Standard Bidding Documents 03
Standard Bidding Documents 03
SECTION -6
     FORM OF BID
(0
                                                         74                                                SBD
FORM OF BID
BID
To
Address
1,   We offerto execute the Works described above and remedy any defects therein in conformity with the
                                                                                                                    o
     conditions of Contract, specification, drawings, Bill of Quantities      and Addenda for the sum (s) of
2.   We undertake, 'ifour Bid is accepted,     to commence the Works as      soon as is reasonably possible after
     the   receipt of the Engineers     notiCe to   commence, and   to   complete the whole of the Works in the
                                                                                                                    o
     and it shall remain binding upon it and may be accepted at any time before the expiration of that
period.
4. Unless and until a formal Agreement is prepared and executed this Bid, together with your written
5. We understand that you are not bound to accept the lowest or any tender you may receive
Address
Witness
Address
 Occupation
        76           SBD
   SECTION -7
BILL OF QUANTITIES
                           O
Name of Work :- Pansora Bhalej Road Km 0/0 To 6/0. (Proposed Work: FDR, CC Road                                                         in Selected    Length,
                Resurfacing, Road Furnishing and other Miscellaneous works)
                                                          BILL                OF QUANTITIES
Memorandum Showing Items of works to be carried out                                            :
                       aggregate & asphalt in drum mix plant and hot laid                                              Four Only
                       process spreading the same by paver finisher &
                       consolidation with vibratory roller as per MORT&H
                       specification to    achieve desire density, including
                       providing all materials equipments, tools & plants, fire
                       wood, oil, kerosene, labour charges etc. complete using
                       contractor's own machinery drum mix plant & paver
                                                                                                                            Only
                       including    cost of all materials, equipments, tools, and
                       plants, fire wood, oil, kerosene, labour charges etc.
                       complete using contractor's own machineries drum mix
                       plant and paver finisher etc. complete.
 4.       3,525.00 Providing and laying compacted specified quarry spall                                     853.0?   Rupees Eight    Cum
                   in side shoulder, including carriage of material and                                                 hundred
                       spreading on prepared              base,     including compacting           as                  Fifty Three
 5.      10,184.00     Earthwork for embankment, including breaking clods,                                   132.37 Rupees One        Cum
                       dressing with all lead and lift, including watering and                                          hundred
                       consolidation etc. complete complete. (A) From borrow                                           Thirty Two
Seven Only
                                                                                     7   BOQ                                                               Page   1
       Quantities                                                                          Estimated Rates
                                                                                                                                Total Amount
Item   Estimated
                                          Description   of Item
                                                                                     In   Figures                      Unit      according to
 No.   but may be                                                                                      In Words
                                                                                     Rs.        Ps.                           estimated quantities
       more or less
 1.         2.                                     3.                                      4.              5.           6.             7.
 6.       1,921.00 Box cutting the road surface to proper slope and                          109.41 Rupees One         Cum
                   camber for making: a base for road work including                                   hundred
                      removing the excavaied
                                           stuff and depositing on the road                            Nine Paise
                      side slope as directed with all lead and lift.                                   Forty One
                                                                                                         Only
          1,537.00 Construction of 150 mm thick Granular sub base in                       1,251.33 Rupees One         Cum
                   required layer by providing coarse graded material                                  Thousand
                      Grading-I using B.T. M.C.- metal 53 mm to 26.5 mm at                            Two hundred
                      35%, aggregate 26.5 to 4.75 mm at 45% and stone dust                             Fifty One
                      at      (CBR more than 30%) as per Table 400-2 of                               Paise Thirty
 8.       1,153.00 Construction of dry lean cement concrete Sub-base                       3,048.07     Rupees         Cum
                   over a prepared sub-grade with coarse and fine                                       Three
                   aggregate conforming to IS: 383, the size of coarse                                 Thousand
                      aggregate not exceeding 25 mm, aggregate cement                                  Forty Eight
                                                                                                                                                     o
                      prepared sub base, with 53-grade cement or any other                              hundred
                      type as per Clause: 1501.2.2M-30 (Grade). Coarse and                             Ninety    Six
                                                                       7   BOQ                                                              Page 2
       Quantities                                                                                     Estimated Rates
                                                                                                                                        Total Amount
Item   Estimated
 No.   but may be                               Description of Item                               In Figures                   Unit       according to
                                                                                                                 In   Words           estimated quantities
       more   or less                                                                              Rs. Ps.
