The document outlines various quality detail procedures for testing equipment in the Switchgear Division of PE Power Corporation Berhad. It includes instructions for conducting tests such as Potential Transformer Ratio Check, Interchangeability Test, Routine Test for Overcurrent and Earth Fault Relay, Operational Closing and Tripping Tests, Milivolt Drop Test, and Energy Meter Test. Each procedure specifies the purpose, required equipment, and step-by-step instructions to ensure compliance with company practices.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0 ratings0% found this document useful (0 votes)
48 views27 pages
Switchgear FAT Routine Checklist
The document outlines various quality detail procedures for testing equipment in the Switchgear Division of PE Power Corporation Berhad. It includes instructions for conducting tests such as Potential Transformer Ratio Check, Interchangeability Test, Routine Test for Overcurrent and Earth Fault Relay, Operational Closing and Tripping Tests, Milivolt Drop Test, and Energy Meter Test. Each procedure specifies the purpose, required equipment, and step-by-step instructions to ensure compliance with company practices.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 27
UNCONTROLLED COPY
ENGINEERING OEPARTIENT Jooc.no: ep,
SWITCHGEAR DIVISION
(QUALIT- DETAIL PROCEDURE
[pare aaa
POTENTIAL TRANSFORMER RATIO CHECK
AULTESTI 6 PERSONNEL,
PREPARED BY:
Ae.
HISHAN ABD RABIN
resting enoneER
APPROVED BY
‘SHITE A. MANAF
ENGINEERING MANAGER
PE POWER CORPORATION BERHAD
“S¥ITCHGEAR DMISION| ‘QUALIYDETAIL PROCEOURE. Joos. nos ete
REVO: t
| | POTENTIAL TRANSFORMER RATIO CHECK,
| | jpacENOT OF
| | 1 Purpose
1 Tovey rato aried on PT nameplate Is corect
412 Tovey switergearassemtiod with potantal vanefrmers of crest eo,
1 2 Equipment
2.4 High votepepressur test sot.
| 22 Volineer Vi tomeasar secondary vole,
| 2
' 31. _epecet is ao core ig opt orn oid
| Telgcrun te Secney testa Ste oe sea
as meters or weed up olemina boc,
32 Recoid the PT earl numbers and fest observation into te frm TC 007
4. Pealiminary
44 Place PT Nise a pinay trina ho PTA 8)
TE POWER CORPORATION BERHAD
: [SYITCHOEAR DMISIONQUALITY DETAIL PROCEDURE. loos. no: eens
POTENTIAL TRANSFORMER RATIO CHECK
IREV.RO: 7
[exer —aaaer
lpaaENO: 3 -oF
st
62
63
5a
62
"a
73
checking Rata of PT on Phase
Refer ta scent raving to determine the secondary wing ans connections
Figaro 1 chow example for PT with secondary connected to vine.
the PY secondary isnt connaced io ay eleticl deve but deel wr up tthe
terminal beck place volmeler1 ated phase secondary laminate he PT o earth
Roles Fgura.
LinkyYetow r@ Blue pave to ent and apply 60% of ate vataze to Red phase
‘and folow by 109%
‘Obeome and icord he vege measured by votes
‘Check thatthe ra ofthe reaingvllmaterazpowimala te rao marked on hs
PTrnamepite
Eg, Pi rato rard on namepie : KW
Votope apals 55
Volimoterraating = 5 SKY {equalan to 55V)
checking Ratio of PT on Y Phase
Unk Rod, Bue phase to ea,
‘Apples 50% aod votga fo Yelow pase and fallow by 100% erated votage,
Repae slaps 6.31054
checking Ratio of PT on BPhase
Link Rod, Yetow pasa oar
‘Appi 50! aed voltage fo Ble phase an flow by 100% of raed vohage
Repeat steps 5.31054
{PE POWER CORPORATION BERHAD
SUMTENGEAR orAsiON‘QUALITY DETAIL PROCEDURE loor.no: errera
j RETR: 7
POTENTIA. TRANSFORMER RATIO CHECK
: [prey a0
\ REIS sas
RyY8 pote
uo FR
— Af
| vis
Piss Se Eo
ens!
