T1 T2 T3
04 02 04 02 25A, N1 T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP ON OFF TRIP
11 21 11 LIGHT LIGHT LIGHT 11 21 11 LIGHT LIGHT LIGHT
E E
N1 L1 L2 L3 14 22 14 N1 L1 L2 L3 14 22 14

OUTGOING OUTGOING

204
200

202

203

205
104
100

102

103

105

201
101

-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Close MCCB Open MCCB Trip
Status Status Status Status Status Status
To PLC TO PLC To PLC To PLC TO PLC To PLC
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 16 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-06
L1 L1
L2 L2
L3 L3
N N
0-30A 0-30A
-P1 -P1
A DIGITAL A/M DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1 S1R -1X1/1
S1

S1
S1R1 S1R1
P1

P1
S2
S2R 2 S2R1 S2R 2 S2R1

S2
P2

P2
3 3
S1

S1
S1Y S1Y1 S1Y S1Y1
P1

P1
S2Y 4 S2Y1 S2Y 4 S2Y1
S2

S2
-T1~T3 -T1~T3
P2

P2
S1B 5 S1B1 S1B 5 S1B1
S1

S1
P1

P1
B 3xC.Ts 3xC.Ts B
30/5A 6 30/5A 6
S2B S2B1 S2B S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 16/D8 1R42


17/D7
1R13 17/D5 1R42
18/D3

N1 L1 L2 L3 01 01 N1 L1 L2 L3 01 01
-Q3 OF SD
12 14 22 24 32 34
-Q4 OF SD
12 14 22 24 32 34

D MCCB-FP SHUNT
220VAC 11 21 31
MCCB-FP SHUNT
220VAC 11 21 31 D
25A, N1 T1 T2 T3
04 02 04 02 25A, N1 T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP ON OFF TRIP
11 21 11 LIGHT LIGHT LIGHT 11 21 11 LIGHT LIGHT LIGHT
E E
N1 L1 L2 L3 14 22 14 N1 L1 L2 L3 14 22 14

OUTGOING OUTGOING

404
400

402

403

405
304
300

302

303

305

401
301

-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Close MCCB Open MCCB Trip
Status Status Status Status Status Status
To PLC TO PLC To PLC To PLC TO PLC To PLC
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 17 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-06
L1 L1
L2 L2
L3 L3
N N
0-30A 0-30A
-P1 -P1
A DIGITAL A/M DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1 S1R -1X1/1
S1

S1
S1R1 S1R1
P1

P1
S2
S2R 2 S2R1 S2R 2 S2R1

S2
P2

P2
3 3
S1

S1
S1Y S1Y1 S1Y S1Y1
P1

P1
S2Y 4 S2Y1 S2Y 4 S2Y1
S2

S2
-T1~T3 -T1~T3
P2

P2
S1B 5 S1B1 S1B 5 S1B1
S1

S1
P1

P1
B 3xC.Ts 3xC.Ts B
30/5A 6 30/5A 6
S2B S2B1 S2B S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 17/D8 1R42


18/D7
1R13 18/D5 1R42 20/D3

N1 L1 L2 L3 01 01 N1 L1 L2 L3 01 01
-Q5 OF SD
12 14 22 24 32 34
-Q6 OF SD
12 14 22 24 32 34

D MCCB-FP SHUNT
220VAC 11 21 31
MCCB-FP SHUNT
220VAC 11 21 31 D
25A, N1 T1 T2 T3
04 02 04 02 25A, N1 T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP ON OFF TRIP
11 21 11 LIGHT LIGHT LIGHT 11 21 11 LIGHT LIGHT LIGHT
E E
N1 L1 L2 L3 14 22 14 N1 L1 L2 L3 14 22 14

OUTGOING OUTGOING
504

604
500

502

503

505

600

602

603

605
501

601
-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Close MCCB Open MCCB Trip
Status Status Status Status Status Status
To PLC TO PLC To PLC To PLC TO PLC To PLC
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 18 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-06
L1 L1
L2 L2
L3 L3
N N
0-30A
-P1
A DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S
AUX
S1 S2 S1 S2 S1 S2
S1R -1X1/1
S1
S1R1
P1

S2
S2R 2 S2R1
P2

3
S1
S1Y S1Y1
P1

-T1~T3
3xC.Ts S2Y 4 S2Y1
S2

30/5A
P2

S1B 5 S1B1
S1
P1

B B
S2B 6 S2B1
S2
P2

-1F1,1F2
SP MCB
2A,
1R1 1R11

1R1 1R12 1R12

C 1N1 C
31 31
1R12 -1R1
34 32 -1R2
34
CUSTOMER

-1X2/1
FOR

-2 1R16 1R17 1R18

1R13 1R42 -1X3/1


19/D8 20/D3

L1 L2 L3 01 01
-Q7 OF SD
12 14 22 24 32 34

D MCCB-TP SHUNT
220VAC 11 21 31 D
20A, T1 T2 T3
04 02 04 02
1R19 1R20 1R21

1R14 1R15 G R Y
-1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2
1N1
1N1

1N1

1N1

1N1

1N1

1N1

ON OFF TRIP
11 21 11 LIGHT LIGHT LIGHT
E E
N1 L1 L2 L3 14 22 14

OUTGOING
704
700

702

703

705
701

-1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip


Status Status Status
To PLC TO PLC To PLC
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANE (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 19 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-07
L1 L1
L2 L2
L3 L3
N N
0-60A 0-60A
-P1 -P1
A DIGITAL A/M DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1 S1R -1X1/1
S1

S1
S1R1 S1R1
P1

P1
S2
S2R 2 S2R1 S2R 2 S2R1

S2
P2

P2
3 3
S1

S1
S1Y S1Y1 S1Y S1Y1
P1

P1
S2Y 4 S2Y1 S2Y 4 S2Y1
S2

S2
-T1~T3 -T1~T3
P2

P2
S1B 5 S1B1 S1B 5 S1B1
S1

S1
P1

P1
B 3xC.Ts 3xC.Ts B
60/5A 6 60/5A 6
S2B S2B1 S2B S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 19/D8 1R42


20/D7 1R13 20/D3 1R42
21/D3

N1 L1 L2 L3 01 01 N1 L1 L2 L3 01 01
-Q1 OF SD
12 14 22 24 32 34
-Q2 OF SD
12 14 22 24 32 34

D MCCB-FP SHUNT
220VAC 11 21 31
MCCB-FP SHUNT
220VAC 11 21 31 D
50A, N1 T1 T2 T3
04 02 04 02 40A, N1 T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP ON OFF TRIP
11 21 11 LIGHT LIGHT LIGHT 11 21 11 LIGHT LIGHT LIGHT
E E
N1 L1 L2 L3 14 22 14 N1 L1 L2 L3 14 22 14

OUTGOING OUTGOING

204
200

202

203

205
104
100

102

103

201
105
101

-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Close MCCB Open MCCB Trip
Status Status Status Status Status Status
To PLC TO PLC To PLC To PLC TO PLC To PLC
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 20 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-07
L1 L1
L2 L2
L3 L3
N N
0-60A 0-60A
-P1 -P1
A DIGITAL A/M DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1 S1R -1X1/1
S1

S1
S1R1 S1R1
P1

P1
S2
S2R 2 S2R1 S2R 2 S2R1

S2
P2

P2
3 3
S1

S1
S1Y S1Y1 S1Y S1Y1
P1

P1
S2Y 4 S2Y1 S2Y 4 S2Y1
S2

S2
-T1~T3 -T1~T3
P2

P2
S1B 5 S1B1 S1B 5 S1B1
S1

S1
P1

P1
B 3xC.Ts 3xC.Ts B
60/5A 6 60/5A 6
S2B S2B1 S2B S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 20/D8
1R42
21/D7
1R13 21/D5 1R42
22/D3

N1 L1 L2 L3 01 01 N1 L1 L2 L3 01 01
-Q3 OF SD
12 14 22 24 32 34
-Q4 OF SD
12 14 22 24 32 34

D MCCB-FP SHUNT
220VAC 11 21 31
MCCB-FP SHUNT
220VAC 11 21 31 D
40A, N1 T1 T2 T3
04 02 04 02 40A, N1 T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP ON OFF TRIP
11 21 11 LIGHT LIGHT LIGHT 11 21 11 LIGHT LIGHT LIGHT
E E
N1 L1 L2 L3 14 22 14 N1 L1 L2 L3 14 22 14

OUTGOING OUTGOING

404
400

402

403
304

405
300

302

303

305

401
301

-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Close MCCB Open MCCB Trip
Status Status Status Status Status Status
To PLC TO PLC To PLC To PLC TO PLC To PLC
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 21 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-07
L1 L1
L2 L2
L3 L3
N N
0-60A 0-60A
A -P1 DIGITAL A/M -P1 DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1 S1R -1X1/1
S1

S1
P1 S1R1 S1R1

P1
S2R 2 S2R1 S2R 2 S2R1
S2

S2
P2

P2
3 3
S1

S1
S1Y S1Y1 S1Y S1Y1
P1

P1
S2Y 4 S2Y1 S2Y 4 S2Y1
-T1~T3 -T1~T3
S2

S2
P2

P2
S1B 5 S1B1 S1B 5 S1B1
S1

S1
P1

P1
B 3xC.Ts 3xC.Ts B
60/5A 60/5A
S2B 6 S2B1 S2B 6 S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 21/D8
1R42 22/D7 1R13 22/D4 1R42
23/D3

L1 L2 L3 01 01 L1 L2 L3 01 01
-Q5 OF SD
12 14 22 24 32 34
-Q6 OF SD
12 14 22 24 32 34

D MCCB-TP SHUNT
220VAC 11 21 31
MCCB-TP SHUNT
220VAC 11 21 31 D
40A, T1 T2 T3
04 02 04 02 40A, T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP ON OFF TRIP
11 21 11 LIGHT LIGHT LIGHT 11 21 11 LIGHT LIGHT LIGHT
E E
N1 L1 L2 L3 14 22 14 N1 L1 L2 L3 14 22 14

OUTGOING OUTGOING
504

604
500

502

503

505

600

602

603

605
501

601
-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Close MCCB Open MCCB Trip
Status Status Status Status Status Status
To PLC TO PLC To PLC To PLC TO PLC To PLC
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 22 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-07
L1 L1
L2 L2
L3 L3
N N
0-60A
A -P1 DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S
AUX
S1 S2 S1 S2 S1 S2
S1R -1X1/1
S1
P1 S1R1

S2R 2 S2R1
S2
P2

3
S1
S1Y S1Y1
P1

S2Y 4 S2Y1
-T1~T3
S2
P2

S1B 5 S1B1
S1
P1

B 3xC.Ts B
60/5A
S2B 6 S2B1
S2
P2

-1F1,1F2
SP MCB
2A,
1R1 1R11

1R1 1R12 1R12

C 1N1 C
31 31
1R12 -1R1
34 32 -1R2
34
CUSTOMER

-1X2/1
FOR

-2 1R16 1R17 1R18

1R13 1R42 -1X3/1


22/D8 27/D7

L1 L2 L3 01 01
-Q7 OF SD
12 14 22 24 32 34

D MCCB-TP SHUNT
220VAC 11 21 31 D
40A, T1 T2 T3
04 02 04 02
1R19 1R20 1R21

1R14 1R15 G R Y
-1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2
1N1
1N1

1N1

1N1

1N1

1N1

1N1

ON OFF TRIP LAMP TEST


11 21 11 LIGHT LIGHT LIGHT RELAY
E E
N1 L1 L2 L3 14 22 14

OUTGOING
704
700

702

703

705
701

-1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip


Status Status Status
To PLC TO PLC To PLC
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 23 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CUBICAL-08
L1 L1
L2 L2
L3 L3
N1 N
1R3
A -6F1
A
-1X2/1 -2 -3 SP FUSE
10A

A+
B-

G
2R3 N1
-P81
Klemson A B G
Energy Analyzer BATTERY
Klea-220P RS485 CHARGER
0-1000A
220VAC/24VDC
S2 -1X1/5
P2

Measuring Current Power -P1 DIGITAL A/M


Measuring Voltage Supply 102
S2

AL1 AL2 AL3 BUILT-IN S.S


-T4 TO P.F.I L1 L2 L3 Un AUX OVDC
SHEET 6/B8 K1 I1 K2 I2 K3 I3 L1 L2 L3 N L N
S1 S2 S1 S2 S1 S2 -ve
1000/5A
S1

S1 -6
P1

3R3 4R3
B S1R -1X1/1 S1R1 S1R11
11 +ve
-6F2
B
SP FUSE
S1Y -2 S1Y1 S1Y11 -R3 10A +ve -ve

14 3R3 OVDC BATTERY


S1B S1B1 S1B11 12VDC
-3 15
P2

P2

P2

-6F3
-T1~T3
S2

S2

S2

SP FUSE
3xC.Ts -T1 10A
1R11 101
S1

S1

S1

1000/5A S1K -4 16 +ve -ve


P1

P1

P1

5R3
BATTERY
11 12VDC
0-500V

1R12A
-P16 DIGITAL V/M

1R12
1 2 3 4
A1 2 BUILT-IN S.S
-QM1 N1 L1 L2 L3
14 12 AUX -X1
L1 L2 L3 N
ACB FP -R1 -T1 24VDC
1000A N1 T1 T2 T3 -1F1~1F6
220VAC
A2 220VAC FOR CONTROL
7

1Y11
W.LSIG

+ve
+ve
1R11

-ve
-ve
C SP MCB C
2A TO SHEET
27/A1
1R1 1R11

0VDC
0VDC
1P10
1P10
1Y1 1Y11

SHEET 33/C1
1B1 1B11

1R1 1R12 TO
1N1 SHEET 27/A1
1N1

1N1

1N1

1N1

1N1

SHEET 30/C1
1R1 1R31 TO
SHEET 25/A6,C7 1R11 -1X3/1
1N1 1R31
D TO 1Y11 -2
26/D3 1R42 27/D3
D
1R1 1R41
SHEET 27/A7 1B11 -3 TO SHEET 33/E5
-1F5
1N1 -4 12 14 22 24 32 34
TP MCB 21
2A
1R1 1R21 -R3 11 21 31
24
1Y1 1Y21

B
Y
1R32 A1
1B1 1B21 -R4
HR HY HB 220VAC A2
-1F6 15 21
MCB FP L1 L2 L3 -1F27 13 11
UV/OV
63A 1F27/47/59 U/V & O/V SHEET ACK R2
RELAY.
26/E3
-R2 P.B
N 18 15 16 18 22 14 14 LAMP TEST
PHASE INDICATIONS RELAY
E 1R33
E
SHEET 1R22 1R34
26/E3
A1 HOOTER A1
-R3 -R2
220VAC 220VAC 220VAC
A2 A2
1N1

1N1
N N L3 L3 L2 L2 L1 L1
N1 L1 L2 L3

1N1
SPD 4P 70KA 26/D3
INCOMING PE

CONTROL HOOTER CONTROL


TRAFO-01 RELAY RELAY
E

REVISION
DESCRIPTION POWER & CONTROL DIAGRAM OF INCOMING TRAFO-01PANEL DESIGN BY S.M DRAWN DATE 16-05-2025
FOR APPROVAL
DESCRIPTION OF MODIFICATION (PS-1)
REV. DATE BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 26 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL 08

SHEET
26/D3

1R12

1R12

1R12

1R12

1R12

1R12

1R12
15

1R14
-T1
A 26/C6
-1X5/5
A
16
1R13

-3X5/6

2-REMOTE

3R27

26/D3
1-LOCAL
0-OFF

SHEET 27/E8
-1X4/1 -1X4/3 11 9

-3S21 R 12 L 10 -1X7/1

32

3R28
3R29
-2X2/1 -3X5/1
-X6/1
2K1/21

3K1/21

LOADING RELAY
-3X5/8 -3X5/7

SHEET 33/E7
OUTPUT B
11 32
-1R1 1R41
SHEET 29/E6

SHEET 32/E6

-1X5/6 -1X5/7
21 21 27/E5

1R18

1R15
14 33
FROM

FROM

-2K1 -3K1
B -QM2
22
-QM3
22 -2
B
2K1/22

3K1/22

33
-1X7/2

-2X2/2 -3X5/2
Comand From PLC

Comand From PLC


ACB Close
ACB Open

SHEET 27/E8
-1X6/7 -1X6/9
-1S2 11 -1S1 -1S3
-1X4/2 -1X4/4 -1R2
OFF ON LAMP
PB PB TEST
-1X6/8 12 14 -1X6/10
1R14

C C
1R19

1R16
1R20 1R17

-QM1
D1 C1 31 A1 21 B1 11 81 41

-1X7/1 -1X7/1

OF4
220VAC 220VAC OF3 220VAC OF2 220VAC OF1 SDE1
M.N MX1 XF MCH 1R42

23/D5

29/D3
D D2 C2 34 32 A2 24 22 B2 14 12 84 82 44 42 D
1R25
1R21 1R22 1R23
26/D8 1R42
1R26
12 14 22 24 11 1R24 3 21 31 32 34
11

-1R3 11
-1R3 21 A1
14
A1
4 22 32 -1R3 31 A1 A1 12 14

1K1/4
1K1/3

1K1/22

1K1/32
1K1/21

1K1/31
-1R1 -1K1 -1R3 -1R2

1R25
1R12
G R 220VAC A2 220VAC A2 Y 220VAC A2 220VAC A2
-1H3

1R19

1R16
1R18
-1X5/1 -2 -3 -4
-1H1 -1H2
Trip Light FEED BACK -QM2 -QM3
220VAC 220VAC TO SHEET SHEET 33/E2 TO SHEET TO SHEET 220VAC
ON /OFF COMMAND

1N1

1N1

1N1

1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

27/B7 29/B1 32/B1


SHEET 27/C2,3
SHEET
26/D3 UNDER VOLTAGE SHUNT CLOSING MOTOR ON TRIP CAD32 TRIP LAMP TEST CONTROL
E RELEASE TRIP COIL LIGHT OFF LIGHT LIGHT RELAY RELAY E
LIGHT
31 13 61

34 14 62

104

103
105

100

102
101
-1X6/5 -6 -1X6/1 -2 -3 -4

QM1 Trip QM1 Close QM1 Open


Status Status Status
To PLC To PLC TO PLC

REVISION
FOR APPROVAL DESCRIPTION CONTROL DIAGRAM OF INCOMING TRAFO-01 PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 27 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL -09
L1 L1
L2 L2
L3 L3
N1 N1
A A

-1F1~1F3 -2F1~2F4
SP MCB SP MCB
2A 2A
1R11 1R1 2R1 2R11

1Y11 1Y1 2Y1 2Y11


TO SHEET 30/E4 TO SHEET 30/E4
1B11 1B1 2B1 2B11

B 1N1 2N1 B
-1F4
SP MCB SHEET
2A, 25/E7

1R2 1R10 11 14

1N1 21 24

2R12
N1 L1 L2 L3 TO SHEET
C -QM2 2N1 29/A1,E1 C
ACB FP
1000A N1 T1 T2 T3

-2F4
SP MCB SHEET
2A, 25/E6

2R2 2R20 11 14

1N2 21 24

D D
11 A1 A1 11
R1 R2
14 A2 A2 14

2K1/4

2K1/4
2K1/3

2K1/3
SHEET SHEET
25/D7 25/B7,C7

E E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF BUS COUPLER PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 28 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL 09

SHEET
28/C8

2R12

2R12

2R12

2R12

2R12

2R12

2R12
2R13
A A

2-REMOTE
1-LOCAL
0-OFF
3 1 11 7 5

-2S21 R 4 L 2 R 12 R8 L 6
-2X1/1 -2X1/3

206

207
208

209
-2X4/1

2R14
2R17
-2X3/7 -8 -9 -10
-1X5/1 -3X5/3
-X6/1
Sheet Remote Local
3K1/31
1K1/21

30/C1

SHEET 30/A3
Status Status

OUTPUT D
CLOSE BUS
11 41
To PLC To PLC
-2R1
SHEET 27/E6

SHEET 32/E6

21 31
14 29/E5 42
-1K1 -3K1
FROM

FROM

B -QM1
22
-QM3
32 B
-2
3K1/32
1K1/22

Comand From PLC

Comand From PLC


ACB Close
-2X4/2
ACB Open

SHEET 29/E8
-2X6/3 -2X6/1
-1X5/2 -2S2 11
-3X5/4 -2S1
OFF -2R2 ON
PB PB
-2X6/4 12 14 -2X6/2
-2X1/2 -2X1/4
2R18

2R15
2R13

C C
2R19 2R16

-QM2
D1 C1 31 A1 21 B1 11 81 41

OF4
220VAC 220VAC OF3 220VAC OF2 220VAC OF1 SDE1
M.N MX1 XF MCH

2R24
D D2 C2 34 32 A2 24 22 B2 14 12 84 82 44 42 D
2R20 2R21 2R22
27/D8

12 14 22 24 11 2R23 3 21 31 32 34 2R25
11

-2R3 -2R3 14 4 22 32 -2R3


11 21 A1 A1 31 A1 A1 12 14

2K1/22

2K1/32
2K1/21

2K1/31
2R20A 2R21A 2R24A
-2R1 -2K1 -2R3 -2R2

2K1/4
2K1/3
2R24
2R12
G R 220VAC A2 220VAC A2 Y 220VAC A2 220VAC A2
-2H3

2R18

2R15
1R17
-2X2/1 -2 -3 -4
-2H1 -2H2
Trip Light FEED BACK -QM1 -QM3
220VAC 220VAC TO SHEET SHEET 30/E2 TO SHEET TO SHEET 220VAC
27/B1 32/B1

2N1

2N1

2N1

2N1
2N1

2N1

2N1

2N1

2N1

2N1

ON /OFF COMMAND

1N1
29/B7
SHEET 29/B2,B3
SHEET
25/C8 UNDER VOLTAGE SHUNT CLOSING MOTOR ON OFF TRIP CAD32 TRIP LAMP TEST CONTROL
E RELEASE TRIP COIL LIGHT LIGHT LIGHT LIGHT RELAY RELAY E
31 13 61

34 14 62

204

205

200

202

203
201
-2X3/5 -6 -2X3/1 -2 -3 -4

QM2 Trip QM2 Close QM2 Open


Status Status Status
To PLC To PLC TO PLC

REVISION
FOR APPROVAL DESCRIPTION CONTROL DIAGRAM OF BUS COUPLER PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 29 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL 09

