The document is an Inspection and Test Plan (ITP) for the Glasgow Project under PT. LDC Indonesia, detailing inspection activities across various sections including design review, material receiving, fit-up checks, and testing procedures. It specifies the required documentation, responsible departments, and the involvement of third-party inspectors for each activity. The ITP is structured to ensure compliance with client specifications and industry standards throughout the mechanical utilities project.

Uploaded by

Pencarianbakat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views8 pages

1.0 Itp Piping

The document is an Inspection and Test Plan (ITP) for the Glasgow Project under PT. LDC Indonesia, detailing inspection activities across various sections including design review, material receiving, fit-up checks, and testing procedures. It specifies the required documentation, responsible departments, and the involvement of third-party inspectors for each activity. The ITP is structured to ensure compliance with client specifications and industry standards throughout the mechanical utilities project.

Uploaded by

Pencarianbakat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 8

ITP No.

: 002/QC/PRI/LDC/III/24

INSPECTION AND TEST PLAN ( ITP ) Rev. No. 1


Date Issued: 03/09/2024

Customer : PT. LDC INDONESIA SIGN FOR APPROVED


Project : MECHANICAL OSBL#2 (Utilities) INTI INDAH 3rd Party Inspctor LDC
Title : GLASGOW PROJECT

INSPECTION ACTIVITIES, SIGN AND DATE


VERIFYING
REFERENCE DEPART. 3rd Party
NO ITEM ACTIVITIES DOCUMENT/REPOR II LDC
DOCUMENT INVOLVE Inspctor REMARKS
T
CAT. SIGN CAT. SIGN CAT. SIGN
1.0 SECTION 1
1.1 Design / Engineering Review
- Specification
- P & I Diagram, Isometri Plan Approval Design Eng.
Client Spec., Req.,
Spec., Calc., H/W R R
- Drawing Standard & Code QC
Drawing

1.2 WPS Qualification: Client Spec.,


Drawing, Weld Map Approved WPS Prod.
Standard & Code H/W R R
PQR QC

1.3 Welder Qualification


WPS, Drawing, Weld
WPQR Prod.
Map H/W W W
QC
ITP No. : 002/QC/PRI/LDC/III/24

INSPECTION AND TEST PLAN ( ITP ) Rev. No. 1


Date Issued: 03/09/2024

Customer : PT. LDC INDONESIA SIGN FOR APPROVED


Project : MECHANICAL OSBL#2 (Utilities) INTI INDAH 3rd Party Inspctor LDC
Title : GLASGOW PROJECT

INSPECTION ACTIVITIES, SIGN AND DATE


VERIFYING
REFERENCE DEPART. 3rd Party
NO ITEM ACTIVITIES DOCUMENT/REPOR II LDC
DOCUMENT INVOLVE Inspctor REMARKS
T
CAT. SIGN CAT. SIGN CAT. SIGN
2.0 SECTION 2
2.1 Receiving Material
- Pipe
- Fittings PO, DO, Mill Material Inspection
MC H SW SW
- Flange Certificate, Drawing, Report
- Blind Flange Tolerance, S.O.P.
- Gasket
- Etc

2.2 Material repair (if Any) Eng.


Drawing, Procedure, Repair Report if
Prod. H R R
NCR req.
QC

2.3 Marking, Cutting & Beveling


- Pipe
- Fittings
- Flange Drawing, Cutting MC
Cutting scheme W R R
- Blind Flange Plan, Tolerance QC
- Gasket
- Etc
ITP No. : 002/QC/PRI/LDC/III/24

INSPECTION AND TEST PLAN ( ITP ) Rev. No. 1


Date Issued: 03/09/2024

Customer : PT. LDC INDONESIA SIGN FOR APPROVED


Project : MECHANICAL OSBL#2 (Utilities) INTI INDAH 3rd Party Inspctor LDC
Title : GLASGOW PROJECT

INSPECTION ACTIVITIES, SIGN AND DATE


VERIFYING
REFERENCE DEPART. 3rd Party
NO ITEM ACTIVITIES DOCUMENT/REPOR II LDC
DOCUMENT INVOLVE Inspctor REMARKS
T
CAT. SIGN CAT. SIGN CAT. SIGN
3.0 SECTION 3
3.1 Fit-up Check
(Visual & Dimensional before welding)
- Pipe
- Fittings
- Flange Drawing, Tolerance, Welding Control Prod
W SW SW
- Blind Flange Standard & Code Record QC
- Gasket
- Etc

3.2 Visual Check after welding


Drawing, Weld Map, Welding Control
for each parts QC W SW R
Tolerance. Record

3.3 Non Destructive Test (NDE)


Drawing, Tolerance,
- PT for weld joint of pipe (if require NDE report NDE Team W W SW
Standard & Code
- RT for weld joint of pipe (if require QC

3.4 Final Visual & Dimensional Check


Drawing, Tolerance, Dimensional Check
QC H SW SW
Standard & Code Report
ITP No. : 002/QC/PRI/LDC/III/24

INSPECTION AND TEST PLAN ( ITP ) Rev. No. 1


Date Issued: 03/09/2024

Customer : PT. LDC INDONESIA SIGN FOR APPROVED


Project : MECHANICAL OSBL#2 (Utilities) INTI INDAH 3rd Party Inspctor LDC
Title : GLASGOW PROJECT

INSPECTION ACTIVITIES, SIGN AND DATE


VERIFYING
REFERENCE DEPART. 3rd Party
NO ITEM ACTIVITIES DOCUMENT/REPOR II LDC
DOCUMENT INVOLVE Inspctor REMARKS
T
CAT. SIGN CAT. SIGN CAT. SIGN
4.0 Section 4
4.1 Hydrostatic test
Client Spec.,
Hydrostatic test Prod. H W/R W/R
Drawing, SOP
Report QC
4.2 Pneumatic test
Client Spec., Pneumatic test
Prod. H W/R W/R
Drawing, SOP Report
QC

4.3 Flushing / BlowingTest


Client Spec., Flushing Test
Prod. W W/R W/R
Drawing, SOP Report
QC

4.4 Painting (if Any)


Client Spec.
Painting Reprot Prod W R SW
Drawing, SOP
QC

4.5 Manufacturing Data Report (MDR)


Client Spec.
for Pipe Installation Test Package Prod W R R
Drawing, SOP
QC
ITP No. : 002/QC/PRI/LDC/III/24

INSPECTION AND TEST PLAN ( ITP ) Rev. No. 1


Date Issued: 03/09/2024

Customer : PT. LDC INDONESIA SIGN FOR APPROVED


Project : MECHANICAL OSBL#2 (Utilities) INTI INDAH 3rd Party Inspctor LDC
Title : GLASGOW PROJECT

INSPECTION ACTIVITIES, SIGN AND DATE


VERIFYING
REFERENCE DEPART. 3rd Party
NO ITEM ACTIVITIES DOCUMENT/REPOR II LDC
DOCUMENT INVOLVE Inspctor REMARKS
T
CAT. SIGN CAT. SIGN CAT. SIGN
5.0 Section 5 (Pump/ Equipment)
5.1 Rotary by Handle Turning Device Vendor Operation &
Maintenance Inspection Report Prod. W W/R W/R
Manual QC
5.2 Tightening Couple Bolt
Vendor Operation & Bolt Tightening
Maintenance Prod. W W/R W/R
Report
Manual QC

5.3 Vibration Analysis Vendor Operation & Mechanical


Maintenance Running Test Prod. W W/R W/R
Manual Report QC

5.4 Bearing Temperature Measurement Vendor Operation & Mechanical


Maintenance Running Test
Manual Report Prod. W W/R W/R
QC
5.5 Function Test
Vendor Operation &
Pump Inspection Prod. H W/R W
Maintenance
Checklist
` Manual QC

5.6 Commisioning (SAT) Mechanical


Client Spec.,
Running Test Prod. W W/R W
Drawing, SOP
Report QC

5.7 Alignment of Connection Pipe / Vendor Operation &


Main Nozzle Maintenance Alignement & Shaft Prod. W W/R W/R
Manual & Isometrik Report
QC
Drawing Piping
ITP No. : 002/QC/PRI/LDC/III/24

INSPECTION AND TEST PLAN ( ITP ) Rev. No. 1


Date Issued: 03/09/2024

Customer : PT. LDC INDONESIA SIGN FOR APPROVED


Project : MECHANICAL OSBL#2 (Utilities) INTI INDAH 3rd Party Inspctor LDC
Title : GLASGOW PROJECT

INSPECTION ACTIVITIES, SIGN AND DATE


VERIFYING
REFERENCE DEPART. 3rd Party
NO ITEM ACTIVITIES DOCUMENT/REPOR II LDC
DOCUMENT INVOLVE Inspctor REMARKS
T
CAT. SIGN CAT. SIGN CAT. SIGN
6.0 Section 6 (Small Tank)
6.1 Material Receiving PO, DO, Mill MC
Certificate, Drawing, Inspection Report Prod. W W/R W/R
Tolerance, S.O.P. QC
6.2 Fabrication
Drawing, Cutting Cutting scheme MC
W W/R W/R
Plan, Tolerance QC

6.3 Fit Up Check (Visual Dimension


Drawing, Welding
Before Welding) Welding Control Prod. W W/R W/R
Map, WPS , ASME IX
QC

Inspection of Marking & Cutting


Marking, Cutting
6.4 - Plate for Shell, Roof, Bottom
Drawing,Cutting Plan
- Flange for Nozzle
Plan,Tolerance Report MC W W/R W/R
- Pipe for Nozzle

Fit-up Check (Visual & Dimensional Note : Check For


6.5 ) -Shell Prod. W W/R W 1. Rondness
-
Drawing ,Weld 2. Peaking &
Shell To Bottom QC
Map,Tolerance. WPS Welding Control Banding
- Roof
(ASME Sec IX) 3. Buckling
- Bottom
ITP No. : 002/QC/PRI/LDC/III/24

INSPECTION AND TEST PLAN ( ITP ) Rev. No. 1


Date Issued: 03/09/2024

Customer : PT. LDC INDONESIA SIGN FOR APPROVED


Project : MECHANICAL OSBL#2 (Utilities) INTI INDAH 3rd Party Inspctor LDC
Title : GLASGOW PROJECT

INSPECTION ACTIVITIES, SIGN AND DATE


VERIFYING
REFERENCE DEPART. 3rd Party
NO ITEM ACTIVITIES DOCUMENT/REPOR II LDC
DOCUMENT INVOLVE Inspctor REMARKS
T
CAT. SIGN CAT. SIGN CAT. SIGN
Visual Check After Welding
-Shell Drawing ,Weld
6.6 - Shell To Map,Tolerance. Welding Control Prod. W W/R W
Bottom WPS( ASME Sec IX)
- Roof
- Bottom

Drawing, Tolerance, Dimensional Check


QC H W/R W
6.7 Final Visual & Dimensional Check API 650 Report

NDE Test H W/R W/R


Client Spec.,
- Radiography Test Spot for Shell, Client Spec.,
6.8 Drawing,SOP, API QC
- Penetrant Test Drawing,SOP
650

Client Spec.,
Drawing,SOP, API Pneumatic Test Prod. H W/R SW
6.9 Pneumatic Test For Pad Plate
650 (Pressure 1 Report
Kg/Cm².G)

6.10 Client Spec., Prod. H W/R W


Full Water Test
Full Water Test Drawing,SOP, API
Report
650
ITP No. : 002/QC/PRI/LDC/III/24

INSPECTION AND TEST PLAN ( ITP ) Rev. No. 1


Date Issued: 03/09/2024

Customer : PT. LDC INDONESIA SIGN FOR APPROVED


Project : MECHANICAL OSBL#2 (Utilities) INTI INDAH 3rd Party Inspctor LDC
Title : GLASGOW PROJECT

INSPECTION ACTIVITIES, SIGN AND DATE


VERIFYING
REFERENCE DEPART. 3rd Party
NO ITEM ACTIVITIES DOCUMENT/REPOR II LDC
DOCUMENT INVOLVE Inspctor REMARKS
T
CAT. SIGN CAT. SIGN CAT. SIGN

6.11 Client Spec., Prod. W W/R SW


Report Pickling And
Acid Pickling / Cleaning Drawing,SOP, API
Passivation
650

Client Spec.,
6.12 Drawing,SOP, API Vacuum Box Test Prod. H W/R W
Vaccum Box Test (Bottom Plate)
650 (Min. -0,5 Report
CmHg / G2)

Category :
N/A = Not Applicable PO = Purchase Order H = Hold
SOP = Standard Operating Procedure DO = Delivery Order W = Witness
WPS = Welding Proc. Specification NCR = Non Conformity Report R = Review
PQR = Procedure Qualification Record WPQR = Welder Performance Qualification Record SW = Spot Witness