Tit 5 Wis Bie
le
i FIGURE 1
{EPE POWER CORPORATION BERKAD
: SYMTCHGEAROMSIOHUNCONTROLLED COPY
[ENGNEERNG DEPARTNENT Joos. no. emPia
[EPE SWMTCHGEAR DIVISION
[REV nos 7
(QUALITY DETAIL PROCEDURE
oar 72a
INTERCHANGEABILITY TEST
‘pis DOCUMENT PRESCRIES COMPANY PRACTICE ANDIS FOR INTERNAL USE ONLY.
‘Tie PROCEDURES DESCRIEDIN THIS DOCUMENT SHALL GE STRICTLY FOLLOWED BY
ALL TeST/ac PERSONNEL
PREPARED BY: APPROVED BY :
HagHAM ABDUL
SHITHLA MANA
PROSUCTIAB
ENGINEER ENGINEERING MANAGER
TEPE POWER CORPORATION BERHAD
SYATENGEAR ONNSION‘QUALITY DETAL PROCEDURE lboc.os eTPIB
IRECROT 7
jpRe 2a
INTERCHANGEASILITY TEST
jpaceNO? 2 OFT
4+ Purpose
“4
12
2a
22
aa
2a
“To ensue the VOB eke ogi feeders shst be lnterchanged between outgoing
feesers ony.
“To enoia the VOB tuk of ncoming
feeders oy,
ors sha be ntrcha
between incoming
Interehangoabiiy Test
Phopin be VOB avr conse for etging feeder and rack nthe VEB nt the
cugoing panel
Intrehangethe V3B wth anaher oulpeing panel and rack nts VOR according.
‘The V8 shal becepsble of nerchorgina.
[Repeat si 21 batinerchange te VOB ith incoming panel and rack inthe VOB
‘caring. The ging VB shal rat ba possible track no te rcoing pel
Recara dun be sesenaten no T6022
Pepeat step 2.1 frincorng VOB ona vokage Wanslermor coll and record dove te
obearatonlaa To 021
EPE POVIER CORPORATION SERHAD
SHITCHGEARDMISIONENGINEERING DEPARTMENT
‘SWITCHGEAR DAISION
a T
‘QUALITY DETAIL PROCEDURE
laRre + DATSST
ROUTINE TEST FOR OVERCURRENT AND EARTHFAULT RELAY
2TJM10
“ras Bocumen pRescnlasS COMPANY PRACTICE AND IS FOR INTERNAL USE ONLY
‘THE PROCEDURES DESCR.ZED IN THIS BOCUMENT SHALL BE STRCTLY FOLLOWEDDY
[ALLTESTIO“ PERSORNEL
Rand! we
PE POWER CORPORATION BERHAD
‘SvaTCHGEAR DMSION(QUALITY DETAIL PROCEDURE loos. nos esters
IREVNOF 7
[ROUTINE TEST FOR OVERCURRENT ANO EARTHFAULT
jonte GT
RELAY -2TIMI0 [paceno: TOF 3
at
32
3a
aa
Purpose
‘To determine whebereayoperstes satisfactory.
Tecdterminewhaberencondayexrtvl wing srd connection othe relays ae goed
‘and in accorines to eraving
Equipment
Primary urentacton est eet or ascondarycurent ncn tet et
AC ammeter ena A.
‘at -tomeoeie pinay curen
‘patomeneso secondary Curent
tug anes.
ota The rocedute scribe bslow cavers the secondary currant ction
‘oat GIT) and primary eutont nfction test (PCI.
Protiminary
Draw cut neat Breater kom he ewiengesr pane!”
Unk gether bs re, yelow and be phaso concuctors to eat stone end a whore
th CTe are noutted on ho pray exe.
‘The epposts endl for connection tote pany rection ests
betray OC song la» 100% and EF setting Is = 20%,
(Check wing eamecton othe ely.
