Industry & Facilities Division
Third Party Inspection Report                                                                        Page 1 of 3
INSPECTION REPORT Nr: IND- 20859161-IR-BA-24-01                                                        Revision Nr 0
   Initial    Interim    Final    Resident
Inspection requested by: AESCO
Inspection performed as Recognised Authority:                         Yes, :(Recognition)                   No
BV Job Nr: 7541592
Project: General Company for Steel Industries                           IPO Ref (If applicable): N/A
BV Client: AESCO                                                        P/O Nr:
Manufacturer/Vendor: N/A                                                N/A
End User: N/A                                                           N/A
Inspection Location: Erbil                                              Previous Inspection : N/A
Inspection performed on: RT film review Tank weld                       Next Inspection: As per Client Request
  MATERIAL / SUBJECT OF INSPECTION
                                                                                                              QTY
        Refer to attachment section J instead.                                                   QTY
                                                                    ITEMS S/N                                 Offered for
   (Indicate if separate material list is provided in                                            As per P/O
                                                                                                              inspection
                     attachment)
RT film review performed for annular plate and                           N/A                                      61 films
                                                                                                    61
shell plate of the tank                                                                                          reviewed
A – INSPECTION RESULT
     Satisfactory                   Satisfactory with comments                          Not Satisfactory
(Without comments)              (Any of trailing Punch or Non-Conformity              (NCR raised during the
                                items is still open)                                  inspection)
Inspection Summary: (for details refer to section E)
         ➢    At the time of inspection and as per request from AESCO we 61 Films have been reviewed for annular
              and shell plate as per API 650 acceptant Criteria last revision, we found the result as per the attached
              report
Open Non Conformities:               Yes, details in section G                              No
Open Punch List Items:               Yes, details in section H                              No
Release Note Issued:                 Yes, number(s): (Release Note number)                  No
BV Stamping:                         Yes,                Yes,                               No
On behalf of Bureau Veritas                                     On behalf of Bureau Veritas
BV Inspectors:                                                  BV Coordinator:
Bestoon Ahmed Mohammed
BV Office:                                                      Inspection Report Date:
Distribution:                                                   Attachments Report:
    CLIENT   BV   MANUFACTURER                                      Yes, details in section J          No
    OTHER: …………………………..
Industry & Facilities Division
Third Party Inspection Report
                                                                                                       Page 2 of 3
  INSPECTION REPORT Nr: IND- 20859161-IR-BA-24-01                                                      Revision Nr 0
 B - REFERENCE DOCUMENTATION:
                                                                              Refer to attachment section J instead
                                                        (Indicate if separate document list is provided in attachment)
                                                                       Approval
               Title                       Reference n°      Rev.                    Approved by            Date
                                                                        status
           As per API 650                    API 650           1          API             API               2024
 C – ATTENDEES
Name                                      Position                                      Representing
Bestoon Ahmed Mohammed                    QC inspector                                  BV
Mr. Saddam Hasan                          QC supervisor                                 AESCO
D - MEASURING & TESTING EQUIPMENT USED
    Refer to attachment section J instead.
(Indicate if separate equipment list is provided in attachment)
Equipment Type                             Equipment Identity n°          Last Calibration Date           Expiry Date
                 Viewer                                07-1250                    23-9-2024                    Annual
              Densitometer                             435912                      2-7-2024                    Annual
E - INSPECTION DETAILS
Description of the inspections carried out:
➢    Manufacturing Progress Status:
    RT film reviewed for Tanks welds for annular plate and shell vertical and horizontal welds,evaluation made
    according to ASME section VIII
➢   Details of inspection activities carried out with reference to ITP: (Each activity elaborated in detail)
    Inspection performed for RT films, all acceptable welds reported, and Repair welds marked for repair in accordance
    with ASME section VIII, AESCO report is updated and sent in separate document.
➢   Confirmation of Certificates review: (including endorsed test certificates and validity of operators certificates
    as per scope of work)
    Required certificate for RT film review in NDT level II, certs available with BV technical team.
➢ Results of Inspection steps:
        During RT film review found 53 films acceptable, 1 repair, and 7 reshoots
➢ Activities not offered for inspection: N/A
➢ Problems pending / Areas of Concern:
    During inspection found welders are not cleaning client should be aware on this, that the welders are not cleaning
    welds between passes, and excessive external under cut noted on the film, TBT required for welder to follow
    approved WPS and client welding specification.
    During RT shooting overlap shall be calculated to ensure all areas are shotted for evaluation.
 GM-SI-101 INSP002-En       Version 5.0                                                Copyright Bureau Veritas 05/2017
Industry & Facilities Division
Third Party Inspection Report
                                                                                             Page 3 of 3
 INSPECTION REPORT Nr:                                                                         Revision Nr 0
F – HEALTH, SAFETY & ENVIRONMENT COMMENTS
(Comment on Observations and Actions Taken During the Inspection)
 G- NON-CONFORMITIES
     Refer to attachment section J instead
 (Indicate if separate punch list is provided in attachment)
                                                                Report                  Report
 Item    Description                   Status    Raised on                 Closed on               Comments
                                                                Nr.                     Nr.
 H – PUNCH LIST ITEMS
     Refer to attachment section J instead
 (Indicate if separate punch list is provided in attachment)
                                                                Report                  Report
 Item   Description                    Status    Raised on                 Closed on               Comments
                                                                Nr.                     Nr.
                                                          N/A
I - DIGITAL PICTURES
J – ATTACHMENTS
Item    Attachment Name                Total Pages    Description
01.     Stamped reports                    4          Sent in separate document
                                                     END OF REPORT