The document outlines the construction specifications and quantities for various work items including earthwork, concrete work, masonry work, and RCC work for the Snow Fountain Vocational Training Institute. It details the types of materials, dimensions, and unit costs associated with each construction phase. The total estimated cost for the project is approximately 87,266.36.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views12 pages

ESTIMATE 1 (AutoRecovered)

The document outlines the construction specifications and quantities for various work items including earthwork, concrete work, masonry work, and RCC work for the Snow Fountain Vocational Training Institute. It details the types of materials, dimensions, and unit costs associated with each construction phase. The total estimated cost for the project is approximately 87,266.36.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Snow Fountain Vocati

S.NO. Item no. Item Work Unit


EARTH WORK
Earth work in excavation by mechanical means (Hydraulic
excavation)/manual means in foundation trenches or drains
(not exceeding 1.5m in width or 10sqm on plan),including
dressing of sides and ramming of bottoms, for all lift, including
DSR 2023 getting out the excauted soil and disposal of surplus excavated
1
2.8 soils as directed within a lead of 50m

All Kinds Of Soils


1.1
2.8.1
for 230mm thick wall
Cum

Cum
for 115mm thick wall

CONCRETE W
DSR 2023
4.1
2 Providing and leaving in position cement concrete of specified
grade excluding the cost of centering and shuttering All work
up to plinth level
1:5;10(1 cements:5 coarse sand(zone 3) derived from natural
2.1 4.1.10 sources:10grade stone aggregate 40mm nominal size deived
from natural source

for 230mm thick wall Cum


for 115mm thick wall Cum

Room-1 Cum
Room-2 Cum
BATHROOM+W.C. Cum
KITCHEN Cum
APRON Cum

MASONARY WOR
Brick work with common burnt clay F.P.S.(non modular)bricks of
3 6.1 class designation 7.5 in foundation and plinth in:

3.1 6.1.1 cement mortor 1:4 (1cement:4 coarse sand)


for 230mm thick wall
1 Footing Cum
2 Footing Cum
3 Footing Cum
4 Footing Cum
5 Footing(up to G.L.) Cum
6 Footing(G.L.toP.L.) Cum
for 115mm thick wall
1 Footing Cum
2 Footing Cum
3 Footing Cum
4Footing Cum
5 Footing(up to P.L.) Cum

SUPER STR
Brick work with common burnt clay F.P.S.(non modular)bricks of
4 6.4 class designation 7.5 in superstructure above plinth level up to 5
level in all shapes and sizes in:
4.1 6.4.2 cement mortor 1:6(1cement:6coarse sand)
for 230mm thick wall Cum
Deduction
W2 Cum
D1 Cum
W Cum
W1 Cum
V Cum

Half brick masonary with common burnt clay F.P.S.(non


4.2 6.13 morular) bricks of class designation 7.5 in superstructure above
plinth level up to floor 5 level
4.2.1 6.13.1 cement mortor 1:3 (1cement:3coarse sand)
for 115mm thick wall sqm
deduction
D2 sqm
D1 sqm

RCC Wo
DSR 2023 Providing and leaving in position cement concrete of specified
5 grade excluding the cost of centering and shuttering All work
5.1
up to plinth level
1:1.5:3 (1cement:1.5 course sand (zone3) derived from natural
5.1 5.1.1 source : 3 gradedstone aggregate 20mm nominal size derived
from natural source.
PLINTH BAND
for 230 mm thick wall Cum
for 115 mm thick wall Cum

Reinforced cement concrete works in beam,suspended floors


having slope up to 15 degree
5.2 5.3 landing,balconies,shelves,chajjas,lintel bands,above plinth level
up to floor 5 level,excluding the cost of
centering,shuttering,finishing and reinforcement with
1:1.5:3(1cement :1.5 course sand (zone 3) derived from natural
source :3 graded stone aggregrate 20mm nominal size derived
from natural resource)
FOR LINTEL BAND
For 230mm thick wall Cum
for 115mm thick wall Cum
FOR CHAJJAS
in front side Cum
W1 Cum
V Cum
Slab beam Cum
FOR SLAB
Section(A) Cum
Section(B) Cum