Noe :* onl forPort
TPE POWEn CORPORATION DERHAD
SYITCHOEAR DISION‘QUALITY DETAIL PROCEDURE looc.nos errerta
RevNOr 7
ROUTINE TEST FOR OVERCURRENT AND EARTHFAULT
lores area
RELAY 27M jpacenor 2 OF
4 nection Tost
44 Prepare the carentinjecton est setup. Retr Fgure 1 or PCIT or gure 2 fr SCI.
42 Apalytesteurento tered and yebow phase 61 200% of CT primary amp.
Noo dn ery operating ite, Repost ho ost fr 300%.
43. Repeat step 42 trine eer phases La. red and be yellow and bv, yelow and exh
44 Record be resin tet form T0003, Result shel be witin nas shownln Tee
Parcantage eure scion paatg Ts ee)
Grarerert Eat
200% sooseee 7% sopsses 7%
08, e5se0+7% e5ee0+7%
Table
‘Note; ) Oveurentsfautbstween phase to phase,
5 ertautis aut bebveen pasa to cath
{EPE POWER CORPORATION BERHAG
SHITCHOEAR DIVISION‘QUALITY DETAN PROCEDURE looe.so. evita
a 7
| leary ante
[ROUTINE TEST FOR OVERCURRENT AND EARTHFAULT
a aro
| Rye
| ao) Leu ae
oa st
L oo ON a
tu) oF
i ee
Panay conse
Ingenio Test SET
sonar ono
iene es 5
) 1-@) cio _f578)
=| a
| LR
{EPL POWER CORPORATION BERIAD
| [SHTTCHGEAR DNISIONUNCONTROLEED Copy
ENGINEERING DEPARTMENT loos. tio: EPs?
[EPE SWATCHGEAR DNISION
[REV 7
‘QUALITY DETAML PROCEDURE
lpare > —Fane7
OPERATIONAL CLOSING TEST
“The PROCEDURES OESCRREO HTS DOCUMENT SHALL BE STRICTLY FOLLOMED BY
ALL TESTI Co PERSOMNEL
PREPARED BY:
vishawagoo.
PRODUCTIAPPLISATION ENGINEER
APPROVED BY +
SSHITH A MANAF
ENGINEERING MANAGER
'EFE POWER CORPORATION BERHAD
SHITCHGEAR ONION‘QUALITY DETAL PROCEDURE oor. wo: esrii7
[Rene 7
sates ——2a087
OPERATIONAL CLOSING TEST
pacEno? TOFS
41 Purpose
‘To Getamin cong ct othe VoB ate good,
a4
22
23
2a
28
To delrmia all dectrcal operation ae geod
To determina he dosing cl ststaclory operst whan the supply drop to BOM
snereas to 120% he ated vooge
Closing Operation
Plug inthe VOB avr contaclarinal and rack inthe VCB avian ino the
songs panel
Connsct up hs power (240V AC) and contrat sop tothe sshgeas
Reduce the con! spay 60% af a ral vatace, Sich ON he mln su,
Cine the cout teoier a0 recor the chaarason nto the TCOS2.
Repeat top 2b crete ie conto! supply to 120% of aod votage
{ERE POWER CORPORATION BERHAD
SHITCHGEARDMIONUNCONTROLLED COPY
ENGIVEERNG DEPARTIENT looc.nos eres
EPE SWITCHGEAR DIVISION
REV NOT 7
‘QUALITY DETAIL PROCEDURE
pate > 2a
OPERATIONAL TRIPPING TEST
PREPARED BY:
Le
shan AEDUL RADON SHITHLA DANAR
PromuiapaLion TOW ENGINEER Enintemis WaNAseR
'EPE POWER CORPORATION BERRAD
SATCNGEAROOMSION24
22
23
‘QUALITY DETAIL PROCEDURE looc.wos ertPna
aa 7
[pee aT
OPERATIONSL TRIPPING TEST
pxcene: 2 oF E
4 Purpose
To determine ppg cot c= VOB are gs,
‘Te eetemine a electri! operaon are good
‘Tacsermin tipping eo etetactry epeate when te euply tog opto £08
olratedvolg
“Tipping Operatien
Plugin the VOB austin const and rack in he VOB tuck nto tha sichgear pare
Connect op te poner 240V AD) snd conte supay to ba swhgost
FRedoco the coir sursy to 80% ofthe rated wage, Swed ON the mn soppy
Trp the rout beste and record the obsrvatin Ii tha TC O33
PE POWER CORPORATION BERHAD
PagesUNCONTROLLED COPY
ENGINEERING DEPARTHENT poc.sos errerss
EPE SWITCHGEAR DIVISION
EVN: v
‘QUALITY DE"BIL PROCEDURE
[pare EBT
MILIVOLT DROP TEST
‘his DocuMenr PRESERIBES COMPANY PRACTICE ANOS FOR INTERNAL USE ONLY.
