0% found this document useful (0 votes)
35 views6 pages

Asurari Estimate

The document outlines the budgetary estimate for the construction of a B-Site Retail Outlet (RO) in Bhadrak, detailing material and construction costs, including various installations and electrification work. It includes a summary of costs, contingencies, consultancy fees, and applicable taxes, leading to a grand total of approximately 59.34 lakhs. The estimate is based on zonal rates and includes specific service numbers and descriptions for each item involved in the project.

Uploaded by

phani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views6 pages

Asurari Estimate

The document outlines the budgetary estimate for the construction of a B-Site Retail Outlet (RO) in Bhadrak, detailing material and construction costs, including various installations and electrification work. It includes a summary of costs, contingencies, consultancy fees, and applicable taxes, leading to a grand total of approximately 59.34 lakhs. The estimate is based on zonal rates and includes specific service numbers and descriptions for each item involved in the project.

Uploaded by

phani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

INDIAN OIL CORPORATION LTD (M.

D)
BHUBANESWAR DIVISIONAL OFFICE
BUDGETARY ESTIMATE
SUB. : BUDGETARY ESTIMATE FOR CONSTRUCTION OF B-SITE RO AT LOCATION: WITHIN 6 km FROM INTERSECTION OF NH-1
TOWARD ASURARI, DIST.- BHADRAK" under BBSRDO
REF: BBSRDO/ENGG/ASURARI
S.No. SERV. NO. SERV. NO. Description of Item
A) MATERIAL COST
1 SAP VALUE 20 KL TANK
2 SAP VALUE DUO PUMP
3 SAP VALUE MULTI PRODUCT PUMP
4 SAP VALUE STP 0.75 HP/1.5 HP
MATERIAL COST

B CONSTRUCTION COST
S.No. SERV. NO. SERV. NO. Description of Item

1 INSTALLATION OF TANKS IN RCC UNDER DRIVEWAY & DUS WITH FLEXIBL

1 MPLCN00501 1005A EXC. OVER AREAS IN ALL KINDS OF SOIL


2 MPLCN00701 1007A EXC. IN ALL KINDS OF SOIL
3 MPLCN02001 1020A SUPPLY FILLING LOCAL SAND ZONE IV
4 MPLCN03002 1030B PRE-CAST CC 1 :3 :6 WITH C&S
5 MPLCN02901 1029A CENT.& SHUT.FOR PCC-FOUND,FOOTING ETC
6 MPLCN03602 1036B RCC 1:1½:3 UP TO PLINTH LEVEL W/O C&S
7 MPLCN04302 1043B TMT BARS FE- 500 GRADE
8 MPLCN12500 1125 STR.STEEL IN BUILT UP SECTION
9 MPLCN05101 1051A BRICK WORK IN CM 1:4 IN FOUNDN & PLINTH
10 MPLCN18901 1189A 12MM CEMENT PLASTER,1:4 WITH FINE SAND
11 MPLCN06404 1064D POLISHED GRANITE - KITCH.CUNTR>0.50SM
12 MPLMN00304 2003D 20KL TANK IN BM PIT, RCC MAT RAFT U/D
13 MPLMN00802 2008B S/L U/G MS WELDED 80 MM DIA PIPE
14 MPLMN00803 2008C S/L U/G MS WELDED 50 MM DIA PIPE
15 MPLMN00804 2008D S/L U/G MS WELDED 40 MM DIA PIPE
16 MPLMN00904 2009D S/L A/G MS WELDED 40 MM DIA PIPE
17 MPLMN03603 2036C S/I SCREWED GM BALL VALVE 50MM DIA
18 MPLMN02803 2028C S/I U TYPE 40MM CS BEND ON VENT PIPES
19 MPLMN06900 2069 S/F 2" PV VALVES
20 MPLMN05303 2053C TRANSPTN OF 15/20 KL TANK : 0 - 30 KM
21 MPLMN05304 2053D TPT/KM OF 15/20KL TANK: EXTRA > 30KM
22 MPLMN05311 2053K TPT - MPD/MPP:1-2, <30KM
23 MPLMN05312 2053L TPT/KM - MPD/MPP:1-2, >30KM
24 MPLMN07100 2071 INSTALLATION OF STP
25 MPLMN04701 2047A 2 PRODUCT - 4 NOZZLE MPP/MPD
26 MPLCN52000 1520 S/L OF 50 MM DIA SINGLE WALL FLEXIBLE PI
2 CONSTRUCTION OF 1 NO. FRONTLIT HOARDING ( 6 X 3 M) - sing
1 MPLCN13101 1131A HOT FINISHED WELDED TYPE TUBULAR TRUSS
2 MPLCN00501 1005A EXC. OVER AREAS IN ALL KINDS OF SOIL
3 MPLCN02708 1027H 1 CEMENT:4 COARSE SAND:8 AGG. 40MM
4 MPLCN03602 1036B RCC 1:1½:3 UP TO PLINTH LEVEL W/O C&S
5 MPLCN02901 1029A CENT.& SHUT.FOR PCC-FOUND,FOOTING ETC
6 MPLEN00104 3001D S&L 3X2.5 SQMM,1.1KV FRLS CU ARMD CABLE
7 MPLEN00507 3005G CABLE TERM, FLP DC GLAND 3X2.5SQMM
8 MPLEN04301 3043A S&F MCB+ELCB UPTO 32A SP MCB
9 MPLEN01701 3017A FLP JB FOR CABLES 2.5 TO 4SQMM XLPE/AYFY
10 MPLCN04302 1043B TMT BARS FE- 500 GRADE
11 MPLEN07900 3079 HOARDING LIGHTS:30W WITH IP65 PROTECTION