 1.        2.                                                  3.                                     4.               5.       6.
10.      3,240.00 Excavation for foundation upto 1.5 m depth including                                 198.77 Rupees One       Cum
                  sorting out and stacking of useful materials and
                                                                                                                  hundred
                  disposing off the excavated stuff with all lead and lift.                                     Ninety Eight
                        (A) Loose or soft       soil.                                                                 Paise
                                                                                                                  Seventy
                                                                                                                Seven Only
11.           270.00    Providing and      filling        in    foundation    with     ordinary      3,345.58      Rupees      Cum
                        cement concrete M-IOO mix and providing necessary                                          Three
                        vertical pin headers including formwork, vibrating                                       Thousand
                        ramming and curing etc. complete.                                                          Three
                                                                                                                  hundred
                                                                                                                 Forty Five
                                                                                                                 Paise Fifty
                                                                                                                 Eight Only
12.      1,500.00 Supplying and fixing reinforced concrete heavy duty non                            2,108.86 Rupees Two       Rmt
                  pressure pipes with collars for culverts, including setting                                    Thousand
                        and joining the pipes in C.M. 1:2 watering and laying (To                                     One
                        level of slops of IS: 458 / 1971) Class NP-3 casted by                                    hundred
                        vertically   vibrated     technology of 600           mm internal                        Eight Paise
                        diameter.                                                                                Eighty Six
Only
13.            50.00 Constructing Manhole with R.C.C. top slab in 1:2:4 mix                         23,470.48     Rupees       No
                     (1
                        cement : 2 coarse sand : 4 graded stone aggregate 20                                      Twenty
                     mm nominal size) foundation concrete 1B:6 mix (I                                              Three
                        cement : 3 coarse sand  : 6 brick bats 40 + 50 mm size)                                  Thousand
                        inside plastering 15 mm thick with cement mortar 1:5 (1                                       Four
                        cement : 5 coarse sand) finished with a floating coat of                                  hundred
                        neat cement and making channels in cement concrete                                        Seventy
                        1:2:4 mix (I
                                     cement : 2 coarse sand : 4 stone aggregate                                 Paise Forty
                        20    mm     nominal      size)        finished   smooth     complete                    Eight Only
                        including curing and testing (i) Inside size 900
                                                                          mm x
                        1200 mm and 1.5 M deep including 100 mm thick M-25
                        Precast SFRC perforated        with frame of 0.60
                                                          cover              x           cm
                        0.60 cm (A) with 230       thick walls of brick
                                                        mm              masonry
                        using brick having crushing strength not less than 35 Kg
                        /      in
                            Sqcm  cement mortar 1:5 (I cement : 5 coarse sand)
                        (3)C-type depth 2.25 Metre for 150 mm diameter
                        sewer.
14.           48.00     Providing and fixing Hectometre stone as per I.R.C. type                       356.50     Rupees       No             17,112.00
                        design including painting, lettering and fixing in C,C.                                    Three
                        1:5:10 etc. complete,                                                                    hundred
                                                                                                                  Fifty Six
                                                                                                                 Paise Fifty
                                                                                                                   Only
15.       320.00        Providing and fixing guard stone as per I.R.C, type                            350.80     Rupees       No
                        design including white washing and fixing in C.C. 1:5:10                                   Three
                        etc, complete.                                                                            hundred
                                                                                                                 Fifty Paise
                                                                                                                Eighty Only
                                                                             7   BOQ                                                              Page 3
       Quantities                                                                            Estimated Rates
                                                                                                                                 Total Amount
Item   Estimated
                                             Description of Item                       In Figures                      Unit       according to
 No.   but may be                                                                                        In
                                                                                       Rs.        Ps.         Words           estimated quantities
       more or less
 1.        2.                                        3.                                      4.                5.       6.             7.
