GS03 - Project Execution Schedule

The document outlines the project execution schedule for a specific project, detailing key activities from the issuance of the Letter of Award to testing and commissioning. It includes a list of activities such as site handover, engineering design, procurement, and erection processes. The schedule is to be submitted in both signed stamped PDF and editable .xlsx formats.

Uploaded by

pinak power
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views2 pages

GS03 - Project Execution Schedule

The document outlines the project execution schedule for a specific project, detailing key activities from the issuance of the Letter of Award to testing and commissioning. It includes a list of activities such as site handover, engineering design, procurement, and erection processes. The schedule is to be submitted in both signed stamped PDF and editable .xlsx formats.

Uploaded by

pinak power
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

GS03 - Project Execution Schedule

(to be submitted both as signed stamped pdf and editable .xlsx


formats)

SNo. Activity
1 Issuance of Letter of Award
2 Site handover/ NTP
3 Site Studies & Site Mobilization, Opening of Site Office & Preparatory
works
4 Basic Engineering Design- Layout, PVSyst, SLD
5 Long lead items (MMS, IDT, Switchgear) Procurement
6 Detailed Design & Engg. (Electrical, Civil & Structural)
7 Other Plant Equip/ Material Procurement
8 Electrical AC/ DC Erection
9 Civil Erection
10 Testing & Commissioning (including punch list)
Duration