Section Thru 'B - B'
Section Thru 'B - B'
100x100 WIDE
FLANGE
EAST MAIN CANAL
100x100 WIDE
150x150 WIDE FLANGE FLANGE
42.25M ELEV.
150mm x 50mm x 1.2mm Thick x
6.0m B.I. (Black Iron) Tubular 150x150 WIDE
370 FLANGE
650
52mm x 32mm (2" x 2") metal studs 42.50M ELEV.
598
framing sp. @ 40cm O.C and as 42.25M ELEV. 30
per the width of the wall cladding CONC.BEAM CONC.BEAM CONC.BEAM CONC.BEAM
531
CONC.BEAM CONC.BEAM CONC.BEAM CONC.BEAM
CONTROL ROOM ENCLOSED 200x200 WIDE CONTROL ROOM ENCLOSED 200x200 WIDE
FLANGE 4 4 FLANGE
300
W/ 5" THK. CHB ON PLASTER W/ 5" THK. CHB ON PLASTER
PAINTED FINISH (VERIFY PAINTED FINISH (VERIFY
COLOR) COLOR)
COPY TO EAST
CONTROL ROOM ELEVATION = 39.45M ELEVATION = 39.45M CONTROL ROOM
CONC.BEAM
20MM THICK SLAB
CONC.BEAM CONC.BEAM
20MM THICK SLAB
CONC.BEAM
OPERATION PLATFORM
3 3 OPERATION PLATFORM
CONC.BEAM
20MM THICK SLAB
CONC.BEAM
20MM THICK SLAB
CONC.BEAM CONC.BEAM
1220
1133 1133
2 2
ELEVATION = 36.40M ELEVATION = 36.40M
FOOT BRIDGE 20MM THICK SLAB 20MM THICK SLAB MAINTENANCE PLATFORM MAINTENANCE PLATFORM 20MM THICK SLAB 20MM THICK SLAB FOOT BRIDGE
CONC.BEAM CONC.BEAM CONC.BEAM CONC.BEAM CONC.BEAM CONC.BEAM CONC.BEAM
EL. 39.45M
EL. 33.35M EL. 33.35M
ELEV. 32.56M ELEV. 32.56M ELEV. 32.56M 1 OGEE CREST ELEV. 32.56M OGEE CREST ELEV. 32.56M 1 ELEV. 32.56M ELEV. 32.56M ELEV. 32.56M ELEV. 32.56M
1700
20
SECTION THRU 'B - B'
SCALE: 1:100m
30
@ 5-10cm, 5-20cm 45
Rest @ 30cm O.C.
4mm thick wall cladding
See Truss Detail (mini rib type) w/ 0.5mm thick x 52mm x 32mm (2"
4mm thick wall cladding
x 2") metal studs framing sp. @ 40cm O.C and as
(mini rib type) w/ 0.5mm thick x 52mm x
2-16mm Ø Bot. Bar
32mm (2" x 2") metal studs framing sp. @ I-BEAM per the width of the wall cladding
40cm O.C and as per the width of the wall 6mm (41") THICK X 4' X 8' Hot 150mm x 50mm x 1.2mm Thick x 6.0m B.I. (Black Iron)
WEST MAIN CANAL cladding Rolled Steel Chequered Plate Tubular Embedded in a 20cm x 20cm x 30cm depth
ASTM A36 BAR ABS GRADE concrete pedestal (extended from column)
B-1 DETAIL 369
150mm x 50mm x 1.2mm
wt= 140.03 kgs ( 140.03 kgs
150mm x 50mm x 1.5 mm
SCALE: 1:10m (308.71 lbs) 3 thick x 6.0m B.I. (Black
Thick x 6.0m B.I. (Black
Iron) Tubular Embedded in 150mm x 50mm x 1.5 mm iron) sp. as shown
598
75mm x 75mm x 6
mm thick x 6.0m
i4 150mm x 50mm x 1.2mm Thick x 6.0m B.I. (Black Iron)
Tubular Embedded in a 20cm x 20cm x 30cm depth
1
8 " x 8" x 8mm concrete pedestal (extended from column) Base of H-Beam Fully 3000 PSI R.C. Beam w/ 2 " Ø x 8" (L) x 1" (C) with 2"
Angle Bar welded on the surface of Thread length L-Type Anchor Bolt
H-Beam Post As per 150mm x 50mm x 1.5 mm 4-16mm Ø Hor. Bar Sp. as
the base plate in contact 8 " x 8" x 8mm H-Beam Post 6"x6"x 8.0mm thick (with nut and washer)
B-1 Contractors Plan 3 shon and 10mm Ø Stirrup sp.
B-1 B-1 B-1 thick x 6.0m B.I. (Black (Extended thru roof truss ) H-Beam
iron) sp. as shown 6"x6"x 8.0mm thick @ 5-10cm, 5-20cm Rest @ 30
300
See Stair Detail 300 (B-2) 30cm O.C.
H-Beam (B-2) Dowel bar Fully Welded on the
3 SEE COLUMN DETAILS 75mm x 75mm x 6mm thick angle
LANDING
Bar located as shown
75mm x 75mm x 6
mm thick x 6.0m 10mm Ø Dowel Bar sp. @ 30cm
Angle Bar Fully welded on exposed 20 O.C.
EL. 39.45M
12 mm Ø Vert. Dowel
B-1
1
2 " Ø x 8" (L) x 1" (C) with 2"
3000 PSI R.C. Beam w/ 4-16mm Ø 67 WEST MAIN CANAL
B-2
B-1
B-1
B-1 B-1 B-1 B-1 4-12mm Ø Hor. bar sp. as 125 133
150mm x 50mm x shown
150mm x 50mm x 16mmØ RSB
1.5 mm thick x 6.0m 75mm x 75mm x 6 iii 6"x6"x 8.0mm
1.5mm thick x 6.0m
B.I. (Black iron) sp. mm thick x 6.0m thick H-Beam 2-16mm Ø Bar bend as 436 (vertical bars)
B.I. (Black iron) sp. spaced @ 30cm
equally as shown Angle Bar shown
equally as shown O.C. B.W.
3-10mm Ø Bar sp equally
WEST MAIN CANAL as shown
SECTION " 5 " (FLOOR FRAMING)
SCALE: 1:70m 825 FLOW
EL. 33.13M
20 25
425 425 335 335 WEST MAIN CANAL
435 300
B-1 B-1 B-1 B-1 U/S APRON ELEV. = 30.51M
D/S APRON ELEV. = 30.21M
LANDING 93
210
3000 PSI
148 CONCRETE
B-1
B-2
400
B-1
B-2
B-2
B-1