30/D5 30/D4 29/B8 30/D4 27/D5

2R25
44

2R12
43

45
46

47
48
49
27
25
26

50

33

32
31
A A
27 25 26 43 44 45 46 41 42 39 40 28 29 30 47 48 49 50 33 31 32
SCR H L U V W N + - SCR R S T N SCR H L
MSC BUS 1 L1 L2 L3 CLOSE OUTPUT L1 L2 L3 MSC BUS 2
DSENET
BUS 1 VOLTS BUS C BUS 2 VOLTS
RS232 RS485 OUTPUT
D
A
B
PROGRAMMING
SCR PORT

OUTPUT C OUTPUT D 6 DC OUTPUTS


BATTERY PLANT +VE
12 DIGITAL INPUTS
+VE

-VE
B B
2 1
OVDC 48 49 51 51 52 53 60 61 62 63 64 65 66 67 68 69 70 8 9 10 11 12 13 7

E
1P11

60

62
63

08
09
61
R2 24VDC
-2S21
SHEET 16/B3 R1
1P10 1P11 30/D2
11 12 24VDC
SHEET A
26/C7,C8 OVDC
11 14 11 14
C C

R2/14
R2/11
R1/14
R1/11
30/D3
30/C4,C5

30/A3

30/A5

30/A2

30/A6
30/C3

R2/12
R1/12
R2/11
R1/11

D
44

D
0VDC

43

45
46

47
48
49
50

25
26
27

32
33
60

62

63

31
61

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4 5 6
2Y11 7 8 1 2 3 4 5 6
2R11

2B11
1Y11
2K1/4

1R11

1B11
2K1/3

OVDC

2N1
1N1
162

USER CONFIGURABLE -VE INPUT C

MSC BUS 2
MSC BUS 1
USER CONFIGURABLE +VE OUTPUT E

S1
E/M
26/B6
26/B2

P/B
29/E6

E E

-X1 -X2 -X3


INPUTS OUTPUTS VOLTAGES WIRES

REVISION
FOR APPROVAL DESCRIPTION CONTROL DIAGRAM OF 8680 MODULE (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 30 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CUBICAL-10
L1 L1
L2 L2
L3 L3
N1 N
K1
A A
P2

P2

P2

P2
T1~T4

S2

S2

S2

S2
-3X2/1 -2 -3
4xC.Ts
S1

S1

S1

S1

A+
B-

G
T1
P1

P1

P1

P1
1000/5A TO SHEET 33/E6
T2
-P81
T3 Klemson A B G
T4 Energy Analyzer
Klea-220P RS485
-3X1-5 0-1000A
S2
P2

Measuring Current Power -P1 DIGITAL A/M


S2

-3T4 TO P.F.I Measuring Voltage Supply BUILT-IN S.S


302
L1 L2 L3 Un AL1 AL2 AL3
1000/5A SHEET 41/B8 AUX
S1

S1 -6 K1 I1 K2 I2 K3 I3 L1 L2 L3 N L N
S1 S2 S1 S2 S1 S2
P1

B S1R -3X1/1 S1R1 S1R11


11 B
S1Y -2 S1Y1 S1Y11 -R3
14
S1B -3 S1B1 S1B11 15
P2

P2

P2

-3T1~3T3
S2

S2

S2

3xC.Ts -3T1
3R11 301
S1

S1

S1

1000/5A S1K -4
16
P1

P1

P1

11
0-500V
-P16

3R13

3R12
DIGITAL V/M
A1 2 BUILT-IN S.S
-QM3 N1 L1 L2 L3
14 12 AUX
L1 L2 L3 N
ACB FP -R1 -3T1
1000A N1 T1 T2 T3 -3F1~3F4
220VAC
A2 220VAC
7

3Y11
3R11
C W.LSIG SP MCB C
2A TO SHEET
32/A1
3R1 3R11

3Y1 3Y11

3B1 3B11
TO
3R1 3R12
SHEET 32/A1
3N1

3N1

3N1

3N1

3N1
3R1 3R31
SHEET 31/D5 31/D3
3R11
D 3R1 3R41 3Y11 3R42 27/D3
D
SHEET 32/A7
3B11 TO SHEET 33/E4 3R31
-3F5
TP MCB 3N1 21
12 14 22 24 32 34
2A
3R1 3R21 -R3 11 21 31
24
3Y1 3Y21

B
Y
3B1 3B21 3R32 -R4
A1

-3F6
HR HY HB 220VAC
15 A2
MCB FP L1 L2 L3
-1F27
21 13 11
63A U/V & O/V 3F27/47/59 UV/OV ACK
RELAY. SHEET 31/E3 -R2 P.B R2
N 18 15 16 18 22 14 14 LAMP TEST
PHASE INDICATIONS RELAY
E SHEET 3R22 3R33
E
31/E3
3R34
A1 A1
HOOTER
-R3 -R2
220VAC A2 220VAC 220VAC
N N L3 L3 L2 L2 L1 L1
A2
3N1

3N1
3N1
N1 L1 L2 L3 SPD 4P 70KA
PE

INCOMING CONTROL CONTROL


HOOTER
TRAFO-02 RELAY RELAY
E

REVISION
DESCRIPTION POWER & CONTROL DIAGRAM OF INCOMING TRAFO-02 PANEL DESIGN BY S.M DRAWN DATE 16-05-2025
FOR APPROVAL
DESCRIPTION OF MODIFICATION (PS-1)
REV. DATE BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 31 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL 10

SHEET
28/D3

3R12

3R12
3R12

3R12

3R12

3R12

3R12
15

2-REMOTE

3R14
1-LOCAL
-3T1
A A

0-OFF
31/C6
16
3 1 11 9 7 5
3R13

-3S21 R 4 L 2 R 12 L 10 R8 L 6

31/D3
3R27

3R29

3R28

306

307

308

309
3R15
3R18
-3X4/1 -3X4/3
-3X5/6 -8 -7 -3X6/7 -8 -9 -10

-1X5/2 -2X2/3 TO -QM1 Remote Local


SHEET 27/A2,A3 Status Status
To PLC To PLC
2K1/31
1K1/31

SHEET 33/A4,A5
LOADING RELAY
OUTPUT A
11 30
-1R1 3R41
SHEET 27/E6

SHEET 29/E6

31 31
14 SHEET 31
FROM

FROM

-1K1 -2K1 32/E5


B -QM1
32
-QM2
32 B
2K1/32
1K1/32

Comand From PLC

Comand From PLC


-1X5/3 -2X2/4

ACB Close
ACB Open

SHEET 32/E8
-3X6/13 -3X6/11
-3S2 11 -3S1
OFF -1R2 ON
PB PB
-3X4/2 -3X4/4 -3X6/14 12 14 -3X6/12 -1S1
ON
PB
3R14

C C
3R19

3R16
3R20 3R17

-QM3
D1 C1 31 A1 21 B1 11 81 41

-1X7/1

OF4
220VAC 220VAC OF3 220VAC OF2 220VAC OF1 SDE1
M.N MX1 XF MCH 3R25 3R42

34/D3
D D2 C2 34 32 A2 24 22 B2 14 12 84 82 44 42 D
3R21 3R22

3R26
12 14 22 24 3R23 3R24 3 21 31 32 34
11 11 11
-3R3 -3R3 4 22 32
-3R3
14 -3R3 A1 11 21 A1 14 A1 31 A1 A1 12 14

3K1/22

3K1/32
3K1/21

3K1/31
-3K1

3K1/4
3K1/3
-3R1 -3R3 -3R2

3R25
3R12
G R Y
1P10

1P11

220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2


-3H3

3R19

3R16
3R18
-3X5/1 -2 -3 -4
-3H1 -3H2
FEED BACK -QM1 -QM2
TO MODULE 220VAC 220VAC Trip Light SHEET 33/E2 TO SHEET TO SHEET 220VAC
SHEET 33/C1 SHEET 32/B7
3N1

3N1

3N1

3N1

3N1
3N1

3N1

3N1

3N1

3N1

3N1
ON /OFF COMMAND

1N1
27/B1 29/B1
SHEET 32/C2,C3
UNDER VOLTAGE SHUNT CLOSING CONTROL MOTOR ON OFF TRIP CAD32 TRIP LAMP TEST CONTROL
E RELEASE TRIP COIL RELAY LIGHT LIGHT LIGHT LIGHT RELAY RELAY E
21 13 61

24 14 62

304

305

300

302

303
301
-3X6/5 -6 -3X6/1 -2 -3 -4

QM3 Trip QM3 Close QM3 Open


Status Status Status
To PLC To PLC TO PLC

REVISION
FOR APPROVAL DESCRIPTION CONTROL DIAGRAM OF INCOMING TRAFO-02 PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 32 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL 10

33/D6 33/D4 33/B8 32/B8 33/D5

3R26
3R12
44
42
43

45
46

34

40
35
36
37

38
39

41
A A

32
33
42 43 44 45 46 34 35 36 37 32 33 31 30 38 39 40 41 21 22 23
CT1 CT2 CT3 CT4 COM U V W N R S T N + - SCR
L1 L2 L3 S2 S1 L1 L2 L3
LOAD CURRENT DSENET
S2 VOLTS LOADING RELAY LOADING RELAY S1 VOLTS
RS232 RS485 OUTPUT B OUTPUT A

A
B
PROGRAMMING
SCR PORT

OUTPUT C OUTPUT D 6 DC OUTPUTS


BATTERY PLANT +VE
12 DIGITAL INPUTS OUTPUT E OUTPUT F
+VE

-VE
B B
2 1 48 49 51 51 52 53 9 10 11 12 13 14 15 16 17 18 19 20 3 4 5 6 7 8 31 30 31 30
OVDC

10

12

04
11

05
9
-3R3 R2 24VDC
SHEET 32/E3
1P10 1P11 33/D2 R1
11 14
SHEET A 24VDC
26/D7,8
OVDC
C C
11 14 11 14

R2/14
R2/11
R1/14
R1/11
33/D4

33/A4,A5
33/A3,4

33/A3
33/A5
33/C3

33/C4,C5
R2/14
R1/14
R2/11
R1/11

44
D
0VDC

40

34

42
43

45
46
38
39

35
36
37

32
33
41
10

12
11
9

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4 5 6 7 8 1 2 3 4 5 1 2
3Y11
3R11

3B11

1Y11
3K1/4

1R11

1B11
3K1/3

OVDC
1K1/4
1K1/3

3N1

T4
1N1

T3
T2

K1
T1

32
33
161

USER CONFIGURABLE -VE INPUT C

USER CONFIGURABLE +VE OUTPUT E

29/B8
31/A2
S1
E/M

26/D4
31/D4

P/B
27/E6

32/E6

E E

-X5 -X6
-X2 -X3 -X4 CURRENT CURRENT
INPUTS OUTPUTS VOLTAGES WIRES TRANSFORMER WIRES TRANSFORMER WIRES

REVISION
FOR APPROVAL DESCRIPTION CONTROL DIAGRAM OF 335 MODULE (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 33 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-11
L1 L1
L2 L2
L3 L3
N N
0-300A 0-300A
-P1 -P1
A DIGITAL A/M DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1 S1R -1X1/1
S1