‘HE PROCEDURES DESCRIBZO IN THS COCUNENT SHALL BE STRICTLY FOLLOMED BY
ALLTEST rac PERSONNEL,
PREPARED BY: APPROVED BY ¢
wighiaes ABDUL SHIT A MANA
PRDDUCTIAPPLIGATIONENGINEER, ENGINEERING MANAGER
'EPE POWER CORPORATION BERHAD
‘SumTeuceaR oIMsion1
2
(QUALITY DETAIL PROCEDURE: looc.na: emPii9
EVN: 7
lentes SF
HMLUVOLT DROP TEST
jensenor ZFS]
4 Purpose
“Todetemine ive top (contact resistance) acroze the eel brassr contact
Equipment
Ducler
vat Drop Test
‘Cosethe cul beste and place re curren otage probe ozs red phases
contel. (Ree to Faure 1).
‘appy 1008 eure trough he soe connection and rears down te rea,
pea slop 22 forYetou and Bie pose, Recor dvi he acu ioe TC O31
TPE POWER CORPORATION BERHAD
SYOTENGEARONSION‘QUALITY ozTAL PROCEDURE looe.nios ee
bev nO 7
MRrvoLT DRO? TEST
xr BT
RcENo: SOFT
=|
con oe
{PE POWER CORPORATION BERIAD
S¥MTCHGEARONASIOUNCONTROLLED COPY
ENGPIEERING DEPARTIIENT looe. nox errer20
EPE SWITCIGEAR DIVISION
QUALITY DETAIL PROCEDURE eee
laa aa
ENERGY METER TEST
{He PRoceOUnes DESCRIBED IN TH'S COCUNENT SHALL BE STRICTLY FOLLOWED BY
ALLTEST rac PERSONNEL,
PREPARED BY: [APPROVED BY =
visti oor aa e SHITHA MANA
PRADUCTIAPPL onsen ENGINEERING BANAGER,
TPE POWER CORPORATION BERHAD
SWITCHGEAR DISION‘QUALITY DETAIL PROCEOURE looc.no: emPr20
RecN o
ENERGY METER TEST -
pacen> “FOF T
at
32
a4
38
36
Purpose
Toceterrine wheter ho mat: cpraossaistactry
“To gotomine secondary wring are conc.
Equipment
‘Secondary rection test set Fila
Motimoter At BVI
iinet AS = tomensure est curent
inet Vi ~ tomessuretestvatage
Injection Test
correct carer a vos othe cet and veg ei ofthe er
reaping
Seca emetic nou
to
on eral sconan weg ad care SA HOV) win hse rng OT
tore utes tne sysom
ecard dow Wo an rah eg oe ample reat 008,
Ise nse pov reaegis atin arb Kang ees
type, teed dou the Ke and Kah eating blore
"te th reales ert epareoe renin wi ne Sov nso
tah aBxtxvacang
he = pinoy ving
1 = parce
ana else ie
Tinga
son |S Post wits 12 xoor0
fate
» Roh sfetnvesng
Saha tsidx 0
é
Repent step 3.2 forothete phase anglais 60)
EPE POWER CORPORATION BERHAD
SWITCHGEAR DYISION‘QuALTY DETAIL PRoceOURE bos. nox een
1 iad 7
DIERGY wereR TEST
| baer ——aaaar
PASE! SOFT
7 [aL
aL,
aly je r|y |e
d
f FIGURE _1
; : PE FOWER CORPORATION BERND
syrichoeanomsionUNCONTROLLED COPY
ENGINEERING DEPARTMENT: Jooe.nio: rtp
EPE SWITCHGEAR DIVISION.