16.             5.00 Providing and fixing Ordinary            Kilometer   Stone   of         1,293.38 Rupees One       No               6,466.90
                       precast C.C.        including necessary reinforcement as                          Thousand
                            I.R.C. type desigln and fixing in C.C. 1:4:8 including                      Two hundred
                       per
                       letter and paints etc. complete.                                                 Ninety Three
                                                                                                        Paise Thirty
                                                                                                         Eight Only
17.             1.00   Providing and fixing 5th Kilometer stone of precast C.C.              1,935.14 Rupees One       No               1,935.14
                               including necessary reinforcement as per I.R.C.                           Thousand
                       type design and fixing in C.C. 1:4:8, including painting,                              Nine
                       lettering etc. complete.                                                           hundred
                                                                                                         Thirty Five
                                                                                                              Paise
                                                                                                                                                     o
                                                                                                         Fourteen
                                                                                                           Only
18.         300.00     Providing and fixing Indicator stone of approved stone                 343.26      Rupees       No
                       as per I.R.C. type design in C.C. 1:4:8, including white                            Three
                       washing and fixing in C.C. 1:5:10 etc. complete.                                   hundred
                                                                                                        Forty Three
                                                                                                        Paise Twenty
                                                                                                          Six Only
19.       2,561.00 Road marking with hot applied thermoplastic paints                         367.72      Rupees       Sqm
                   with reflectorising glass beads
                                                   on bitumen
                                                              surface                                      Three
                   providing and laying a hot applied thermoplastic                                       hundred
                       compound 2.5 mm thick inciuding reflectorising glass                             Sixty Seven
                       beads @ 250 gms per sqm area, thickness of 2.5 mm is                                   Paise
20.         252.00     Providing and laying rumble strip road marking with                   1,176.65 Rupees One       Sqm
                       hot applied thermoplastic paints with reflectorizing glass                        Thousand
                       beads on bitumen surface by providing hot applied                                      One
                       thermoplastic    compound          8
                                                       mm thick including                                 hundred
                       reflectorizing glass beads @ 250 gms per Sqm area,                               Seventy Six
                       thickness of 8 mm iÅ excluding of surface applied glass                           Paise Sixty
                       beads as per IRC: 35-2015. The finished surface to be                             Five Only
                       level,uniform and free from streaks and holes etc.
                       complete.
                                                                     7   BOQ                                                                Page 4
       Quantities                                                                            Estimated Rates
Item   Estimated                                                                                                                Total Amount
                                                Description of Item                   In Figures                       Unit       according to
 No.   but may be                                                                                        In Words
                                                                                       Rs.        Ps.                         estimated quantities
       more or less
 1.         2.                                           3.                                  4.              5.         6.
21.       1,691.00 Cat Eye / Road Stud            /
                                                    Supplying of Molded Twin
                                                      RPM:                                    326.23      Rupees       No
                      Shanks     Raised    Pavement      Markers made of                                   Three
                      polycarbonate and ABS moulded body and reflective                                  hundred
                      panels with Micro prismatic lens (No Glass bead lens)                             Twenty Six
                      capable of providing total internal reflection of the light                       Paise Twenty
                      entering the lens face and shall support a load of 13635                          Three Only
                      kgs tested in accordance to ASTM D 4280 Type H and
                      complying to specifications of category-A of MORTH
                      Circular No RW/NH/33023/10-97 DO 111 Dt 11.06. 1997.
                                                               -
22.          50.00    Solar Stud: Supplying of Solar Raised Pavement                         2,088.68 Rupees Two       No            104,434.00
                      Markers made of polycarbonate molded body with                                   Thousand
                      circular shape, solar powered, LED self-illumination in                           Eighty Eight
                      active mode, 360-degree illumination and reflective                                Paise Sixty
                                                                         7   BOQ                                                           Page 5
       Quantities                                                                              Estimated Rates
                                                                                                                                  Total Amount
Item   Estimated
 No.
                                            Description of Item                         In Figures                       Unit       according to
       but may be                                                                                          In
                                                                                         Rs.        Ps.
                                                                                                                Words           estimated quantities
       more or less
 1.         2.                                        3.                                       4.                5.       6.             7.
