4 MANHOLE COVER DETAIL
P-5 SCALE 1:10M.
3 CROSS SECTION DETAIL
P-5 SCALE 1:30M.
LEACHING LEACHING
DIGESTIVE CHAMBER CHAMBER CHAMBER
2 LONGITUDINAL SECTION DETAIL
P-5 SCALE 1:30M.
PLAN
SECTION
1 PLAN DET. OF SEPTIC TANK 5 CATCH BASIN DETAIL
P-5 SCALE 1:30M.
P-5 SCALE 1:20M.
VARIOUS DPWH PLAN OF SEPTIC TANK,
PROPOSED PROJECTS LONGITUDINAL SECTION, BOD
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) 34
CROSS SECTION DETAIL,
NOTE : ADOPTED FROM DEPED STANDARD PLANS STANDARD TWO-STOREY MANHOLE COVER DETAIL, P-5
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 41
SCHOOL BUILDING CATCH BASIN DETAIL,
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 6-CLASSROOMS ) LEGEND AND PLUMBING NOTES