05,06,07F Aggregate Gradation

The document outlines the grading analysis for various aggregate sizes used in the design, supply, installation, testing, and commissioning of ballastless and ballasted tracks in Corridor 2 from Benniganahalli to Chikkabanavara. It includes details on sieve sizes, weight retention, cumulative percentages, and specific limits as per IS 383. The analysis is conducted by Rail Infrastructure Development Company (Karnataka) Limited and the contractor is Rahee Infratech Limited, with testing frequency set at once every seven days.

Uploaded by

Bishakto Manus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views3 pages

05,06,07F Aggregate Gradation

The document outlines the grading analysis for various aggregate sizes used in the design, supply, installation, testing, and commissioning of ballastless and ballasted tracks in Corridor 2 from Benniganahalli to Chikkabanavara. It includes details on sieve sizes, weight retention, cumulative percentages, and specific limits as per IS 383. The analysis is conducted by Rail Infrastructure Development Company (Karnataka) Limited and the contractor is Rahee Infratech Limited, with testing frequency set at once every seven days.

Uploaded by

Bishakto Manus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

ENGINEER Project: Design, Supply, Installation, CONTRACTOR :

Testing and Commissioning of Ballastless,


Ballasted Track, Fastening System and
Turnouts in Corridor 2 from Benniganahalli
to Chikkabanavara @ Chainage (-) 1413 to
Chainage 27029 including Ballasted and
Special Tracks in Soladevanahalli Depot.

Format Title: GRADING ANALYSIS


Format No.:RIL-K-Ride-C2-QA-QC-07
As Per IS:2386-Part-1 (CA - 20 mm)
Engineer: Rail Infrastructure Development Company (Karnataka) Limited.

Contractor: RAHEE INFRATECH LIMITED


Location : Frequency: Once in every 7 days

Record No.: Ref. Method.: As per IS 383


Sampling Date : Sample Source :
Testing Date : Sampled By:
Sample Size/ Sample Wt.:- Sample Location:
Cumulative Cumulative %
Weight Cumulative % of Specific Limit As
Sieve Size (mm) Weight of Weight
retained (gm) Weight Retained Per IS 383
Retained Passing

40 mm 100

20 mm 85 - 100

10 mm 0 - 20

4.75 mm 0-5

Pan

Total

Fineness Modulus:

STATUS OF TEST: SATISFACTORY/ UNDER OBSERVATION/ FAILED

RIL Representative GC/K-Ride Representative

Name: …................................................................... Name: …...................................................................


Sign : ….................................................................... Sign : …....................................................................
Date : …................................................................... Date : …...................................................................
ENGINEER: Project: Design, Supply, Installation, CONTRACTOR:
Testing and Commissioning of Ballastless,
Ballasted Track, Fastening System and
Turnouts in Corridor 2 from Benniganahalli
to Chikkabanavara @ Chainage (-) 1413 to
Chainage 27029 including Ballasted and
Special Tracks in Soladevanahalli Depot.

Format Title: GRADING ANALYSIS


Format No.: RIL-K-Ride-C2-QA-QC-06
As Per IS:2386-Part-1 (CA - 10 mm)
Engineer: Rail Infrastructure Development Company (Karnataka) Limited.

Contractor: RAHEE INFRATECH LIMITED


Location : Frequency: Once in every 7 days

Record No.: Ref. Method.: As per IS 383

Sampling Date : Sample Source :

Testing Date : Sampled By:

Sample Size/ Sample Wt.:- Sample Location:


Cumulative Cumulative %
Weight retained Cumulative % of Specific Limit As
Sieve Size (mm) Weight of Weight
(gm) Weight Retained Per IS 383
Retained Passing

12.5 mm 100

10 mm 85 - 100

4.75 mm 0 - 20

2.36 mm 0-5

Pan

Total
Fineness Modulus:

STATUS OF TEST: SATISFACTORY/ UNDER OBSERVATION/ FAILED

RIL Representative GC/K-Ride Representative

Name: …................................................................... Name: …...................................................................


Sign : ….................................................................... Sign : …....................................................................
Date : …................................................................... Date : …...................................................................
ENGINEER: CONTRACTOR
Project: Design, Supply, Installation, Testing and
Commissioning of Ballastless, Ballasted Track,
Fastening System and Turnouts in Corridor 2 from
Benniganahalli to Chikkabanavara @ Chainage (-)
1413 to Chainage 27029 including Ballasted and
Special Tracks in Soladevanahalli Depot.

Format Title: GRADING ANALYSIS


Format No.: RIL-K-Ride-C2-QA-QC-05
As Per IS:2386-Part-1 (Fine Aggregate)

Engineer : Rail Infrastructure Development Company (Karnataka) Limited.

Contractor : RAHEE INFRATECH LIMITED

Location: Frequency: Once in every 7 days.

Record No.: Ref. Method.: As per IS 383

Sampling Date : Sample Source :

Testing Date : Sampled By:

Sample Size/ Sample Wt.:- Sample Location:

Weight retained Cumulative Weight Cumulative % of


Sieve Size (mm) (gm) Retained Cumulative % of Weight Retained Weight Passing Specific Limit As Per IS 383

10 mm 100

4.75 90-100

2.36 75-100

1.18 55-90

0.600 35-59

0.300 8-30

0.150 0-20

Pan

Total

Fineness Modulus:

STATUS OF TEST: SATISFACTORY/ UNDER OBSERVATION/ FAILED

RIL Representative GC/K-Ride Representative

Name: …................................................................... Name: …...................................................................


Sign : ….................................................................... Sign : …....................................................................
Date : …................................................................... Date : …...................................................................