23.          50.00    Providing and            Cautionary Warning sign boards                  5,07727 Rupees Five       No
                      made out Of     mm aluminium sheet / 4 mm ACP
                                        2                                                               Thousand
                      (Aluminium composite Panel); size 90 x 90 x 90 cm                                     Seventy
                      equilateral triangleas per design of IRC-67-2012. Pre-                              Seven Paise
                      treated with phosphating process
                                                           &
                                                         acid etching; coated                               Twenty
                      with one coat of epoxy primer and two coats of best                                 Seven Only
                      quality epoxy paint; refiectorized with Micro Prismatic
                      Grade retro reflective sheeting of Type-II as per ASTM
                      D-4956 and latest MOST specifications; 3.6 mtr long
                      stand post of 75 x 75 x 6 mm / 65NB circular MS pipe as
                      required and framejfabricated from suitable size iron
                      angle of 35 x 35 x 3 mm; painted with best quality epoxy
                      coatings in black and white bends. The details of symbol
                      foreach board shall be as per the instruction of Engineer
                      in-charge. The fixing at site shall be in 1:2:4 CC block of
                                                                                                                                                       o
                      size 45 x 45 x 60    for each leg, including excavation,
                                        cm
                      curing etc. complete under the supervision of Engineer-
24.          36.00    Providing and fixing Regulatory / Mandatory sign                         4,618.73 Rupees Four      No
                      boards made out of 2 mm aluminium sheet / 4 mm ACP                                  Thousand Six
                      (Aluminium composite Panel); size 60 cm dia circle as                                 hundred
                      per design of IRC-67-2012. Pre-treated with phosphating                               Eighteen
                      process & acid etching; coated with one coat of epoxy                                     Paise
                                                                   7
                                                                       BOQ                                                                    Page 6
       Quantities                                                                                 Estimated Rates
                                                                                                                                     Total Amount
Item   Estimated
                                             Description of Item                                                            Unit       according to
No.    but may be                                                                          In Figures
                                                                                                              In Words             estimated quantities
                 less                                                                       Rs.        Ps.
       more or
 1.        2.                                          3.                                         4.             5.          6.             7.
25.          10.00      Providing and fixing Facility Informatory sign boards                     5,906.48 Rupees Five      No              59,064.80
                        made out of 2 mm aluminium sheet / 4 mm ACP                                         Thousand
                        (Aluminium composite Panel); size 80 x 60 cm                                            Nine
                        rectangular    as per design of     IRC-67-2012. Pre-treated                         hundred Six
                        with phosphating process & acid etching; coated with                                 Paise Forty
                             coat of epoxy primer and two coats of best quality                              Eight Only
                        one
                                       reflectorized with Micro Prismatic Grade
                        epoxy paint;
                        retro reflective sheeting of Type-II as per ASTM D-4956
                        and    latest MOST Specifications;   3.6 mtr long   stand   post
                        of 75 x 75 x 6 mm / 65NB Circular MS pipe as required
 26.            10.00   Providing and fixing Stop sign boards made out of 2                       7,213.42     Rupees        No             72,134.20
                        mm    aluminium sheet
                                                 /  4
                                                       mm ACP (Aluminium                                        Seven
                        composite Panel); size 90 cm octagon as per design o                                  Thousand
                        IRC-67-2012.              with phosphating process &
                                         Pre-treated                                                         Two hundred
                        acid etching; coated with one coat of epoxy primer and                                 Thirteen
                        two coats of bestquality epoxy paint; reflectorized with                              Paise Forty
                                                                        7   BOQ                                                                   Page 7
       Quantities                                                                         Estimated Rates
                                                                                                                             Total Amount
Item   Estimated
                                         Description of Item                                                        Unit       according to
 No.   but may be                                                                   In   Figures       In Words
                                                                                    Rs.        Ps.
                                                                                                                           estimated quantities
       more or less
 1.         2.                                    3.                                      4.                 5.      6.             7.
27.          10.00    Providing and   xing Direction   (Junction) sign boards            26,572.09      Rupees      No
                      made out of 2 mm aluminium sheet / 4 mm ACP                                     Twenty Six
                      (Aluminium composite Panel); size 244 x 122 cms                                 Thousand
                      rectangular as per design of IRC-67-2012. Pre-treated                          Fivehundred
                      with phosphating process & acid etching; coated with                           Seventy Two
                      one coat of epoxy primer and two coats
                                                             of best quality                          Paise Nine
                      epoxy paint;
                                     reflectorized with Micro Prismatic Grade                               Only
                      retro reflective sheeting Of Type-II as per ASTM D-4956
                      and latest M.O.S.T. Specifications; 4.0 mtr long (2 Nos)
                      stand post of 75 x 7' x 6 mm / 65NB Circular MS pipe as
                      required and framet fabricated from suitable size iron
                      angle of 50 x 50 x 5 mm; painted with best quality epoxy
                      coatings in black and white bends. The details of symbol
                      foreach board shall be as per the instruction of Engineer
                      in-charge. The fixing at site shall be in 1:2:4 CC block of
                      size 45 x 45 x 60 cms for each leg, including excavation,
                      curing etc. complete under the supervision of Engineer-
                      in-charge. A warranty for IO-years for the Retro
                      reflective sheeting from original manufacturer & a
                      certified copy of 3-9earoutdoor exposure test report
                      from third party
                                       testllab for the product offered shall be
                                                                  7
                                                                      BOQ                                                                Page 8
       Quantities                                                                                      Estimated Rates
                                                                                                                                            Total Amount
Item   Estimated
                                                 Description     of Item                                                           Unit       according to
 No.   but may be                                                                               In Figures
                                                                                                                   In Words               estimated quantities
                 less                                                                            Rs.        Ps.
