0% found this document useful (0 votes)
11 views1 page

Backfill and Compaction

The document is a checklist for the septic tank project at Waad Al Shimal, managed by Consolidated Consultant Group and constructed by Saudi Zaas Construction Company. It outlines various checks related to earthworks, including excavation, backfilling, and compaction, with a status section for acceptance. The checklist ensures compliance with approved drawings, safety measures, and proper execution of construction activities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

Backfill and Compaction

The document is a checklist for the septic tank project at Waad Al Shimal, managed by Consolidated Consultant Group and constructed by Saudi Zaas Construction Company. It outlines various checks related to earthworks, including excavation, backfilling, and compaction, with a status section for acceptance. The checklist ensures compliance with approved drawings, safety measures, and proper execution of construction activities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CHECK LIST

CLIENT MODON
Project Name septic tank at waad al shimal
PMC CONSOLIDATED CONSULTANT GROUP (CCG)

Contractor SAUDI ZAAS CONSTRUCTION COMPANY

WAS1-01-043-SZC-TS9-1-QUM-ITP-
Related ITP
0001_00
EARTH WORK ( EXCAVATION &
Checklist Title:
BACKFILLING/COMPACTION)
WAS1-01-043-SZC-TS9-1-QUM-MST-
Related MST
0001_00

WAS1-01-043-SZC-TS9-1-CVL-FIR-
READY BUILT FACTORIES AND SUPPORT UNITS Related FIR
Works Location: 0009-00

Status - Acceptable
SN Description of checking to be carried out Remarks
Yes No NA
Approved Shop Drawings,Material Submittals,Method Statement obtained from
1 Employer/Engineer.
Materials to be use are Approved by Employer/Engineer as per Requirements and /
2 or MIR.

3 Approved Mock-Up and Trial Area ,IF Required by Employer/Engineer

4 Has the site survey conducted for the designated area


5 Are the undergroud utilities identified and protected
6 Has the excavation Permit issued prior to the start of the activity.
7 Is the excavation done as per the levels approved.
8 Is the excavation done as per the coordinates mentioned in the Drawings.
9 Has the debris and rubbish material carted away.
10 Are safety measures and precautions implemented.
Backfilling / Compaction
12 Is the backfilling area cleaned properly.

13 Is the Compaction done properly Layer by layer - 200 mm thick.

15 fill shall be compacted at least 95% MDD

16 Is the compaction test taken.

17 compaction test shall be taken 1 point each 50m2 area

Remarks:

For Contractor For Supervision Consultant (PMC)

Name Aleem Akhtar


Designation QA/QC Engineer
Signature
Date