7
(QUALITY DETAIL PROCEDURE
[exten
AMMETER TEST
Tis DOCUMENT PRESCRIBES COUPANY PRACTICE AND IS FOR INTERNAL USE ONLY,
THE PROCEDURES DESCRIBED INTHIS DOCUMENT SHALL BE STRICTLY FOLLOWED BY
[ALLTEST/ QC PERSONEL
REPAREO BY: APPROVED BY +
SHITH A MANAF
ENGIVEERING MANAGER
SSPITCHOEAR BINSION(QUALITY DETAIL PROCEDURE. looc. wo esrPres
Rev Nor 7
[pxre? aan
AMMETER TEST
PasENO? TOFS
a
33
Purpose
‘To cetominewhotterhe ammeter operas sabstactny
To determine sesonday wing ad comectons tothe metors are creck +
Equipment
Primary injection ts se
‘AmmalarAt ~ lo measure esteuren
Injection Tet
Prepare the coten jection et setup. Retro figure 1.
Irjest 25% orated primary tveugh besbor Red nd Earth
Eg. Tato: 4008
‘Curent pled is 1008 and ammeter sess tection shal be 1008
Repeat stop 32 fr 5%, 78% and 100% of rated curent and folowe: by Yelow and
Ble phase connecion
Record don llth eps into TC 039
{EFE POWER CORPORATION BERHIAD
SMTCHGEAR DNISION‘QUALITY OETAnL PROCEDURE looe. nox erent
Ho
ao
RY B oer om.
| =f iro
nH 6 [
pt
ey
[EPE POWER CORPORATION BERLIAD
SwITeNGEAR pISION‘UNCONTROLLED COPY
ENGIVEERNG DEPARTINENT boc. nos erpne
EPE SVITCHGEAR DWISION
Rev. 7
‘QUALITY DETAIL PROCEDURE
[pare aa
VOLTMETER TEST
‘This OocUMENT PRESCRIBES COMPANY PRACTICE AND IS FOR INTERNAL USE ONLY,
PREPARED BY:
[APPROVED BY ¢
pb
SHITHLA MANAF
ENGINEERIG MANAGER,‘QUALITY DETAIL PROCEDURE lboc.nos errer2
RENO 7
[pate S257
VOLTVETER TEST
paGENOT TOF
1 Purpose
A. Todeternine wheter the velar operas satstactrly
2 Toveily he vaineernstaled with te corec ra,
2 Equipment
24 Pressurtesttest
3 Injection Test
3.4 RoferFgwe fort tos sot up
3.2 Unk Yelow and Be phase lo Earn and opp 60% of aad voltage to Red pase and
Ean,
Eg, For 11hV sysem, voltage apied is 8.SkV and he voltmeter seat detection
shat be 8,
33 Repeat step 32 for 75% 100% orate votage and flowed by Yelow and Be phase
‘conection
Recor down a the rests nto TCOIS‘QUALITY ceTAL PRocEOURE looe.nos enera2
REV. nO v
voumweTer Test
7 foare waar
fPacenO? SOF
BI
RY B coe
EPE POWER CORPORATION BERHIAD
rs SYFTCHGEAR DMUNCONTROLLED COPY
f ENGINEERING DEPARTMENT looc.no: eps
EPE SWITCHGEAR DIVISION
[REV.NG: 7
‘QUALITY DECAL PROCEDURE
lowe > 2B
POWER FACTOR METER TEST
‘THs DOCUMENT PRESCRIDES COWPANY PRACTICE AND IS FOR INTERNAL USE ONLY.
{THE PROCEDURES DESCAIBEDIN THS DOCUMENT SHALL BE STRIOTLY FOLLOWED BY
ALLTEST 06 PERSONNEL
PREPAREDBY: APPROVED BY +
nisiam aBbUL RAGFian SHITHA MANAF
PRDDUCTIABPEIEATION ENGINEER [ENGINEERING MANAGER
'EPE POWER CORPORATION BERHAD
‘SYATCHGEAR DMASION