0% found this document useful (0 votes)
17 views2 pages

Add Details

The document provides detailed measurements for PCC and RCC components, including dimensions and total cubic meters for various items. It includes specific quantities and calculations for different types of structures such as trenches, beams, and pedestals. The total volume for the RCC measurements is noted as 245.183 m3.

Uploaded by

mevallabh2810
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views2 pages

Add Details

The document provides detailed measurements for PCC and RCC components, including dimensions and total cubic meters for various items. It includes specific quantities and calculations for different types of structures such as trenches, beams, and pedestals. The total volume for the RCC measurements is noted as 245.183 m3.

Uploaded by

mevallabh2810
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PCC Measurement PCC (Cubic

Sr. No. Item Nos. m3 Per 1 Total (m3)


Length Width Hieght Nos.)

1 LA 9 1.45 1.45 0.1 0.210 1.892


2 PI 6 1.45 1.45 0.1 0.210 1.262
3 CT 12 1.55 1.40 0.1 0.217 2.604
4 PT 6 1.55 1.40 0.1 0.217 1.302
5 BPT 3 1.55 1.40 0.1 0.217 0.651
6 CL 6 2.10 2.10 0.1 0.441 2.646
7 ISO 12 2.05 1.15 0.1 0.236 2.829
8 SF6 BRK 3 1.45 2.75 0.1 0.399 1.196
9 AUXI. 2 2.32 2.32 0.1 0.538 1.076
10 C1 18 1.50 1.50 0.1 0.225 4.050
11 C2 3 1.65 1.65 0.1 0.272 0.817
12 600MM TRENCH 1 1.40 40.55 0.1 5.677 5.677
13 1600MM TRENCH 1 2.45 21.64 0.1 5.302 5.302

RCC Measurement RCC Slab


3
Sub Total
Sr. No. Item Nos. (Cubic m3 Total (m )
Length Width Hieght (m3)
Per 1 Nos.)

1 LA 9 1.30 1.30 0.3 0.507 4.563 12.409


2 PI 6 1.30 1.30 0.3 0.507 3.042 8.126
3 CT 12 1.40 1.25 0.3 0.525 6.300 17.328
4 PT 6 1.40 1.25 0.3 0.525 3.150 8.664
5 BPT 3 1.40 1.25 3.0 5.250 15.750 18.507
6 CL 6 1.95 1.95 0.3 1.141 6.845 24.253
7 ISO 12 1.90 1.00 0.3 0.570 6.840 17.324
8 SF6 BRK 3 NA NA NA NA NA 18.746
9 AUXI. 2 NA NA NA NA NA 26.505
10 C1 18 1.35 1.35 0.3 0.547 9.842 16.322
11 C2 3 1.50 1.50 0.3 0.675 2.025 3.247
12 600MM TRENCH 1 1.20 40.55 0.3 14.598 14.598 32.440
13 1600MM TRENCH 1 2.30 21.64 0.3 14.932 14.932 37.545
14 C1 BEAM 16 2.30 0.30 0.15 0.104 1.656 1.656
(1,2,5 TO 8, 11, 12)

15 C1 BEAM 8 2.30 0.30 0.30 0.207 1.656 1.656


(3,9,4,10)
16 C2 BEAM 2 3.31 0.23 0.30 0.228 0.457 0.457
TOTAL 245.183

RCC Measurement RCC


Pedestal
Sr. No. Item Nos. Total (m3)
Length Width Hieght (Cubic m3
Per 1 Nos.)

1 LA 9 0.70 0.70 1.35 0.662 5.954


2 PI 6 0.70 0.70 1.30 0.637 3.822
3 CT 12 0.65 0.80 1.35 0.702 8.424
4 PT 6 0.65 0.80 1.35 0.702 4.212
5 BPT 3 0.65 0.80 1.35 0.702 2.106
6 CL 6 1.35 1.35 1.35 2.460 14.762
7 ISO 12 1.35 0.35 1.35 0.638 7.655
8 SF6 BRK 3 1.25 2.60 1.80 5.850 17.550
9 AUXI. 2 2.17 2.17 2.70 12.714 25.428
10 C1 18 0.30 0.30 1.50 0.135 2.430
11 C2 3 0.30 0.30 1.50 0.135 0.405
12 600MM TRENCH 1 0.30 40.55 1.00 12.165 12.165
13 1600MM TRENCH 1 0.40 21.64 2.00 17.312 17.312