T-72
MAIN BATTLE TANK
MODERNIZATION PROGRAM
                                                                                                         TECHNICAL
 ▶   Comparable with MBT 3rd generation              ▶   Increase of the day and night fire efficiency
                                                         conducted by the gunner and commander for
 ▶   High mobility and maneuverability                   both the static and moving targets
 ▶   Excellent conduct of battle activities by day
     and night, higher effects
                                                     ▶   Increase of the first round hit probability     DATA
                                                     ▶   Improvement of the battle activities conduct
 ▶   High passive and active protection                  by day/night
                                                                                                         Weight . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48 t
 ▶   Easy operation, maintenance and repairs         ▶   Introduction of more efficient ammunition       Max. power of engine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .736 kW
                                                     ▶   Increase of the tank crew protection            Power output . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15,3 kW/t
 ▶   Ammunition of higher fire effects
                                                                                                         Surface pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94,1 kPa
                                                     ▶   Increase of the maneuverability and technical
                                                                                                         Crew . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
                                                         features of the tank
                                                                                                         Maximum speed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61 km/h
                                                     ▶   Improvement of the reliability
                                                                                                         Operation range . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 700 km
                                                     ▶   Easy to operate, maintain, and repair
MAIN GOALS
OF THE MODERNIZATION
DYNAMIC PROTECTION
                                                                              2 720 mm
MAIN OPERATIONAL                                                                                               9 800 mm
IMPROVEMENTS
OF THE MAIN BATTLE TANK
                                                                                                               SUBJECTS OF THE
 ▶   Increase of the first round hit probability, especially with the tank
     on the move
                                                                                                                MODERNIZATION
 ▶   Improved efficiency of the APFSDS ammunition
 ▶   Increase of the crew protection against effects of approaching projectiles
 ▶   Improvement of the tank mobility and maneuverability
 ▶   Integrated driving unit P/Pack
                                                                                         FIRE CONTROL SYSTEM        INCREASING CHASSIS PAYLOAD   LASER WARNING SYSTEM
                                                                                         NIGHT VISION DEVICE        AUXILIARY POWER UNIT         COMMUNICATION SYSTEM
 ▶   Increase of the driving unit life cycle                                             NAVIGATION SYSTEM          POWERPACK                    FIRE FIGHTING SYSTEM
                                                                                         ELECTRICAL SYSTEM          TRACKS                       PROTECTION SYSTEM
 ▶   Maintaining of the actual operational status of the tank                            OPTICAL SYSTEM                                          TURRET
                                                                                         CANNON
 ▶   Automatic gear shift
 ▶   Engine and transmission electronic control
 ▶   Decrease of the fuel and oil consumption
 ▶   Steering by the steering bar
 ▶   Improved night observation capabilities
 ▶   Possibility of the tank navigation and orientation improvement in the terrain
 ▶   Improvement of the crew compartment heating
 ▶   Independent auxiliary supply of power for the tank equipment, aside
     of the tank batteries
 ▶   Possibility of digging the trenches, and terrain modifications
 ▶   Increase of the engine power
VOP CZ is a state enterprise established by the Ministry of Defence of the
Czech Republic for activities in the sector of research, development,
manufacture, services and trade in the field of military materials. We celebrated
70th anniversary of its establishment in 2016. Within the terms of general
repairs we have complexly modernised T-55 tanks into T-55AM2 tanks. Between
2003 and 2005 we prepared and realised modernisation of 30 pcs T-72 tanks
into T-72M4 CZ tanks, including the T-72M CZ-W command post version and
three modernised VT-72M4 CZ recovery tanks for the Czech Armed Forces.
We manufactured 107 PANDUR lI 8x8 CZ wheeled armoured transporters for the
Czech Armed Forces between 2009 and 2013. The delivery included
development and manufacture of special vehicles in reconnaissance,
engineering, ambulance and command post versions. We prepared 4
modernised PANDUR lI 8x8 CZ vehicles for the military mission in Afghanistan.
Now we are strategic partner for MOD of the Czech Republic in project of new
tracked IFV - development and production of 210 pcs.
VOP CZ, S.P.            Dukelská 102, 742 42
                        Šenov u Nového Jičína,
                        Czech Republic
                        Phone: +420 556 783 111
                        E-mail: vop@vop.cz
                        W W W . V O P. C Z