S1
S1R1 S1R1
P1

P1
S2
S2R 2 S2R1 S2R 2 S2R1

S2
P2

P2
3 3
S1

S1
S1Y S1Y1 S1Y S1Y1
P1

P1
S2Y 4 S2Y1 S2Y 4 S2Y1
S2

S2
-T1~T3 -T1~T3
P2

P2
S1B 5 S1B1 S1B 5 S1B1
S1

S1
P1

P1
B 3xC.Ts 300/5A B
300/5A 6 6
S2B S2B1 S2B S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 32/D8
3R42
34/D7
1R13 34/D4
3R42
35/D3

N1 L1 L2 L3 01 01 N1 L1 L2 L3 01 01
-Q1 OF SD
12 14 22 24 32 34
-Q2 OF SD
12 14 22 24 32 34

D MCCB-FP SHUNT
220VAC 11 21 31
MCCB-FP SHUNT
220VAC 11 21 31 D
250A, N1 T1 T2 T3
04 02 04 02 250A, N1 T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP LAMP TEST ON OFF TRIP LAMP TEST
11 21 11 21 LIGHT LIGHT LIGHT RELAY 11 21 11 21 LIGHT LIGHT LIGHT RELAY
E E
N1 L1 L2 L3 14 22 14 24 N1 L1 L2 L3 14 22 14 24

OUTGOING OUTGOING

1R32
1R32
1R31

1R31
204
200

202

203

205
104
100

102

103

201
105
101

-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Trip MCCB Close MCCB Open MCCB Trip MCCB Trip
Status Status Status To Status Status Status To
To PLC TO PLC To PLC Hooter To PLC TO PLC To PLC Hooter
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 34 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-11
L1 L1
L2 L2
L3 L3
N N
0-100A 0-100A
-P1 -P1
A DIGITAL A/M DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1 S1R -1X1/1
S1

S1
S1R1 S1R1
P1

P1
S2
S2R 2 S2R1 S2R 2 S2R1

S2
P2

P2
3 3
S1

S1
S1Y S1Y1 S1Y S1Y1
P1

P1
S2Y 4 S2Y1 S2Y 4 S2Y1
S2

S2
-T1~T3 -T1~T3
P2

P2
S1B 5 S1B1 S1B 5 S1B1
S1

S1
P1

P1
B 3xC.Ts 3xC.Ts B
100/5A 6 100/5A 6
S2B S2B1 S2B S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 34/D8
3R42
35/D7
1R13 35/D4
3R42
36/D3

N1 L1 L2 L3 01 01 N1 L1 L2 L3 01 01
-Q3 OF SD
12 14 22 24 32 34
-Q4 OF SD
12 14 22 24 32 34

D MCCB-FP SHUNT
220VAC 11 21 31
MCCB-FP SHUNT
220VAC 11 21 31 D
100A, N1 T1 T2 T3
04 02 04 02 80A, N1 T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP LAMP TEST ON OFF TRIP LAMP TEST
11 21 11 21 LIGHT LIGHT LIGHT RELAY 11 21 11 21 LIGHT LIGHT LIGHT RELAY
E E
N1 L1 L2 L3 14 22 14 24 N1 L1 L2 L3 14 22 14 24

OUTGOING OUTGOING
1R32

1R32
1R31

1R31
404
400

402

403
304

405
300

302

303

305

401
301

-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Trip MCCB Close MCCB Open MCCB Trip MCCB Trip
Status Status Status To Status Status Status To
To PLC TO PLC To PLC Hooter To PLC TO PLC To PLC Hooter
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 35 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-11
L1 L1
L2 L2
L3 L3
N N
0-60A 0-60A
-P1 -P1
A DIGITAL A/M DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1 S1R -1X1/1
S1

S1
S1R1 S1R1
P1

P1
S2
S2R 2 S2R1 S2R 2 S2R1

S2
P2

P2
3 3
S1

S1
S1Y S1Y1 S1Y S1Y1
P1

P1
S2Y 4 S2Y1 S2Y 4 S2Y1
S2

S2
-T1~T3 -T1~T3
P2

P2
S1B 5 S1B1 S1B 5 S1B1
S1

S1
P1

P1
B 3xC.Ts 3xC.Ts B
60/5A 6 60/5A 6
S2B S2B1 S2B S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 35/D5
3R42
36/D7
1R13 36/D4
3R42
37/D3

N1 L1 L2 L3 01 01 N1 L1 L2 L3 01 01
-Q5 OF SD
12 14 22 24 32 34
-Q6 OF SD
12 14 22 24 32 34

D MCCB-FP SHUNT
220VAC 11 21 31
MCCB-FP SHUNT
220VAC 11 21 31 D
50A, N1 T1 T2 T3
04 02 04 02 40A, N1 T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP LAMP TEST ON OFF TRIP LAMP TEST
11 21 11 21 LIGHT LIGHT LIGHT RELAY 11 21 11 21 LIGHT LIGHT LIGHT RELAY
E E
N1 L1 L2 L3 14 22 14 24 N1 L1 L2 L3 14 22 14 24

OUTGOING OUTGOING
1R32

1R32
1R31

1R31
404
400

402

403
304

405
300

302

303

305

401
301

-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Trip MCCB Close MCCB Open MCCB Trip MCCB Trip
Status Status Status To Status Status Status To
To PLC TO PLC To PLC Hooter To PLC TO PLC To PLC Hooter
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 36 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-12
L1 L1
L2 L2
L3 L3
N N
0-300A 0-100A
-P1 -P1
A DIGITAL A/M DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1 S1R -1X1/1
S1

S1
S1R1 S1R1
P1

P1
S2
S2R 2 S2R1 S2R 2 S2R1

S2
P2

P2
3 3
S1

S1
S1Y S1Y1 S1Y S1Y1
P1

P1
S2Y 4 S2Y1 S2Y 4 S2Y1
S2

S2
-T1~T3 -T1~T3
P2

P2
S1B 5 S1B1 S1B 5 S1B1
S1

S1
P1

P1
B 3xC.Ts 100/5A B
300/5A 6 6
S2B S2B1 S2B S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 36/D8
3R42
37/D7
1R13 37/D4
3R42
38/D3

N1 L1 L2 L3 01 01 N1 L1 L2 L3 01 01
-Q1 OF SD
12 14 22 24 32 34
-Q2 OF SD
12 14 22 24 32 34

D MCCB-FP SHUNT
220VAC 11 21 31
MCCB-FP SHUNT
220VAC 11 21 31 D
250A, N1 T1 T2 T3
04 02 04 02 80A, N1 T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP LAMP TEST ON OFF TRIP LAMP TEST
11 21 11 21 LIGHT LIGHT LIGHT RELAY 11 21 11 21 LIGHT LIGHT LIGHT RELAY
E E
N1 L1 L2 L3 14 22 14 24 N1 L1 L2 L3 14 22 14 24

OUTGOING OUTGOING

1R32
1R32
1R31

1R31
204
200

202

203

205
104
100

102

103

201
105
101

-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Trip MCCB Close MCCB Open MCCB Trip MCCB Trip
Status Status Status To Status Status Status To
To PLC TO PLC To PLC Hooter To PLC TO PLC To PLC Hooter
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 37 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-12
L1 L1
L2 L2
L3 L3
N N
0-30A 0-30A
-P1 -P1
A DIGITAL A/M DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1 S1R -1X1/1
S1

S1
S1R1 S1R1
P1

P1
S2
S2R 2 S2R1 S2R 2 S2R1

S2
P2

P2
3 3
S1

S1
S1Y S1Y1 S1Y S1Y1
P1

P1
S2Y 4 S2Y1 S2Y 4 S2Y1
S2

S2
-T1~T3 -T1~T3
P2

P2
S1B 5 S1B1 S1B 5 S1B1
S1

S1
P1

P1
B 3xC.Ts 3xC.Ts B
30/5A 6 30/5A 6
S2B S2B1 S2B S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 37/D8
3R42
38/D7
1R13 38/D4
3R42
39/D3

N1 L1 L2 L3 01 01 N1 L1 L2 L3 01 01
-Q3 OF SD
12 14 22 24 32 34
-Q4 OF SD
12 14 22 24 32 34

D MCCB-FP SHUNT
220VAC 11 21 31
MCCB-FP SHUNT
220VAC 11 21 31 D
16A, N1 T1 T2 T3
04 02 04 02 25A, N1 T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP LAMP TEST ON OFF TRIP LAMP TEST
11 21 11 21 LIGHT LIGHT LIGHT RELAY 11 21 11 21 LIGHT LIGHT LIGHT RELAY
E E
N1 L1 L2 L3 14 22 14 24 N1 L1 L2 L3 14 22 14 24

OUTGOING OUTGOING
1R32

1R32
1R31

1R31
404
400

402

403
304

405
300

302

303

305

401
301

-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Trip MCCB Close MCCB Open MCCB Trip MCCB Trip
Status Status Status To Status Status Status To
To PLC TO PLC To PLC Hooter To PLC TO PLC To PLC Hooter
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 38 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL-12
L1 L1
L2 L2
L3 L3
N N
0-30A 0-30A
-P1 -P1
A DIGITAL A/M DIGITAL A/M A
AL1 AL2 AL3 BUILT-IN S.S AL1 AL2 AL3 BUILT-IN S.S
AUX AUX
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
S1R -1X1/1 S1R -1X1/1
S1

S1
S1R1 S1R1
P1

P1
S2
S2R 2 S2R1 S2R 2 S2R1

S2
P2

P2
3 3
S1

S1
S1Y S1Y1 S1Y S1Y1
P1

P1
S2Y 4 S2Y1 S2Y 4 S2Y1
S2

S2
-T1~T3 -T1~T3
P2

P2
S1B 5 S1B1 S1B 5 S1B1
S1

S1
P1

P1
B 3xC.Ts 3xC.Ts B
30/5A 6 30/5A 6
S2B S2B1 S2B S2B1
S2

S2
P2

P2
-1F1,1F2 -1F1,1F2
SP MCB SP MCB
2A, 2A,
1R1 1R11 1R1 1R11

1R1 1R12 1R12 1R1 1R12 1R12

C 1N1 1N1 C
31 31 31 31
1R12 -1R1 1R12 -1R1
34 32 -1R2 34 32 -1R2
34 34
CUSTOMER

CUSTOMER
-1X2/1 -1X2/1
FOR

FOR
-2 1R16 1R17 1R18 -2 1R16 1R17 1R18

1R13 38/D8
3R42
39/D7
1R13 39/D4
3R42
40/2

N1 L1 L2 L3 01 01 N1 L1 L2 L3 01 01
-Q5 OF SD
12 14 22 24 32 34
-Q6 OF SD
12 14 22 24 32 34

D MCCB-FP SHUNT
220VAC 11 21 31
MCCB-FP SHUNT
220VAC 11 21 31 D
25A, N1 T1 T2 T3
04 02 04 02 32A, N1 T1 T2 T3
04 02 04 02
1R19 1R20 1R21 1R19 1R20 1R21

1R14 1R15 G R Y 1R14 1R15 G R Y


-1H1 -1H2 -1H3 -1H1 -1H2 -1H3

-1R1 A1 -1R2 A1 -1R3 A1 -1R1 A1 -1R2 A1 -1R3 A1


220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2
1N1

1N1
1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1

1N1
ON OFF TRIP LAMP TEST ON OFF TRIP LAMP TEST
11 21 11 21 LIGHT LIGHT LIGHT RELAY 11 21 11 21 LIGHT LIGHT LIGHT RELAY
E E
N1 L1 L2 L3 14 22 14 24 N1 L1 L2 L3 14 22 14 24