3 ELECTRIFICATION OF DISPENSING UNIT & GRID EARTHING


1 MPLEN00103 3001C S&L 3X1.5 SQMM,1.1KV XLPE CU ARMD CABLES
2 MPLEN00104 3001D S&L 3X2.5 SQMM,1.1KV FRLS CU ARMD CABLE
3 MPLEN00501 3005A CABLE TERM,NON FLP DC GLAND 3X1.5SQMM
4 MPLEN00502 3005B CABLE TERM,NON FLP DC GLAND 3X2.5SQMM

CHEMICAL EARTHING: ii) Current Capacity:15kA Primary


Conductor(Inner pipe dia-20NB; Electrode Outer Pipe Dia-
5 MPLEN02702 3027B 40NB Length of Concentric Pipes:3M
6 MPLEN02401 3024A EARTHING WITH 50 X 10MM G.I. STRIP
7 MPLEN02402 3024B EARTHING WITH 32 X 6 MM G.I.STRIP
8 MPLEN02500 3025 16SQMM CUCABLE INCL.CROCDILCLIPIN LT PNL
9 MPLEN09101 3091A PROV. DISP. PUMP LIGHTING CONNECTION
10 MPLEN09102 3091B PROV. DISP. PUMP POWER CONNECTION
11 MPLEN06903 3069C S/I SINGLE PAHSE AIRCOOLED 500VA CVT
12 MPLEN07004 22180 S/I SINGLE PHASE SERVO STABILISER-5 KVA
13 MPLEN06100 3061 S/Installation of Flame Proof ESD Push Botton
14 MPLCN17302 1173B ii) 110 mm diameter

4 MONOLITH
1 C.NO. 12029126 Monolith With Indianoil Logo And lettering only
2 C.NO. 12029126 Foundation of Monolith for Highway ROs

5 HIGHMAST (22M INLAND)

6 AUTOMATION WORK FOR RO


1 AUTOMATION WORK FOR RO
SUMMARY OF COSTS :
A TOTAL OF MATERIAL COST (A)
B CONSTRUCTION COSTS
1 INSTALLATION OF TANKS & MPDS
2 CONSTRUCTION OF 1 NO. FRONTLIT HOARDING (6 X 3 M)- SINGLE SIDED
3 ELECTRIFICATION OF DISPENSING UNIT & GRID EARTHING
4 MONOLITH
5 HIGHMAST (22M INLAND)
6 AUTOMATION WORK FOR RO