       more or
 1.        2.                                               3.                                         4.              5.           6.             7.
29.          20.00      Providing and fixing Village name / Bump Ahead Sign                            6,313.51   Rupees     Six
                                                                                                                                   No
                        boards made out of 2 mm aluminium sheet / 4 mm ACP                                         Thousand
                        (Aluminium composite Panel); size 90 x 60 cms                                                Three
                        rectangular     as per design of         IRC-67-2012. Pre-treated                           hundred
                        with phosphating process             &   acid etching; coated with                          Thirteen
                        one coat of epoxy primer and two coats of
                                                                   best quality                                    Paise Fifty
30.          20.00      Providing and        fixing   Hazard Marker Sign boards made                   3,666.30      Rupees         No             73,326.00
                        out of 1.5 mm aluminium sheet / 3 mm ACP                  (Aluminium                         Three
                        composite Panel); size 90 x 30 cms                 rectangular as per                     Thousand Six
                        design of IRC-67-2012. Pre-treated with phosphating                                         hundred
                        process & acid etching; coated with one coat of epoxy                                       Sixty Six
                        primer and two coats of best quality epoxy paint;                                          Paise Thirty
                        reflectorized with Micro Prismatic Grade retro reflective                                     Only
                        sheeting of  Type-II                 D-4956 and latest
                                                        as per ASTM
                        MOST Specifications; 1.8 mtr long stand post of 75 x 75
                        x 6 mm / 65NB circular MS pipe as required and frame
                        fabricated from suitable size iron angle of 35 x 35 x 3
                              painted with best quality epoxy coatings in black
                        mm;
                        and white bends. The details of symbol foreach board
                        Shail be as per the instruction of Engineer-in-charge.The
                                                                                7   BOQ                                                                 Page 9
       Quantities                                                                              Estimated Rates
                                                                                                                                  Total Amount
Item   Estimated
                                                Description    of Item                                                   Unit      according to
 No.   but may be                                                                        In   Figures      In Words
                                                                                         Rs.        Ps.                         estimated quantities
       more or less
 1.         2.                                            3.                                   4.             5.          6.
31.              8.00 Providing and fixing Route Marker sign boards made                       5,108.58 Rupees Five      No             40,868.64
                      out of 2.0 mm aluminium sheet / 4 mm ACP (Aluminum                                   Thousand
                      composite Panel); size 60 x 45 cm rectangular plus 30 x                                One
                      25 cm additional plate as per design of IRC-67-2012. Pre                             hundred
                      treated with phosphating process & acid etching; coated                             Eight Paise
                                      of                                                                  Fifty Eight
                      with
                            one coat     epoxy primer and two coats of best
                      quality epoxy paint; reflectorised with Micro Prismatic                                Only
                      Grade retro reflective sheeting of Type-II as per ASTM
                      D-4956    and    latest       Specifications; 3.6 mtr long
                                                M.O.S.T.
                      stand post of 75 x 75 x       6         circular MS pipe as
                                                         mm / 65NB
                      required   and
                                         frame!
                                             fabricated from suitable size iron
                                            mm; painted
                      angle  of 35   35 x 3              with best quality
                                   x                                       epoxy
                      coatings in black and white bends. The details of symbol
                      or inscription numerals for each board shall be as per
                                     /
32.         200.00    Providing and fixing Tree Guard sign board made out                        531.26   Rupees Five    No
                      of 2 mm    aluminium sheet / 3 mm ACP (Aluminium                                     hundred
                      composite Panel), size 30 cms diameter circle, pre-                                 Thirty One
                      treatedwith phosphating process and acid etching,                                   Paise Twenty
                                                                                                                                                       o
                      for the product offered shall be submitted by contractor.