OUTGOING OUTGOING
1R32

1R32
1R31

1R31
404
400

402

403
304

405
300

302

303

305

401
301

-1X3/1 -2 -3 -4 -5 -6 -1X3/1 -2 -3 -4 -5 -6

MCCB Close MCCB Open MCCB Trip MCCB Trip MCCB Close MCCB Open MCCB Trip MCCB Trip
Status Status Status To Status Status Status To
To PLC TO PLC To PLC Hooter To PLC TO PLC To PLC Hooter
E

REVISION
FOR APPROVAL DESCRIPTION POWER & CONTROL DIAGRAM OF OUTGOING PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 39 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CUBICAL-13
L1 L1
0-150A
L2 -P1 L2
DIGITAL A/M
L3 AL1 AL2 AL3 BUILT-IN S.S
L3
AUX
N1
S1R -1X1/1
S1 S2 S1 S2 S1 S2

S1
S1R1
1N1 P1
A A
S2 S2R 2 S2R1
P2

3
S1 S1Y S1Y1
P1

-T1~T3 S2Y 4 S2Y1


3xC.Ts
S2
P2

-1F1-1F3 -2F1-2F3 -3F1-3F3 -4F1-4F3


S1B 5 S1B1
S1

150/5A
P1

32A 32A 32A 32A


FUSE FUSE FUSE FUSE

S2B 6 S2B1
S2
P2

B 1N1 B
SP MCB
2A,
1R1 1R11

1R1 1R12

CUSTOMER
-1K1 -2K1 -3K1 -4K1
-1X2/1

FOR
31 31 TP CONTACTOR TP CONTACTOR TP CONTACTOR TP CONTACTOR
-1R1 -2 50A 50A 95A 95A
34 32 -1R2
34
1R13
C 1R16 1R17 1R18 C
42/D1 01 01 L1 L2 L3
3R42 1R42
39/D8
SD OF
-QMF
12 14 22 24 32 34
SHUNT
220VAC
MCCB-TP
02 04 02 04
T1 T2 T3
125A,
11 21 31

1R19 1R20 1R21 1R15 1R14


G R Y -1R3 A1
-1H1 -1H2 -1H3
A1 -1R2 A1 -1R1
220VAC A2
220VAC 220VAC 220VAC A2 220VAC A2 220VAC
D D
1N1
1N1

1N1

1N1

1N1

1N1

ON OFF TRIP LAMP TEST


LIGHT LIGHT LIGHT RELAY 11 21 11

14 22 14
104
105

103

102

100
101

-6 -1X3/5 -4 -3 -2 -1X3/1

MCCB Trip MCCB Open MCCB Close


Status Status Status
To PLC TO PLC To PLC

E CR1 CR2 CR3


E
CR4
12.5KVAR@440VAC 12.5KVAR@440VAC 12.5KVAR@440VAC 12.5KVAR@440VAC
1ST STAGE 2ND STAGE 3TH STAGE 4TH STAGE
-1X4/1
41/E1
PFI INCOMING
E

REVISION
POWER DIAGRAM OF 150KVAR PFI PANEL (PS-1 & PS-2) FOR APPROVAL DESCRIPTION POWER DIAGRAM OF 45KVAR PFI PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
01 FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
07 OF 40 APPROVED BY S.A SHEET NO 40 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICAL 13
L1 L1
L2 L2
L3 L3

Y1
R1

B1
A A
-F1 -F2 -F3
SP/MCB SP/MCB SP/MCB
2A 2A 2A CAMSCO
42/B1 R2 POWER FACTOR METER

Y2
R2

B2
Aux Supply Voltage Input Current Input
M 0 A

10
11
4
3

6
7

8
9
1 3 5 7 9 11

-S21 M 2 A4 M6 A 8 M 10 A 12
B B

B12

B13
Y13
R11

R12

Y12
R11 N1 Y12 B12 -1X1/1
S2 S1R21
FROM
S1 2 S2K21 SHEET 31/B2
R11

R12

R12
C C1 C

S2
S1
Y13 B13
N1
22
21

22C1 42/B1

A
D

B
C
14
13

41/E7 NR1 14C1 42/B1


ISKRA
POWER FACTOR CONTROLLER
PFC MAX 6
62
61

62C1 42/B3
D D
44
43

41/E7 NR2 44C1 42/B3

COM

4
2
3

5
6
1
72
71

72C1 42/B5

NR4
NR2
NR3

NR5
NR6
NR1
NR3 4C1
4
3

41/E7 42/B4
82
81

E 82C1 E

SHEET 41/D3
SHEET 41/D3
SHEET 41/D1
SHEET 41/D1
SHEET 41/E1
SHEET 41/E1
42/B6
54
53

41/E7 NR4 54C1 42/B6


R12

TO SHEET -1X2/1 N1 TO SHEET


N1
40/E1 42/E1

REVISION
FOR APPROVAL DESCRIPTION CONTROL DIAGRAM OF 45KVAR PFI PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 41 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CUBICAL 13

A A
SHEET 41/D2

SHEET 41/D2

SHEET 41/C2

SHEET 41/C2

SHEET 41/E2

SHEET 41/E2

SHEET 41/E2

SHEET 41/E2
44C1

54C1
62C1

72C1

82C1
22C1
14C1

4C1
B B
41/A3
R2
R2 R2 R2 R2
-1S2 -2S2 -3S2 -4S2
OFF OFF OFF OFF
PB PB PB PB

23C1 63C1 73C1 83C1

C -1S1 13 21 -2S1 13 21 -3S1 13 21 -4S1 13 21 C


ON 1K1 1K1 ON 2K1 2K1 ON 3K1 3K1 ON 4K1 4K1
PB PB 22
PB 22
PB
14 22 14 14 14 22

44C1

44C1

64C1

74C1

54C1

54C1

84C1
24C1
14C1

14C1

4C1

4C1
40/C3 3R42 3R42 3R42

D D
12 14 22 24 32 34 42 44 12 14 22 24 32 34 42 44

11 21 31 41 11 21 31 41
45C1

74C1

54C1

84C1
65C1
25C1
15C1

5C1
A1 A1 G R A1 G R A1 A1 G R A1 G R
-R1 -1K1 -1H1 -1H2 -2K1 -2H1 -2H2 -R2 -3K1 -3H1 -3H2 -4K1 -4H1 -4H2
E 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 220VAC A2 E
220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC

N1 N1 N1 N1 N1 N1 N1 N1 N1 N1 N1 N1 N1 N1
FROM
SHEET
41/E8 LAMP TEST MAGNETIC ON OFF MAGNETIC ON OFF LAMP TEST MAGNETIC ON OFF MAGNETIC ON OFF
RELAY CONTACTOR LIGHT LIGHT CONTACTOR LIGHT LIGHT RELAY CONTACTOR LIGHT LIGHT CONTACTOR LIGHT LIGHT
E

REVISION
CONTROL DIAGRAM OF 150KVAR PFI PANEL (PS-1 & PS-2) FOR APPROVAL DESCRIPTION CONTROL DIAGRAM OF 45KVAR PFI PANEL (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 42 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CUBICAL -01 CUBICAL -02 CUBICAL -03 CUBICAL -04 CUBICAL -05 CUBICAL -06 CUBICAL -07
L1 L1

L2 L2
L3 L3
A A

R90 R90 R90 R90 R90 R90 R90

-F1 -F1 -F1 -F1 -F1 -F1 -F1


SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB
2A, 2A, 2A, 2A, 2A, 2A, 2A,

B B
R91 R91 R91 R91 R91 R91 R91
THRMOSTATE

THRMOSTATE

THRMOSTATE

THRMOSTATE

THRMOSTATE

THRMOSTATE

THRMOSTATE
C C
-1F23 -1F23 -1F23 -1F23 -1F23 -1F23 -1F23

R92 R92 R92 R92 R92 R92 R92


D D

-F -F -F -F -F -F -F
FAN FAN FAN FAN FAN FAN FAN

E E
N1

N1

N1

N1

N1

N1

N1
N

REVISION
FOR APPROVAL DESCRIPTION CONTROL DIAGRAM OF PANEL LIGHT & FAN (PS-01) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 43 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CUBICAL -08 CUBICAL -09 CUBICAL -10 CUBICAL -11 CUBICAL -12 CUBICAL -13
L1 L1

L2 L2
L3 L3
A A

R90 R90 R90 R90 R90 R90

-F1 -F1 -F1 -F1 -F1 -F1


SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB
2A, 2A, 2A, 2A, 2A, 2A,

B B
R91 R91 R91 R91 R91 R91
THRMOSTATE

THRMOSTATE

THRMOSTATE

THRMOSTATE

THRMOSTATE

THRMOSTATE
C C
-1F23 -1F23 -1F23 -1F23 -1F23 -1F23

R92 R92 R92 R92 R92 R92


D D

-F -F -F -F -F -F
FAN FAN FAN FAN FAN FAN

E E
N1

N1

N1

N1

N1

N1
N

REVISION
FOR APPROVAL DESCRIPTION CONTROL DIAGRAM OF PANEL LIGHT & FAN (PS-01) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 44 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
F
E
B
A

D
C
1

1
T.B
-1X3
-QMF
FUSIBLE 200

1
PFI I/C MCCB CLOSE
STATUS TO PLC 201

2
202

3
PFI I/C MCCB OPEN
STATUS TO PLC 4 203
CUBICAL 01

204
5

PFI I/C MCCB TRIP


STATUS TO PLC 205
6

2
2

01
REV.
REVISION

DATE

3
3

-1X3
-1X3

7.5KW
7.5KW
-DOL-01

-DOL-04

FUSIBLE T.B
FUSIBLE T.B

DESCRIPTION OF MODIFICATION
400 100

1
1

MOTOR ON MOTOR ON
STATUS TO PLC 401 STATUS TO PLC 101

2
2

13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS


402 102

3
3

MOTOR TRIP MOTOR TRIP

BY
M.R
STATUS TO PLC 403 STATUS TO PLC 103

4
4

404 104

5
5

4
4

REMOTE S/S REMOTE S/S


405 105

AS BUILT
STATUS TO PLC 6 STATUS TO PLC
6

406 106
7
7

FOR APPROVAL
LOCAL S/S LOCAL S/S
STATUS TO PLC 407 STATUS TO PLC 107
8
8

FOR MANUFACTURING
-1X3
-1X3

7.5KW
7.5KW

5
-DOL-05
-DOL-02
5

CLIENT
FUSIBLE T.B
FUSIBLE T.B

PROJECT
500 200
1
1

MO NUMBER
PROJECT NO

DRAWING NO
MOTOR ON MOTOR ON

DESCRIPTION
STATUS TO PLC 501 STATUS TO PLC 201
2
2

502 202
3
3

MO-N/A
MOTOR TRIP MOTOR TRIP
STATUS TO PLC 503 STATUS TO PLC 203
4
4

504 204
5
5

SEWD1-586261124
REMOTE S/S REMOTE S/S
CUBICAL 02

STATUS TO PLC 505 STATUS TO PLC 205


6
6

GTD-586261124-REV02
SCHNEIDER ELECTRIC
DESCON ENGINEERING

506 206
7
7

LOCAL S/S LOCAL S/S

6
6

STATUS TO PLC 507 STATUS TO PLC 207


8
8

TERMINAL BLOCK DETAILS OF (PS-1)


-1X3
-1X3

7.5KW
7.5KW

-DOL-06
-DOL-03

FUSIBLE T.B
FUSIBLE T.B

600 300
1
1

MOTOR ON MOTOR ON
STATUS TO PLC 601 STATUS TO PLC 301
2
2

7
7

602 302
3
3

MOTOR TRIP MOTOR TRIP


STATUS TO PLC 603 STATUS TO PLC 303
4
4

604 304
5
5

REV NO

REMOTE S/S REMOTE S/S


DESIGN BY

STATUS TO PLC 605 STATUS TO PLC 305


6
6

CHECKED BY

APPROVED BY
RE CHECKED BY

606 306
7
7

LOCAL S/S LOCAL S/S


00
S.A
N/A
S.M

M.R

STATUS TO PLC 607 STATUS TO PLC 307


8
8

QTY

8
8

SCALE

SHEET NO
N.T.S

45 OF 51
DRAWN DATE 16-05-2025

F
E
B
A

D
C
F
E
B
A

-1X3
-1X3

11KW
11KW
-DOL-01

-DOL-06
D FUSIBLE T.B
FUSIBLE T.B
1

1
600 100

1
1
MOTOR ON MOTOR ON
STATUS TO PLC 602 STATUS TO PLC 102

2
2
603 103

3
3
MOTOR TRIP MOTOR TRIP
STATUS TO PLC 604 STATUS TO PLC 104

4
4
604 104

5
5
REMOTE S/S REMOTE S/S
STATUS TO PLC 605 STATUS TO PLC 105

6
6
606 106

7
7
LOCAL S/S LOCAL S/S
STATUS TO PLC 607 STATUS TO PLC 107

8
8

2
2

01
REV.
REVISION

DATE
-1X3
-1X3

11KW
11KW

-DOL-07
-DOL-02

FUSIBLE T.B
FUSIBLE T.B

700 200

1
1

MOTOR ON MOTOR ON
STATUS TO PLC 702 STATUS TO PLC 202

2
2

703 203

3
3

MOTOR TRIP MOTOR TRIP


STATUS TO PLC 704 STATUS TO PLC 204

4
4

3
3

704 204

5
5

REMOTE S/S REMOTE S/S


STATUS TO PLC 705 STATUS TO PLC 205

6
6

706 206

DESCRIPTION OF MODIFICATION
7
7

LOCAL S/S LOCAL S/S


STATUS TO PLC 707 STATUS TO PLC 207

8
8

13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS


BY
M.R
-1X3
-1X3

11KW
11KW

-DOL-08
-DOL-03

4
4

FUSIBLE T.B
FUSIBLE T.B

800 300
1
1

AS BUILT
MOTOR ON MOTOR ON
STATUS TO PLC 802 STATUS TO PLC 302
2
2

FOR APPROVAL
803 303
3
3

MOTOR TRIP MOTOR TRIP

FOR MANUFACTURING
STATUS TO PLC 804 STATUS TO PLC 304
4
4

804 304
5
5
CUBICAL 03

REMOTE S/S REMOTE S/S


STATUS TO PLC 805 STATUS TO PLC 305
6
6

806 306
7
7

5
LOCAL S/S LOCAL S/S
5

CLIENT
STATUS TO PLC 807 STATUS TO PLC 307
8
8

PROJECT

MO NUMBER
PROJECT NO

DRAWING NO
DESCRIPTION
-1X3
11KW

MO-N/A
-DOL-04

FUSIBLE T.B

400
1

MOTOR ON

SEWD1-586261124
STATUS TO PLC 402
2

GTD-586261124-REV02
SCHNEIDER ELECTRIC
DESCON ENGINEERING

403
3

MOTOR TRIP

6
6

STATUS TO PLC 404


4

TERMINAL BLOCK DETAILS OF (PS-1)

404
5

REMOTE S/S
STATUS TO PLC 405
6

406
7

LOCAL S/S
STATUS TO PLC 407
8
-1X3
11KW

7
7

-DOL-05

FUSIBLE T.B

500
1

MOTOR ON
STATUS TO PLC 502
2

REV NO
DESIGN BY

503
3

CHECKED BY

MOTOR TRIP
APPROVED BY
RE CHECKED BY

STATUS TO PLC 504


4

00

504
S.A
N/A
S.M

M.R
5

REMOTE S/S
STATUS TO PLC 505
6

QTY

506
7

8
8

SCALE

LOCAL S/S
STATUS TO PLC 507
SHEET NO
8

N.T.S

46 OF 51
DRAWN DATE 16-05-2025

F
E
B
A

D
C
F
E
B
A

D
C
-Q1

-Q4

-1X3
-1X3

MCCB
MCCB
1

FUSIBLE T.B
FUSIBLE T.B

1
400 100

1
1
MCCB CLOSE MCCB CLOSE
STATUS TO PLC 402 STATUS TO PLC 102

2
2
403 103

3
3
MCCB OPEN MCCB OPEN
STATUS TO PLC 404 STATUS TO PLC 104

4
4
404 104

5
5
MCCB TRIP MCCB TRIP
STATUS TO PLC 405 STATUS TO PLC 105

6
6

2
2

01
REV.
-Q5
-Q2

-1X3
-1X3

MCCB
MCCB

REVISION
FUSIBLE T.B
FUSIBLE T.B

DATE
500 200

1
1

MCCB CLOSE MCCB CLOSE


STATUS TO PLC 502 STATUS TO PLC 202

2
2

503 203

3
3

MCCB OPEN MCCB OPEN


STATUS TO PLC 504 STATUS TO PLC 204

4
4
CUBICAL 04

504 204

5
5

MCCB TRIP MCCB TRIP

3
3

STATUS TO PLC 505 STATUS TO PLC 205

6
6

-Q6
-Q3

-1X3
-1X3

MCCB
MCCB

DESCRIPTION OF MODIFICATION
FUSIBLE T.B
FUSIBLE T.B

600 300

1
1

13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS


MCCB CLOSE MCCB CLOSE
STATUS TO PLC 602 STATUS TO PLC 302

2
2

BY
M.R
603 303

3
3

MCCB OPEN MCCB OPEN


STATUS TO PLC 604 STATUS TO PLC 304

4
4

4
4

604 304

AS BUILT
5
5

MCCB TRIP MCCB TRIP


STATUS TO PLC 605 STATUS TO PLC 305
6
6

FOR APPROVAL

FOR MANUFACTURING
-Q1

-Q4

-1X3
-1X3

MCCB
MCCB

FUSIBLE T.B
FUSIBLE T.B

5
400 100
1
1
5

CLIENT
MCCB CLOSE MCCB CLOSE

PROJECT
STATUS TO PLC 402 STATUS TO PLC 102
2
2

MO NUMBER
PROJECT NO

DRAWING NO
DESCRIPTION
403 103
3
3

MCCB OPEN MCCB OPEN


STATUS TO PLC 404 STATUS TO PLC 104
4
4

MO-N/A
404 104
5
5

MCCB TRIP MCCB TRIP


STATUS TO PLC 405 STATUS TO PLC 105
6
6

SEWD1-586261124
GTD-586261124-REV02
SCHNEIDER ELECTRIC
DESCON ENGINEERING
-Q5
-Q2

6
6

-1X3
-1X3

MCCB
MCCB

TERMINAL BLOCK DETAILS OF (PS-1)


FUSIBLE T.B
FUSIBLE T.B

500 200
1
1

MCCB CLOSE MCCB CLOSE


STATUS TO PLC 502 STATUS TO PLC 202
2
2

503 203
3
3

MCCB OPEN MCCB OPEN


STATUS TO PLC 504 STATUS TO PLC 204
4
4
CUBICAL 05

504 204
5
5

MCCB TRIP MCCB TRIP


STATUS TO PLC 505 STATUS TO PLC 205
6
6

7
7

-Q6
-Q3

-1X3
-1X3

MCCB
MCCB

REV NO
FUSIBLE T.B
FUSIBLE T.B

DESIGN BY

600 300
1
1

CHECKED BY

APPROVED BY

MCCB CLOSE MCCB CLOSE


RE CHECKED BY

STATUS TO PLC 602 STATUS TO PLC 302


2
2

00
S.A
N/A
S.M

M.R

603 303
3
3

MCCB OPEN MCCB OPEN


STATUS TO PLC 604 STATUS TO PLC 304
4
4

QTY

604 304
8
8

5
5

SCALE

MCCB TRIP MCCB TRIP


SHEET NO

STATUS TO PLC 605 STATUS TO PLC 305


6
6

N.T.S

47 OF 51
DRAWN DATE 16-05-2025

F
E
B
A

D
C
1 2 3 4 5 6 7 8

CUBICAL 06

404

404
204
204

304
304

400

402
403

405

504
504
200

202
203

205

300

302
303

305

500

502
503

505
104
104
100

102
103

105
A A

-Q1 -Q2 -Q3 -Q4 -Q5


MCCB MCCB MCCB MCCB MCCB
FUSIBLE T.B FUSIBLE T.B FUSIBLE T.B FUSIBLE T.B FUSIBLE T.B
-1X3 -1X3 -1X3 -1X3 -1X3

1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6

B B
STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC
MCCB CLOSE

MCCB CLOSE

MCCB CLOSE

MCCB CLOSE

MCCB CLOSE
MCCB OPEN

MCCB OPEN

MCCB OPEN

MCCB OPEN

MCCB OPEN
MCCB TRIP

MCCB TRIP

MCCB TRIP

MCCB TRIP

MCCB TRIP
C C
604
604

704
704
600

602
603

605

700

702
703

705

-Q6 -Q7
D MCCB MCCB D
FUSIBLE T.B FUSIBLE T.B
-1X3 -1X3

1 2 3 4 5 6 1 2 3 4 5 6
STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

E E
MCCB CLOSE

MCCB CLOSE
MCCB OPEN

MCCB OPEN
MCCB TRIP

MCCB TRIP

REVISION
FOR APPROVAL DESCRIPTION TERMINAL BLOCK DETAILS OF (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 48 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CUBICAL 07

404

404
204
204

304
304

400

402
403

405

504
504
200

202
203

205

300

302
303

305

500

502
503

505
104
104
100

102
103

105
A A

-Q1 -Q2 -Q3 -Q4 -Q5


MCCB MCCB MCCB MCCB MCCB
FUSIBLE T.B FUSIBLE T.B FUSIBLE T.B FUSIBLE T.B FUSIBLE T.B
-1X3 -1X3 -1X3 -1X3 -1X3

1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6

B B
STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC
MCCB CLOSE

MCCB CLOSE

MCCB CLOSE

MCCB CLOSE

MCCB CLOSE
MCCB OPEN

MCCB OPEN

MCCB OPEN

MCCB OPEN

MCCB OPEN
MCCB TRIP

MCCB TRIP

MCCB TRIP

MCCB TRIP

MCCB TRIP
C C
604
604

704
704
600

602
603

605

700

702
703

705

-Q6 -Q7
D MCCB MCCB D
FUSIBLE T.B FUSIBLE T.B
-1X3 -1X3

1 2 3 4 5 6 1 2 3 4 5 6
STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

E E
MCCB CLOSE

MCCB CLOSE
MCCB OPEN

MCCB OPEN
MCCB TRIP

MCCB TRIP

REVISION
FOR APPROVAL DESCRIPTION TERMINAL BLOCK DETAILS OF (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 49 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CUBICAL 08 CUBICAL 09 CUBICAL 10 CUBICAL 13