TOTAL CONSTRUCTION COSTS (B)

7 ADD: CONTINGENCIES @ 5% ON TOTAL CONSTRUCTION COST (B)


8 ADD: CONSULTANCY @ 1.0% ON TOTAL CONSTRUCTION COST (B)
9 GST 18 %
TOTAL CONSTRUCTION COSTS INCLUDING TAX
GRAND TOTAL (A+B+7+8+9)

NOTE:
1 ESTIMATE HAS BEEN PREPARED BSED ON ZONAL RATES AS PER THE CONCEPT NOTE, REF. NO. BBSR DO/SRMP/135 DATED 10/0
2 NON CAPEX ITEMS HAS BEEN TAKEN AS PER HO RATE CONTRACT/REFERENCE SAP P.O.
LTD (M.D)

TE
m FROM INTERSECTION OF NH-16 SERVICE ROAD&SH -35 ON SH-35

DATE: 6/30/2025
Quantity UNIT Rate Amount(Rs)

2 NO. 260000.00 520000.00


0 NO. 200000.00 0.00
2 NO. 200000.00 400000.00
2 NO. 80000.00 160000.00
1,080,000.00

Quantity Unit Rate Amount(Rs)

RIVEWAY & DUS WITH FLEXIBLE PIPING SYSTEM

20 M3 181.55 3631
20 M3 251.88 5037.6
20 M3 1515.69 30313.8
2 M3 7581.93 15163.86
20 M2 284.38 5687.6
4 M3 7705.51 30822.04
200 KG 83.36 16672
800 KG 101.58 81264
10 M3 6365.72 63657.2
100 M2 266.41 26641
20 M2 4001.03 80020.6
2 LS 645334.98 1290669.96
30 M 1398.84 41965.2
5 M 906.79 4533.95
50 M 733.47 36673.5
12 M 409.32 4911.84
2 EA 3730.98 7461.96
4 EA 722.79 2891.16
1 EA 6810.22 6810.22
2 LS 8596.25 17192.5
300 KM 66.13 19839
1 LS 5036.08 5036.08
150 KM 26.45 3967.5
2 EA 1731.1 3462.2
2 EA 12979.07 25958.14
130 M 3325.75 432347.5
SUB-TOTAL (1) 2,262,631.41

TLIT HOARDING ( 6 X 3 M) - single sided


2000 KG 143.21 286420
2.5 M3 181.55 453.875
0.5 M3 5780.05 2890.025
5 M3 7705.51 38527.55
40 M2 284.38 11375.2
110 M 111.35 12248.5
8 EA 364.85 2918.8
2 EA 206.97 413.94
2 EA 1660.4 3320.8
100 KG 83.36 8336
5 EA 2777.25 13886.25
SUB TOTAL (2) 380,790.94

ENSING UNIT & GRID EARTHING


50 M 100.94 5047.00
350 M 111.35 38972.50
10 EA 350.01 3500.10
10 EA 364.85 3648.50

2 EA 21424.88 42849.76
180 M 405.71 73027.80
100 M 154.99 15499.00
2 EA 1680.16 3360.32
2 EA 3271.26 6542.52
2 EA 2180.84 4361.68
2 EA 6418.43 12836.86
2 EA 15461.35 30922.70
2 EA 2361.08 4722.16
100 M 304.54 30454.00
SUB-TOTAL (3) 275,744.90

ONOLITH
1 EA 537500.00 537500.00
1 EA 74085.52 74085.52
SUB-TOTAL (4) 611585.52
T (22M INLAND)
SUB-TOTAL (5) 0.00
ON WORK FOR RO
1 LS 350000.00 350000.00
1080000.00

2,262,631.41
E SIDED 380,790.94
275,744.90
611585.52
0.00
350,000.00

3880752.77

194,037.64
38,807.53
740,447.63
4,854,045.56
5,934,045.56

SAY (IN Rs LACS) 59.34 LACS