                      (A) Class-C Type•ll Retro            Reflective sheeting.
                                                                         7   BOQ                                                           Page 10
          Quantities                                                                                  Estimated Rates
                                                                                                                                          Total Amount
Item      Estimated
                                               Description of Item                              In Figures                       Unit       according to
 No.      but may be                                                                                              In Words
                                                                                                Rs.        Ps.                          estimated quantities
         more   or less
 1.           2.                                            3.                                        4.              5.          6.             7.
33.              80.00    Providing and   fixing Chevron sign boards made out of                      4,681.35 Rupees Four        No
                          1.5    mm   aluminium sheet / 3 mm ACP (Aluminium                                      Thousand Six
                          composite Panel); size 60 x 50 cm as per design of IRC-                                  hundred
                          67-2012. Pre-treated with phosphating process & acid                                    Eighty One
                          etching; coated with one coat of epoxy primer and two                                  Paise Thirty
34.             400.00 Providing and erecting a Type-B, "THRIE" Metal Beam                            5,035.86 Rupees Five        Rmt
                       Crash Barrier comprising of 3 mm thick corrugated                                          Thousand
                          sheet metal beam rail, 85 cm above road / ground level,                                 Thirty Five
                          fixed on ISMC series channel vertical post, 150 x 75 x 5                                Paise Eighty
Total Cost :-
i.e., Rupees Six Crore Fifty Lakh Five thousand Five hundred Ninety Two Paise Seventy Only
                                                                              7                                                                       Page 11
                                                                                  BOQ
                                                               77                                                     SBD
                                      BILL OF QUALINTITIES
                                                         Preamble
            The bill of Quantities shall be read     in conjunction with the Instructions to       Bidder,   Conditions of
            Contract, Technical Specifications and      Drawings.
     5.    A rate or prices shall be entered against each item in the Bill    Quantitiestwhether quantities are stated
           or not. The    cost of Items against which   Contractor has failed to enter a rate or price shall be deemed
           to be covered by other rates and prices      entered in the Bill of Quantities (in case of Item rate contract).
     6.    The whole cost of complying with the provisions of the Contract shall be included in the items
           provided 'in the priced Bill of Quantities, and where no Items are provided the cost shall be deemed to
           be distributed among the rates and prices entered forthe related items ofWork.
           General direction and descriptions Of work and materials are not necessarily repeated or
           summarized in the Bill of Quantities. References to the relevant sections of the contract
           documentation      shall be. made before      entering rates or prices against each        item in the Bill of
           •Quantities.
     8.    The method of completed work of payment shall be jn accordance with the specification forRoad and
           Bridge works. For building works specifications for building are to be followed.
     9.    Errors will be corrected by the Employer for any arithmetic errors pursuant to Clause                 29   of the
           Instructions to Bidder.
     10.   Rock is defined as all materials Which, in the opinion of the Engineer, required blasting, orthe use of
           metal wedges and sledgehammers, or the use of compressed air drilling for its removatrand Which
           Cannot be extracted by ripping with a tractor of at least 150kw with a single rear mounted heavy duty
           ripper.
                                                                  78                                                       SBD
                                                   BILL OF QUANTITIES
(A)         Percentage Rate Tender (Up         to INR 50 Cr. )
Net Net
In words In words
             The Contractor shali exhibit a board with detailed specification anddetails ofwork as directed by
             the Engineer-ln-Charge forwhich no extra payment shall be made.
 2           The labour cess will be deducted as per prevailing rules i.e. ofthö work done.
 3           GST and Income tax TDSwill be deducted ata source while making payments of bills
 4            In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
              G. R: PRC-10/2017 Cement Consumption[16/C Daté:11/05/2017 as stated inS,OR. therefore in
             R.C.C. items where there is a change as per actual mix design the costof difference of cement
             consumption have been deducted from the rate of original item at the rate of input rate mentioned
             in all the tender.
            79               SBD
        SECTION -8
SECURITIES AND OTHER FORMS
                                                        80                                               SBD
and truly to 'be made to the said Employei the Bank itself, his successors and assigns by these presents.
SEALED with the Common Seal ofthe said Bank this day of 20
Form of Bid;
OR
(2) If the Bidder has been notified of the acceptance of his bid by the Employer during the period of Bid
Validity:
       A    Fails or refuses to execute the Form ofAgreement in accordance with the Instructions to Bidders,
            if required; or
       B.   Fails or refuse    to   furnish the Performance Security, in accordance with the Instructions to
            Bidders; or
       C.   does not accept the correction of the Bid Price pursuant to   Clause 27
            (Correction of Errors)
         We undertake to pay to the Employer up to the above amount upon receipt of his first written
      demand, without the employer having to substantiate his demand, provided that in his demand the
      Employerwill note that the amount claimed by him is due to him owing to the occurrenceof one or any
      ofthe three conditions, specifying the occurred conditions or conditions.
                                               81                                                 SBD
This Guarantee will remain in force up to and including the date days
after the deadline for submission of Bids as such the deadline is stated in the Instructions to Bidders or
as it may be extended by the Employer, notice of which extension (s) to the Bankis hereby waived,
Anydemand in respect ofthis guaranteeshould reach the Bank not laterthan the above date.
DATE SIGNATURE
WITNESS SEAL
        The Bidder should insert the amount of the guarantee in words änd figures denominated in
        Indian Rupees, This figure should be the same as shown in Clause 16.1 (Bid       Security) of the
    .
        Instructions to Bidders,
45 days after the end of the validity period of the Bid. Date should be inserted by the
                                  PERFORMANCE SECURITY
                                                                                      (NameofEmployer)
                                                                                      (Address of Employer)
AND WHEREAS it has been stipulated by you in the said Contract that the Contractor shall furnish you with a
Bank Guarantee by recognized bank for the •sum specified therein as security for compliance with his
obligation in accordance with the Conträtt.
AND WHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE           we hereby affirm that   we are the Guarantor and responsible to you on behalf of the
Contractor, upto.atotalof                                                            (amount of guarantee)*
                                                                                    (in words), such sum being
payable in types and proportions of currencies in which the Contract prices is payable, and we undertake
to pay you,     upon your first written demand and without cavil or argument, any sum or sums within the
limits of                                                        (amount of guarantee) as aforesaid without
your needing to prove or to show grounds or reasons for your demand for the sum specified therein.
We hereby waive the necessity of yourdemanding the said debt from the contractor before presenting is with
the   demand.
We further agree               or addition to or other modification of the terms of the Contract to of the
                    that no change
Works to be performed thereundér or Of any of the Contract documents which may be made between your
and the Contractor shall in any way release us from any liability under this guarantee, and we hereby waive
notice of any such charge, addition or modifications.
This guarantee shall be valid until 60 days from the date of expiring ofthe Defect Liabilities period.
                           Address
                           Date
      An amount shall be inserted by the Guarantor, representing the percentage the Contract price specified
      in the Contract denominated in Indian Rupees.
                                                          83                                                       SBD
        AND WHEREAS it has been                      you in the said Contractthat the Contractor shall furnish
                                         stipulated by
you with a Bank Guarantee by a recognized bank for the sum specified therein as security for compliance
with his obligation in accordance with the Contract.
AND WHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that              We   are the Guarantor and     responsible to
                                                                                                 you on behalf of the
Contractor, uptoatotälof                                                                       (amount of
                                                                                        (in   words), such   sum   being
payable in types and propodions of currencies in which the Contract prices is payable, and             we undertake
to pay you, upon    your first written   demand and without cavil or argument, any sum or sums within the
limits of                                                      (amount of   guarantee) as aforesaid without your
needing to prove or to show grounds or reasons for your demand for the süm specified therein.
We hereby waive the necessity of your demanding the said debtfrom the contractor before presenting is with
the demand.
We further agree that no change or addition to or other modification of the terms of the Contract to of the
Works to be performed thereunder or of any of the Contract documents which may be made between
your and the Contractor shall in any way release us from any liability under this guarantee, and we hereby
waive notice of any such charge, addition or modifications,
This guarantee shall be valid until 28 days from the date of expiring of the DefectLiabilities period.