A A

B B

204
200

202

203

205
201
204

304
200

202

203

205

206

207

208

209

300

302

303

305

306

307

308

309
104
100

102

103

105

106

107

108

109

201

301
101

-QMF
FUSIBLE
-QM1 -QM2 -QM3
T.B
ACB ACB ACB
-1X3
FUSIBLE T.B FUSIBLE T.B FUSIBLE T.B
-1X6 -1X6 -1X6

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6
C C

PFI I/C MCCB CLOSE

PFI I/C MCCB OPEN

PFI I/C MCCB TRIP


STATUS TO PLC

STATUS TO PLC

STATUS TO PLC
STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC
STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC

STATUS TO PLC
REMOTE S/S

REMOTE S/S

REMOTE S/S
LOCAL S/S

LOCAL S/S

LOCAL S/S
ACB CLOSE

ACB CLOSE

ACB CLOSE
ACB OPEN

ACB OPEN

ACB OPEN
ACB TRIP

ACB TRIP

ACB TRIP
D D

E E

REVISION
FOR APPROVAL DESCRIPTION TERMINAL BLOCK DETAILS OF (PS-1) DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 50 OF 51
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
F
E
B
A

D
C
-Q1

-Q4

-1X3
-1X3

MCCB
MCCB
1

FUSIBLE T.B
FUSIBLE T.B

1
400 100

1
1
MCCB CLOSE MCCB CLOSE
STATUS TO PLC 402 STATUS TO PLC 102

2
2
403 103

3
3
MCCB OPEN MCCB OPEN
STATUS TO PLC 404 STATUS TO PLC 104

4
4
404 104

5
5
MCCB TRIP MCCB TRIP
STATUS TO PLC 405 STATUS TO PLC 105

6
6

2
2

01
REV.
-Q5
-Q2

-1X3
-1X3

MCCB
MCCB

REVISION
FUSIBLE T.B
FUSIBLE T.B

DATE
500 200

1
1

MCCB CLOSE MCCB CLOSE


STATUS TO PLC 502 STATUS TO PLC 202

2
2

503 203

3
3

MCCB OPEN MCCB OPEN


STATUS TO PLC 504 STATUS TO PLC 204

4
4

504 204
CUBICAL 11

5
5

MCCB TRIP MCCB TRIP

3
3

STATUS TO PLC 505 STATUS TO PLC 205

6
6

-Q6
-Q3

-1X3
-1X3

MCCB
MCCB

DESCRIPTION OF MODIFICATION
FUSIBLE T.B
FUSIBLE T.B

600 300

1
1

13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS


MCCB CLOSE MCCB CLOSE
STATUS TO PLC 602 STATUS TO PLC 302

2
2

BY
M.R
603 303

3
3

MCCB OPEN MCCB OPEN


STATUS TO PLC 604 STATUS TO PLC 304

4
4

4
4

604 304

AS BUILT
5
5

MCCB TRIP MCCB TRIP


STATUS TO PLC 605 STATUS TO PLC 305
6
6

FOR APPROVAL

FOR MANUFACTURING
-Q1

-Q4

-1X3
-1X3

MCCB
MCCB

FUSIBLE T.B
FUSIBLE T.B

5
400 100
1
1
5

CLIENT
MCCB CLOSE MCCB CLOSE

PROJECT
STATUS TO PLC 402 STATUS TO PLC 102
2
2

MO NUMBER
PROJECT NO

DRAWING NO
DESCRIPTION
403 103
3
3

MCCB OPEN MCCB OPEN


STATUS TO PLC 404 STATUS TO PLC 104
4
4

MO-N/A
404 104
5
5

MCCB TRIP MCCB TRIP


STATUS TO PLC 405 STATUS TO PLC 105
6
6

SEWD1-586261124
GTD-586261124-REV02
SCHNEIDER ELECTRIC
DESCON ENGINEERING
-Q5
-Q2

6
6

-1X3
-1X3

MCCB
MCCB

TERMINAL BLOCK DETAILS OF (PS-1)


FUSIBLE T.B
FUSIBLE T.B

500 200
1
1

MCCB CLOSE MCCB CLOSE


STATUS TO PLC 502 STATUS TO PLC 202
2
2

503 203
3
3

MCCB OPEN MCCB OPEN


STATUS TO PLC 504 STATUS TO PLC 204
4
4
CUBICAL 12

504 204
5
5

MCCB TRIP MCCB TRIP


STATUS TO PLC 505 STATUS TO PLC 205
6
6

7
7

-Q6
-Q3

-1X3
-1X3

MCCB
MCCB

REV NO
FUSIBLE T.B
FUSIBLE T.B

DESIGN BY

600 300
1
1

CHECKED BY

APPROVED BY

MCCB CLOSE MCCB CLOSE


RE CHECKED BY

STATUS TO PLC 602 STATUS TO PLC 302


2
2

00
S.A
N/A
S.M

M.R

603 303
3
3

MCCB OPEN MCCB OPEN


STATUS TO PLC 604 STATUS TO PLC 304
4
4

QTY

604 304
8
8

5
5

SCALE

MCCB TRIP MCCB TRIP


SHEET NO

STATUS TO PLC 605 STATUS TO PLC 305


6
6

N.T.S

51 OF 51
DRAWN DATE 16-05-2025

F
E
B
A

D
C
1 2 3 4 5 6 7 8

ESSENTAIL DISTRIBUTION
FROM LV
SWITCHGEAR
BUS SECTION-B
INCOMING BOARD PS-1
FROM
415V, 50 Hz MPB-SYNCH
-P16 -P16
A V.M V.M A
PHASE MCB SP MCB SP PHASE
INDICATION 2A 2A INDICATION

ON OFF ON OFF

ON PB OFF PB ON PB OFF PB
-QM.. -QM..
MCCB FP MCCB FP
160A 160A

ATS
B -KM1 -KM2 B
M.C FP E M.C FP
185A M-O-A
185A

-P1 -P1
A.M 3XC.Ts A.M 3XC.Ts
150/5A 150/5A
50Hz, 25kA, 1S
415V, 160A, 3P+N+

C -Q -Q -Q -Q -Q -Q -Q -Q -Q -Q C
MCCB FP MCCB FP -Q -Q MCB DP MCB DP MCB TP MCB TP MCB TP MCB SP MCB SP MCB SP
63A 63A MCCB FP MCCB FP 100A 25A 6A 6A 6A 2A 2A 2A
QTY-02 QTY-02 63A 63A QTY-02 QTY-02 QTY-02 QTY-02 QTY-02 QTY-02 QTY-02

D D

PUMP STATION - LIGHTING AND SMALL POWER


0.6/1 kV-Cu/PVC/PVC- 5C (3P+N+E)-10 mm2

0.6/1 kV-Cu/PVC/PVC- 5C (3P+N+E)-6 mm2

0.6/1 kV-Cu/PVC/PVC- 5C (3P+N+E)-6 mm2

0.6/1KV,CU/PVC/PVC-3C (P+N+E)-16 MM2

0.6/1kV,Cu/PVC/PVC-3C (P+N+E)-2.5 mm2

0.6/1kV,Cu/PVC/PVC-3C (P+N+E)-2.5 mm2

0.6/1kV,Cu/PVC/PVC-3C (P+N+E)-2.5 mm2


0.6/1kV,Cu/PVC/PVC-4C (3P+E)-2.5 mm2

0.6/1kV,Cu/PVC/PVC-4C (3P+E)-2.5 mm2

0.6/1kV,Cu/PVC/PVC-4C (3P+E)-2.5 mm2


UPS FED DISTRIBUTION BOARD
EXTERNAL BYPASS SWITCH

EXTERNAL BYPASS SWITCH

MOTORIZED BALL VALVES

MOTORIZED BALL VALVES

MOTORIZED BALL VALVES


(P-LVEDB-DBU-01) 5.7KW

MV MOTOR AUXILIARIES

MV MOTOR AUXILIARIES

MV MOTOR AUXILIARIES
(P-LVEDB-PS-01)

(P-LVEDB-PS-01)

(P-LVEDB-PS-01)
E E

0.5KW (tentative)

0.5KW (tentative)

0.5KW (tentative)
FOR AC UPS1

FOR AC UPS2
AC UPS01

AC UPS02

DC UPS01
15 KVA

10 KVA

10 KVA

1.8kW

1.8kW

1.8kW
REVISION
FOR APPROVAL DESCRIPTION SINGLE LINE DIAGRAM OF DESIGN BY S.M DRAWN DATE 16-05-2025
REV. DATE DESCRIPTION OF MODIFICATION BY (ESSENTAIL DISTRIBUTION BOARD PS-1)
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 01 OF 06
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CUBICAL 01
L1 L1
L2 L2
L3 L3
N1 N1

1R31 12
A 0-150A 0-150A
2/E3 A
DIGITAL A/M -P1 -P1 DIGITAL A/M 11 1R32
BUILT-IN S.S AL3 AL2 AL1 AL1 AL2 AL3 BUILT-IN S.S
-R4
AUX
S2 S1 S2 S1 S2 S1 S1 S2 S1 S2 S1 S2
AUX
2R31 2/F7
2/E6
14
S2R1 -1X1/1 S2R S2R -1X1/1 S2R1 21 21

P2
P2
S2

S2
-R1 -R3
S1R1 2 S1R S1R 2 S1R1 24 24

S1

S1
P1

P1
3 3 1R33

P2
S2

S2
S2Y1 S2Y S2Y S2Y1

P2
S1Y1 4 S1Y S1Y 4 S1Y1 21 13 11
B ACK
R1 B

S1

S1
-R1

P1

P1
P.B
5 -T1~T3 -T1~T3 5

P2
S2

P2
S2
S2B1 S2B S2B S2B1 22 14 14

6 S1B
3xC.Ts 3xC.Ts S1B 6 1R34 1R35
S1B1 S1B1
150/5A 150/5A

S1

S1
P1

P1
HOOTER A1
1N1 22 -R1
2/E3 220VAC 220VAC A2

1N1
1N1
E 21
-R4 HOOTER CONTROL
-1K1 INTERLOCK -2K1 2N1 2/F7
TP 185A TP 185A 2/E6 RELAY
24
C C
N1 L1 L2 L3 N1 L1 L2 L3

-QM1 -QM2
0-500V MCCB-FP MCCB-FP 0-500V -S1
-P16 DIGITAL V/M 160A N1 T1 T2 T3 N1 T1 T2 T3
160A -P16 DIGITAL V/M LAMP
TEST
BUILT-IN S.S BUILT-IN S.S
AUX AUX
L1 L2 L3 N L1 L2 L3 N
-1F1~1F5 -2F1~2F5
MCB SP MCB SP
2A 2A
1R11 1R1 2R1 2R11