REINFORCEMEN
Steel reinforcement for R.C.C. work including straightening,
6 5.22 cutting, bending placing in posision and binding all complete
upto plinth level.
6.1 5.22.6 Thermo - mechanically treated bars of grade Fe-500D or more.
Total quantity of RCC = 0.513 kg
Steel reinforcement for R.C.C. work including straightening,
6.2 5.22.A cutting, bending placing in posision and binding all complete
above plinth level:

6.2.1 5.22.A.6 Thermo -Mechanically treated bars of grade fe-500D more


Total quantity of RCC = 4.25 Kg

SHUTTERING
7 5.9.5 Lintel,beams, Plinth beams, gurders, bressumers
and cantilevers.
PLINTH BAND
For 230mm thick wall Sqm
for 115mm thick wall Sqm
LINTEL BAND
For 230mm thick wall Sqm
for 115mm thick wall Sqm
Slab beam Sqm

7.1 5.9.19 Weather shed, chajjas, corbels etc.,including edges


In front side Sqm
W1 Sqm
V Sqm

7.2 5.9.3 Suspended floors, roofs, landings, balconies, and access


platform
Slab Sqm
untain Vocational Training Institute
No. L(in m) B(in m)H(in m) Quantity(m3) Rate

1 20.28 0.9 0.9 16.43

1 9.44 0.75 0.75 5.31

Total 21.74 260.3

CONCRETE WORK

1 20.98 0.9 0.15 2.74


1 9.44 0.75 0.15 1.06
Total 3.8
1 3.3 2.75 0.075 0.68
1 3 2.2 0.075 0.5
1 1.2 2.05 0.075 0.18
1 1.5 2.2 0.075 0.25
1 21.2 0.6 0.075 0.95
Total 6.36 6518.6

MASONARY WORK
1 20.28 0.69 0.15 2.1
1 20.28 0.575 0.15 1.75
1 20.28 0.46 0.15 1.4
1 20.28 0.345 0.15 1.05
1 20.28 0.23 0.15 0.7
1 20.28 0.23 0.375 1.75

1 9.44 0.575 0.15 0.81


1 9.44 0.46 0.15 0.65
1 9.44 0.345 0.15 0.49
1 9.44 0.23 0.15 0.33
1 9.44 0.23 0.375 0.81
Total 11.84 7370.65

SUPER STRUCTURE

1 20.98 0.23 2.65 12.36

1 0.9 0.23 1.05 -0.22


1 0.9 0.23 2.1 -0.43
1 1.5 0.23 1.2 -0.41
1 0.9 0.23 1.2 -0.25
1 0.9 0.23 0.3 -0.06
Total 10.98 9105.95

1 9.44 2.65 25.016

2 0.75 2.1 -3.15


1 0.9 2.1 -1.89
Total 19.98 1150.5

RCC Work
1 20.28 0.23 0.075 0.35
1 9.44 0.23 0.075 0.16
Total 0.513 9045.75

1 20.28 0.23 0.15 0.69966


1 9.44 0.115 0.15 0.16284

1 4.165 0.6 0.075 0.187425


1 1.2 0.6 0.075 0.054
1 0.75 0.6 0.075 0.03375
1 5.057 0.23 0.12 0.1395732

1 4.826 5.075 0.11 2.6941145


1 0.699 3.76 0.11 0.2891064
Total 4.2604691 11505.5
EINFORCEMENT

Qty. of Rcc x 1.5% x 7850 60.406 107.85

Qty. of Rcc x 1.5% x 7850 500.69 107.85

SHUTTERING
2 20.28 0.075 3.042
2 9.44 0.075 1.416

2 20.28 0.15 6.084


2 9.44 0.15 2.832
2 5.075 0.23 2.3345
Total 15.7085 736.4

1 4.17 0.6 2.5


1 1.2 0.6 0.72
1 0.9 0.6 0.54
Total 3.76 951.1

1 5.08 5.53 28.04 927.25


Amount

5658.09

41467.59
87266.3585

10020.76

22982.39
4637.4846

49018.8272

6514.76

53999.15
11567.7394

3578.04

25999.51