PTW065

This document is a General Permit to Work for facility management regarding the booster pump replacement at ADGM Square, effective from May 2023. It outlines the project details, safety precautions, and permit requirements, with a work schedule from July 5 to July 31, 2025. The permit emphasizes that Khidmah is not responsible for incidents arising from the contractor's work, which falls under their own health and safety responsibilities.

Uploaded by

jaisonpais4444
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views2 pages

PTW065

This document is a General Permit to Work for facility management regarding the booster pump replacement at ADGM Square, effective from May 2023. It outlines the project details, safety precautions, and permit requirements, with a work schedule from July 5 to July 31, 2025. The permit emphasizes that Khidmah is not responsible for incidents arising from the contractor's work, which falls under their own health and safety responsibilities.

Uploaded by

jaisonpais4444
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Document No.

: KHI-HSE-F-018
Version: 7.0
Effective Date: May 2023

GENERAL PERMIT TO WORK-FACILITY MANAGEMENT


Permit Serial No: 2025/07/ST157/PTW065

SECTION 1: DETAILS (Complete all information)

Project Name: ADGM Square AL MAQAM TOWER 03 R2 PLUMBING PLANT


Exact Work Location:
ROOM

Facility Name: ADGM Square Facility Manager: Romar Emnace

Company Name: DCSERVE EQUIPMENT TRADING L.L.C Direct Supervisor jaison


Contact Name:
Direct Supervisor
Position: Site Engineer 0551233729
Contact Number:
Booster pump replacement in al maqam tower Risk Category (Low,
Brief Description of Work: Low
3 R2 plumbing plant Room Medium, & High):

Work Start Date: 05/07/2025 Work End Date: 31/07/2025

Work Start Time: 05:31 PM Work End Time: 08:36 AM

Client: Aldar Entity: Khidmah

SECTION 2: PERMIT REQUIREMENTS (tick all relevant boxes)

Confined Spaces Use of Scaffolding Hot Work (spark/heat) Use of MEWP (Scissor, Boom, etc.)

Use of Lifting machines Work with Lead Specialised Apparatus Work with Ladder

Work with Noise (85dB+) Excavations LOTO/Isolation of systems Work at Height above 1.8 Mtr.

Heavy Machinery Façade Cleaning Others (specify) : GENERAL WORK PERMIT

SECTION 3: SERVICES / AREAS AFFECTED (tick all relevant boxes)

Electrical / Mechanical HVAC Fire Systems Compressed Air

Drainage Water (Pot, CH, Irr) Gas Waste Systems (Evac)

Clubhouse / Mosque Residential Roads Other (Specify):

SECTION 4: SAFETY PRECAUTIONS TO BE TAKEN BY PERSONNEL (tick all relevant boxes)

Safety Helmet Eye Protection Hearing protection Safety Footwear

Safety Harness Fire Extinguisher Road Closure Alternative precautions

Area hand-over Elec / Mech. Isolations High Visibility Clothing Others (specify):

SECTION 5: SIGNATURES (in correct sequence)


Print Name: Signature: Date/Time:
I hereby confirm that the permit conditions and HSE precautions specified, will be implemented, maintained, supervised and adhered to at all times. I furthermore accept
that, any non-compliance with the HSE conditions, will result in revocation of the approved Permit.

Permit Applicant:
jaison 03/07/2025 04:16 PM

I hereby authorise the operations to proceeds subject to full compliance with the necessary safety precautions as per the above signature.

Permit Issuer (Khidmah Facility


Manager or Delegate)
Kesavan Sethusamy 07/07/2025 01:40 PM

HSE Dept. (or Site HSE Rep)


Jayakumar Plackal 07/07/2025 03:09 PM

Security In- Charge (Supervisor)

SECTION 6: PERMIT/ACTIVITY STATUS


Return to Khidmah Facility Manager (or Deputy) immediately on completion /abandonment of the work for closure, cancellation of the permit or for issue
of extension of the permit. Permits can only be extended once after initial approval, in order to complete the planned works. In case the permit has not
been returned, the permit is automatically cancelled, as per the Work End Date and Time.

Activity completed PTW expired PTW cancelled


Description:
PTW Extended Date/Time:

Permit Cancelled/closed
Date / Time Authorised by:
(if returned)
Note: The activity mentioned above is not under Khidmah Scope, this Permit is provided for access purpose only, Khidmah is not responsible for any kind
of incidents (Injury / Property damage) resulting out of the task performed by the contractor also Health & Safety implementations, monitoring and
responsibilities lies under the contractor / Tenant scope.