RISK ASSESSMENT
PROJECT:                                         SITE:                                                                              Ref No:                                    Sl No :
JOB UNDER RISK ASSESSMENT:                       PAINTING WORKS AT SITE                                                             DATE OF ASSESSMENT:
NAME & POSITION OF THE
ASSESSOR:
                                                                                          INITIAL RISK                                                                           FINAL RISK                                  REMARK
                                                                                            RATING                                                                                 RATING                                       S
                                                     EXISTING
                                                CONTROL MEASURES &
                                   PERSO         WHEHER THE RISK IS
IDENTIFIED        HAZARD
                                                                                                       LIKELI HOOD
                                                                                                                                                                                                   LIKELI HOOD
                                   N(S) AT          ACCEPTABLE
                                                                                                                     RISK RATE
                                                                                                                                                                                                                 RISK RATE
                                                                                                                                      CONTROL MEASURES ADDED
                                                                                            SEVERITY
                                                                                                                                                                                        SEVERITY
                                                                                 NUMBER
                                                                                                                                                                               NUMBER
  HAZARD          EFFECT            RISK
(Painting        Body contact         1                                          1           5         10            50           Strict supervisory control ensured          1         5         1              5          Risk is
work)            while handling               Take special care while                                                            MSDS to be referred\                                                                      accepta
Mixing the                                     mixing of paints;                                                                  Store all chemical in the temporary                                                       ble
paints , Toxic   Skin Disease,                avoid contact with skin;                                                            chemical storage area provided
gases,           irritation,                  wear PVC or rubber hand                                                            No naked flames should be used near
Asbestos         Dermatitis,                   gloves and coverall                                                                 the painting area
                 Eye irritation.              Use safety goggles to avoid                                                        No hot work shall be performed near to
Asbestos,                                      the paint contact with eyes.                                                        the painting activity
silica ,fumes,                                Also Paints must be handled                                                        Ensure nearby working workers also
cement, mists                                  properly to avoid any splash.                                                       wearing the Nose mask
and Dust of      Vapor                        Ensure local Exhaust                                                               TBT shall be conducted prior to start the
Materials,       inhalation                    Ventilation/General ventilation                                                     work and discuss RA/ Method statement
Spillage of                                    prior to start of the painting                                                      points with involved personnel
Paints           Asphyxiation,                 job.                                                                               Fire Extinguisher shall be located near
Continuous       Intoxication,                While painting always wear                                                          to the painting area
work in hot      acute and                     proper respirators (referred by                                                    Wash properly before consuming any
environment      chronic chest                 manufacturer’s instructions).                                                       food.
Poor work        pain,                        Refer MSDS (Material Safety                                                        Clean / dispose safely the paint soaked
posture          Dizziness,                    Data Sheet).                                                                        coverall / gloves.
                 Nausea,                      Display warning signs and
                 Slips, Fire,                  make others away from                                                              Ensure proper wind up & housekeeping
                 Environmenta                  inhaling the vapors.                                                                at worksite.
                 l hazards,                   Ensure proper segregation of
                 Dehydration/                  Empty and full drums of
                 heat stress                   paints
                 leading to                   Mixing must be carried out on
                 fainting.                     concrete floor or use of
                                               polythene sheet.
                                                                    RISK ASSESSMENT
                                                  Clear spillage if any
                                                   immediately.
                                                  Follow safe clean up and
                                                   disposal procedures.
                                                  Give sufficient rest in between
                                                   the painting job.
                                                  Change persons as and when
                                                   required.
                                                  Ensure Provision of proper
                                                   platform.
                                                  Do not eat or smoke wearing
                                                   a paint soaked disposal
                                                   coverall / gloves
                                                  Do not leave unattended the
                                                   Paint containers in site.
    Proper PPE should be provided to each and every worker (Safety shoes, helmet, safety glasses and hand
             gloves) and face shield, full body harness to all the workers while working at height.
    Proper Barrication/guarding is to be provided around work area.
    Proper illumination, ventilation and housekeeping is to be maintained at all time.
    First aid procedures are to be explained.
    Fire extinguisher and Emergency evacuation map to be displayed.
    Emergency contact no’s to be displayed.
    All the materials and tools to be stored in a proper place without affecting the access and egress.
Signature of the Assessors:
                                                                          Site Safety Officer
Site Manager:                                                                                                Review Date:
Sub-Contractor Site Manager:                                              Sub-Contractor Safety Officer: