Inspection Report

The inspection report details the review of 61 RT films for the annular and shell plates of a tank, conducted by Bureau Veritas for AESCO. The results indicated that 53 films were acceptable, with one requiring repair and seven needing reshoots, while concerns were raised about welders not cleaning between passes. Non-conformities and punch list items were noted, and the report includes references to relevant standards and documentation.

Uploaded by

Bestun Ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views3 pages

Inspection Report

The inspection report details the review of 61 RT films for the annular and shell plates of a tank, conducted by Bureau Veritas for AESCO. The results indicated that 53 films were acceptable, with one requiring repair and seven needing reshoots, while concerns were raised about welders not cleaning between passes. Non-conformities and punch list items were noted, and the report includes references to relevant standards and documentation.

Uploaded by

Bestun Ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Industry & Facilities Division

Third Party Inspection Report Page 1 of 3

INSPECTION REPORT Nr: IND- 20859161-IR-BA-24-01 Revision Nr 0


Initial Interim Final Resident
Inspection requested by: AESCO
Inspection performed as Recognised Authority: Yes, :(Recognition) No
BV Job Nr: 7541592

Project: General Company for Steel Industries IPO Ref (If applicable): N/A
BV Client: AESCO P/O Nr:
Manufacturer/Vendor: N/A N/A
End User: N/A N/A
Inspection Location: Erbil Previous Inspection : N/A
Inspection performed on: RT film review Tank weld Next Inspection: As per Client Request

MATERIAL / SUBJECT OF INSPECTION


QTY
Refer to attachment section J instead. QTY
ITEMS S/N Offered for
(Indicate if separate material list is provided in As per P/O
inspection
attachment)
RT film review performed for annular plate and N/A 61 films
61
shell plate of the tank reviewed

A – INSPECTION RESULT

Satisfactory Satisfactory with comments Not Satisfactory


(Without comments) (Any of trailing Punch or Non-Conformity (NCR raised during the
items is still open) inspection)

Inspection Summary: (for details refer to section E)

➢ At the time of inspection and as per request from AESCO we 61 Films have been reviewed for annular
and shell plate as per API 650 acceptant Criteria last revision, we found the result as per the attached
report

Open Non Conformities: Yes, details in section G No


Open Punch List Items: Yes, details in section H No
Release Note Issued: Yes, number(s): (Release Note number) No
BV Stamping: Yes, Yes, No

On behalf of Bureau Veritas On behalf of Bureau Veritas


BV Inspectors: BV Coordinator:
Bestoon Ahmed Mohammed
BV Office: Inspection Report Date:
Distribution: Attachments Report:
CLIENT BV MANUFACTURER Yes, details in section J No
OTHER: …………………………..
Industry & Facilities Division
Third Party Inspection Report
Page 2 of 3

INSPECTION REPORT Nr: IND- 20859161-IR-BA-24-01 Revision Nr 0

B - REFERENCE DOCUMENTATION:
Refer to attachment section J instead
(Indicate if separate document list is provided in attachment)
Approval
Title Reference n° Rev. Approved by Date
status
As per API 650 API 650 1 API API 2024

C – ATTENDEES
Name Position Representing
Bestoon Ahmed Mohammed QC inspector BV
Mr. Saddam Hasan QC supervisor AESCO

D - MEASURING & TESTING EQUIPMENT USED


Refer to attachment section J instead.
(Indicate if separate equipment list is provided in attachment)
Equipment Type Equipment Identity n° Last Calibration Date Expiry Date
Viewer 07-1250 23-9-2024 Annual
Densitometer 435912 2-7-2024 Annual

E - INSPECTION DETAILS

Description of the inspections carried out:

➢ Manufacturing Progress Status:


RT film reviewed for Tanks welds for annular plate and shell vertical and horizontal welds,evaluation made
according to ASME section VIII

➢ Details of inspection activities carried out with reference to ITP: (Each activity elaborated in detail)
Inspection performed for RT films, all acceptable welds reported, and Repair welds marked for repair in accordance
with ASME section VIII, AESCO report is updated and sent in separate document.

➢ Confirmation of Certificates review: (including endorsed test certificates and validity of operators certificates
as per scope of work)
Required certificate for RT film review in NDT level II, certs available with BV technical team.

➢ Results of Inspection steps:


During RT film review found 53 films acceptable, 1 repair, and 7 reshoots

➢ Activities not offered for inspection: N/A

➢ Problems pending / Areas of Concern:

During inspection found welders are not cleaning client should be aware on this, that the welders are not cleaning
welds between passes, and excessive external under cut noted on the film, TBT required for welder to follow
approved WPS and client welding specification.
During RT shooting overlap shall be calculated to ensure all areas are shotted for evaluation.

GM-SI-101 INSP002-En Version 5.0 Copyright Bureau Veritas 05/2017


Industry & Facilities Division
Third Party Inspection Report
Page 3 of 3

INSPECTION REPORT Nr: Revision Nr 0

F – HEALTH, SAFETY & ENVIRONMENT COMMENTS


(Comment on Observations and Actions Taken During the Inspection)

G- NON-CONFORMITIES
Refer to attachment section J instead
(Indicate if separate punch list is provided in attachment)
Report Report
Item Description Status Raised on Closed on Comments
Nr. Nr.

H – PUNCH LIST ITEMS


Refer to attachment section J instead
(Indicate if separate punch list is provided in attachment)
Report Report
Item Description Status Raised on Closed on Comments
Nr. Nr.

N/A

I - DIGITAL PICTURES

J – ATTACHMENTS

Item Attachment Name Total Pages Description

01. Stamped reports 4 Sent in separate document

END OF REPORT

GM-SI-101 INSP002-En Version 5.0 Copyright Bureau Veritas 05/2017

You might also like