                            Date
                                                        84                                               SBD
(Address of Employer)
(Name of Contractor)
Gentlemen:
           In accordance with   the provisions of   the Conditions of Contracti sub-clause 51.1 ("Advance
Payment") of the above mentioned Contract,                                               (name and   address of
Contractor) (hereinafter called "the Contractor") shall deposit with
(name of Employer) a bank guaräntee his proper and faithful performance under the said Clause of the
Contract in an amount of                       (amount of Guarantee)*
in words).
                                                                                                                    o
          We, the                                                       (bank of financial institution), as
instructed bythe Contractor, agree unconditionally and irrevocably to guarantee as primary obligator and not
as Surety merely, the payment to                                                         (name of Employer) On
his first demandwithout whatsoever right of obligation on our part änd without his first claim to the Contractor,
in the amount not. exceeding                                                      (amount of guarantee)*
                                                                                     (in words)
          We further agree that no change oraddition to or Other modifications of the terms of the Contractor or
Works to be performed thereunder or of any of the Contract documents which may be made between
                                                     (name of Employer) and the Contractor, shall in
any way release us from any liability under this guarantee, and we hereby waive notice of any such change,
addition or modifications.
                                                                                                                    o
This guarantee shall remain valid and in full effect from the date•of the advance payment under the Contract
until                                                  (name of employer) receives full repayment   of the
                                                                                                             same
amount from the contractor.
                                                  YOURSTRULY
                             Signature and Seal
Name of Bank
Address
Date
        An amount shall be inserted by that Bank or Financial Institution representing      the   amount of the
        Advance Payment, and denominated in Indian Rupees.
                                                               85                                                  SBD
                                             Letter of Acceptance
                                               (Letter head paper of the Employer)
(Date)
Dear. Sirs,
corrected and modified in accordance With the Instructions to Bidders* is hereby accepted by our agency
You are requested to furnish performance security, in the form detailed in. para 34.1 of ITB for an
acceptance up to beyond 60 days from                   the   date of expiry of defects Liability period i.e. up to
                                   and the Additional Performance Security for an amount equivalent to Rs.
Your's Faithfully
Authorized Signature
Name of Employer
      Delete "Correctedand" or and modified if only one ofthese actions       applies. Delete   as corrected and modified
      in accordance with the Instructions to Bidders, if corrections or modifications have not been affected.
                                                         86                                               SBD
(Date)
Dear Sirs,
Pursuant     to
                  your furnishing the requisite security in ITB Clause 34.1 and signing of the Contract for the
construction of
You are hereby instructed to proceed with the execution of the sajd works in accordance with the
contract documents.
Your's Faithfully
                                                                                                                   o
                                                                      (Signature, name and title of signatory
                                                                    authorized To sign on behalf of Employer)
                                                          87                                                 SBD
                                          AGREEMENT FORM
 This agreement, made on the                             day of                                            between
                                                              (name and address of Employer) (Hereinafter called
 "the Employer) and                                                             (name and address of contractor)
 hereinafter called "the Contractor" of the other pact.
Name and identification number of contract (hereinafter called "the works") and the employer has accepted
the Bid by the   Contractor fpr the execution and completion of such works and the remedying of any defects
therein, ata cost of Rs.
NOW AS FOLLOWS
and remedy any defects therein in conformity in all aspects with the provisions of the contracts.
3.     The employer hereby covenants to pay            the    Contractor in consideration of   the   execution and
       completion    of the   works and   the remedying the   defects wherein contract price or such other sum as
       may become payable under the provisions ofthe Contract at the times and in the manner prescribed
       by the contract.
4. The Hollowingdocuments shall be deemed to form and be ready and construed as part of this
Agreement viz
letterofAcceptance
Contract Data
(vii ) Drawings
(bc) Any other documents listed in the Contract data as forming part of the Contract.
In witness whereof the parties there to have caused this Agreement to be executed the day and year
In the presence of
                                        UNDERTAKING
                                              (For   Investment)
(Title of Officer)
(Name of Firm)
Date
                                                                           .1
                                                     90                                               SBD
                                        UNDERTAKING
                                               (For Validity)
for date fixed for receiving the same and it shall be binding on us and may be accepted at any time before the
(Title of Officer)
(Name of Firm)
Date
                                                                                                                  O
            SBD
SECTION-9
DRAWINGS
            92              SBD
       SECTION   -
                     10
DOCUMENTS TO BE FURNISHED
       BY BIDDER