1Y11 1Y1 2Y1 2Y11


D 1B11 1B1 2B1 2B11
D
1N1 2N1
1R21A 1R1 2R1 2R21A
TO SHEET 3/A1,E1 TO SHEET 3/A5,E5 3/C3
1R32
2/D7 1N1 2N1 2/D2 1R32 1R32
1R31 1R1 2R1 2R31
TO SHEET 2/A7,C7 TO SHEET 2/A7,C7
1N1 2N1
12 14 22 24 32 34 -1F6 -2F6 12 14 22 24 32 34
TP MCB TP MCB
11 21 31
2A 2A 11 21 31
1R21 1R1 2R1 2R21
A1 -R2 R R -R5 A1
Y B 15 1Y21 2Y21 15 Y B
1Y1 2Y1
A2 220VAC HR HY HB -1F27 -1F27 HR HY HB 220VAC A2
E UV/OV
SHEET 2/E2
1B21 1B1 2B1 2B21 UV/OV
SHEET 2/E6 E
18 18
1R22 L3 L2 L1 L1 L2 L3 2R22
LAMP TEST PHASE INDICATIONS 1F27/47/59 U/V & O/V U/V & O/V 1F27/47/59 PHASE INDICATIONS LAMP TEST
11 21
RELAY A1
RELAY. RELAY.
A1 A1 RELAY
-R1 16 15 18 N
N L1 L2 L3 N L1 L2 L3 N 18 15 16
-R3 -R4 14 12 24 22
A2 220VAC 220VAC A2 220VAC A2
SHEET 2/E2 INCOMING INCOMING SHEET
2/E7

CONTROL CONTROL CONTROL


E RELAY RELAY RELAY SHEET 2/A7,A8 SHEET 2/C7,C8

REVISION POWER & CONTROL DIAGRAM OF ATS PANEL


FOR APPROVAL DESCRIPTION DESIGN BY S.M DRAWN DATE 16-05-2025
(ESSENTAIL DISTRIBUTION BOARD PS-1)
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 02 OF 06
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CUBICAL 01
1R21A 11 12 2R21A 11 12 2R21
SHEET 2/D2 SHEET 2/D6
-R1 -R3

1R21

2R21

2R21
1R21
A A
A 0 M

3 1 7 5 11 9

A 4 M 2 A 8 M 6 A 12 M 10
-S21

100

101

102

103
1R22

2R22
-3X6/1 -2 -3 -4

-1S2 -2S2 Remote Local


OFF OFF Status Status
PB PB
To PLC To PLC
B B
1R23 2R23

-1S1 53 61 -2S1 53 61
ON 1K1 1K1 ON 2K1 2K1
PB PB
54 62 54 62

1R24 2R24
1R27 2R27

81 71
C 2K1 1K1 C
SHEET 11/E5 1R26 SHEET 11/E2
72
2R26
82

15 18 1R25 15 18 2R25
-1T1 -1T1
2/D8
1R32 1R32

12 14 22 24 32 34 42 44

-1R2 11
-1R2 21
-1R2 31
-1R2 41

D 1R25A 1R22A 2R25A 2R22A


D
2 -1R1 -1K1
2 -2R1
A1 A1 G R -1R2 A1 A1 -2K1 A1 G R
-1T1 -1H1 -1H2 -2T1 -2H1 -2H2
220VAC 220VAC A2 220VAC A2 220VAC A2 220VAC 220VAC A2 220VAC A2
7 220VAC 220VAC 7 220VAC 220VAC
1N1 1N1 1N1 1N1 1N1 2N1 1N1 2N1 2N1 2N1
SHEET 2/E6 2N1
SHEET 2/E2
ON OFF ON OFF
LIGHT LIGHT LAMP TEST LIGHT LIGHT
RELAY
11 21 11 21

14 22 14 22
E E
104

105

107

109
106

108

110

111
-6 -7 -8 -6 -6 -7 -8

ON OFF ON OFF
Status Status Status Status
To PLC TO PLC To PLC TO PLC
E

REVISION
DESCRIPTION CONTROL DIAGRAM OF ATS PANEL DESIGN BY S.M DRAWN DATE 16-05-2025
FOR APPROVAL
REV. DATE DESCRIPTION OF MODIFICATION BY (ESSENTAIL DISTRIBUTION BOARD PS-1)
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 03 OF 06
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

415V, 3PH, 4WIRE, 50HZ.


CUBICAL 02
L1 L1
L2 L2
L3 L3
N1 L3
A A

COMB COMB COMB


BUSBAR BUSBAR BUSBAR
N1 L1 L2 L3 N1 L1 L2 L3

-1Q7 -1Q8
MCCB-FP MCCB-FP
B B
63A, N1 T1 T2 T3 63A, N1 T1 T2 T3
-1Q1 -1Q2 -1Q3 -1Q4 -1Q5 -1Q6
SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB
2A 2A 2A 2A 2A 2A

C C

N1 L1 L2 L3 N1 L1 L2 L3
OUTGOING OUTGOING
L1 L1 L2 L2 L3 L3
OUTGOING
D D

E E

N
E

REVISION POWER DIAGRAM OF ATS PANEL


FOR APPROVAL DESCRIPTION DESIGN BY S.M DRAWN DATE 16-05-2025
(ESSENTAIL DISTRIBUTION BOARD PS-1)
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 04 OF 06
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

415V, 3PH, 4WIRE, 50HZ.


CUBICAL 02
L1 L1
L2 L2
L3 L3
N1 L3
A A

N1 L1 L2 L3 N1 L1 L2 L3 N1 L1 L2 L3 N1 L1 L2 L3

-1Q9 -1Q10 -1Q11 -1Q12 -1Q13 -1Q14 -1Q15


MCB-DP MCB-DP MCB-DP
MCCB-FP MCCB-FP MCCB-FP MCCB-FP 100A 100A 25A
B B
63A, N1 T1 T2 T3 63A, N1 T1 T2 T3 63A, N1 T1 T2 T3 63A, N1 T1 T2 T3

C C

N1 L1 L2 L3 N1 L1 L2 L3 N1 L1 L2 L3 N1 L1 L2 L3 N1 L1 N1 L2 N1 L3
OUTGOING OUTGOING OUTGOING OUTGOING OUTGOING OUTGOING OUTGOING

D D

E E

N
E

REVISION POWER DIAGRAM OF ATS PANEL


FOR APPROVAL DESCRIPTION DESIGN BY S.M DRAWN DATE 16-05-2025
(ESSENTAIL DISTRIBUTION BOARD PS-1)
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 05 OF 06
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

415V, 3PH, 4WIRE, 50HZ.


CUBICAL 02 CUBICAL -01 CUBICAL -02
L1 L1
L2 L2
L3 L3
N1 L3
A A

R90 R90

-F1 -F1
SP MCB SP MCB
-1Q16 -1Q17 -1Q18 -1Q19 -1Q20 -1Q21 2A, 2A,
MCB-TP MCB-TP MCB-TP MCB-TP MCB-TP MCB-TP
6A 6A 6A 6A 6A 6A
B B

C R91 R91 C

L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
OUTGOING OUTGOING OUTGOING OUTGOING OUTGOING OUTGOING

D D

-F -F
FAN FAN

E E

N1

N1
N
E

REVISION POWER DIAGRAM OF ATS PANEL


FOR APPROVAL DESCRIPTION DESIGN BY S.M DRAWN DATE 16-05-2025
(ESSENTAIL DISTRIBUTION BOARD PS-1)
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 06 OF 06
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Motor Control Center


(Motorized Ball Valves) for PS-1

A INCOMING A
-P16
V.M
PHASE MCB SP
INDICATION 2A

B -QM.. B
MCCB FP
40A

-P1
A.M 3XC.Ts
60/5A
50Hz, 25kA, 1S
C 415V, 160A, 3P+N+ C

-Q -Q -Q -Q -Q -Q -Q
MCCB TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB TP
16A 16A 16A 16A 16A 16A 16A

D D

E E
OUTGOING OUTGOING OUTGOING OUTGOING OUTGOING OUTGOING OUTGOING

REVISION SINGLE LINE DIAGRAM OF


FOR APPROVAL DESCRIPTION DESIGN BY S.M DRAWN DATE 16-05-2025
MOTOR CONTROL CENTER (MOTORIZED BALL VALVES) FOR PS-1
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 01 OF 03
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

415V, 3PH, 4WIRE, 50HZ.


CUBICAL 01
L1 L1
L2 L2
L3 L3

A A
0-150A
DIGITAL A/M
-P1 AL1 AL2 AL3 BUILT-IN S.S
AUX
S1 S2 S1 S2 S1 S2

S2R -1X1/1 S2R1

S2
P2

S1 S1R 2 S1R1
P1

3
P2

S2 S2Y S2Y1
B B
S1Y 4 S1Y1
-T1~T3
S1
P1

5
S2

3xC.Ts S2B S2B1


P2

60/5A S1B 6 S1B1


S1
P1

N1 L1 L2 L3

-QM
C C
MCCB-FP -P16
0-500V
DIGITAL V/M
40A N1 T1 T2 T3

-1F1~1F3 L1 L2 L3 N
BUILT-IN S.S
AUX

SP MCB
2A,
R1 R11

Y1 Y11

B1 B11
D D
R1 B21
-S1
N1 LAMP
N1 TEST
R22

12 14 22 24 32 34

11 21 31

R11A Y11A B11A

E E

B
Y
-R1 A1
N1 L1 L2 L3 HR HY HB 220VAC A2

INCOMING PHASE INDICATIONS LAMP TEST


RELAY
N
E

REVISION POWER & CONTROL WIRING DIAGRAM OF


FOR APPROVAL DESCRIPTION DESIGN BY S.M DRAWN DATE 16-05-2025
MOTOR CONTROL CENTER (MOTORIZED BALL VALVES) FOR PS-1
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 02 OF 03
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

415V, 3PH, 4WIRE, 50HZ.


CUBICAL 01
L1 L1
L2 L2
L3 L3

A A

R90

-F1
SP MCB
L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
2A,
-1Q1 -1Q2 -1Q3 -1Q4 -1Q5 -1Q6
B MCCB-TP MCCB-TP MCCB-TP MCCB-TP MCCB-TP MCCB-TP B
16A T1 T2 T3
16A T1 T2 T3
16A T1 T2 T3
16A T1 T2 T3
16A T1 T2 T3
16A T1 T2 T3

C R91 C

L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
OUTGOING OUTGOING OUTGOING OUTGOING OUTGOING OUTGOING

D D

-F
FAN

E E

N1
N
E

REVISION POWER WIRING DIAGRAM OF


FOR APPROVAL DESCRIPTION DESIGN BY S.M DRAWN DATE 16-05-2025
MOTOR CONTROL CENTER (MOTORIZED BALL VALVES) FOR PS-1
REV. DATE DESCRIPTION OF MODIFICATION BY
CHECKED BY N/A
F 01 13-06-25 DRAWING IS REVISED AS PER CLIENT REQUIERMIENTS M.R CLIENT DESCON ENGINEERING SCALE N.T.S F
FOR MANUFACTURING PROJECT SCHNEIDER ELECTRIC RE CHECKED BY M.R QTY

PROJECT NO GTD-586261124-REV02
APPROVED BY S.A SHEET NO 03 OF 03
DRAWING NO SEWD1-586261124
AS BUILT REV NO 00
MO NUMBER MO-N/A

1 2 3 4 5 6 7 8