The document outlines the general framework for Division 3 (Concrete) of the [Project Name] project, detailing requirements for concrete work, materials, mixing, placing, formwork, reinforcement, finishing, protection, and testing. It mandates compliance with relevant codes and standards, and emphasizes the contractor's responsibility for submittals and inspections to ensure quality. Specific procedures and material specifications are provided to ensure the integrity and durability of the concrete throughout the construction process.

Uploaded by

202240423
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views3 pages

Division 3

The document outlines the general framework for Division 3 (Concrete) of the [Project Name] project, detailing requirements for concrete work, materials, mixing, placing, formwork, reinforcement, finishing, protection, and testing. It mandates compliance with relevant codes and standards, and emphasizes the contractor's responsibility for submittals and inspections to ensure quality. Specific procedures and material specifications are provided to ensure the integrity and durability of the concrete throughout the construction process.

Uploaded by

202240423
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

General Framework for Division 3 (Concrete)

- Section 030000

- General: This section establishes the overarching requirements and guidelines for all concrete work
within the [Project Name] project. It mandates adherence to all relevant codes and standards, including
but not limited to ACI 301, [Local Building Codes], and any specific project requirements outlined in the
contract documents. All concrete materials, mixing procedures, placement techniques, and finishing
methods must conform to the detailed specifications outlined in subsequent sections. The contractor is
responsible for submitting detailed submittals, including mix designs, quality control plans, and
proposed construction sequences, for review and approval by the engineer. Regular inspections will be
conducted throughout the construction process to ensure compliance with these specifications and the
achievement of the desired concrete quality. Any deviations from these specifications require prior
written approval from the engineer.

- Section 031000

- Concrete Materials: This section details the precise specifications for all concrete materials used in the
[Project Name] project. The cement shall be Type I/II Portland cement, complying with ASTM C150, and
sourced from a reputable supplier approved by the engineer. Aggregates shall consist of [Aggregate
Type, e.g., crushed stone, gravel] meeting the gradation requirements specified in ASTM C33. The
maximum aggregate size shall be [Maximum Aggregate Size, e.g., 1 inch], and all aggregates must be
clean, free of deleterious materials, and conform to the specified limits for absorption and soundness.
Admixtures, including [Admixture Types, e.g., air-entraining admixture, water-reducing admixture], shall
be from approved suppliers and shall meet the requirements of ASTM C494. The water used for mixing
shall be potable and free of harmful impurities. All materials shall be subject to testing and inspection to
ensure they meet the required specifications.

- Section 032000

- Concrete Mixing and Placing: This section outlines the precise procedures for mixing and placing
concrete to ensure a homogenous and high-quality final product. Concrete shall be mixed in a batching
plant equipped with calibrated measuring devices to ensure accurate proportions of materials. The
mixing time shall be a minimum of [Mixing Time, e.g., 60 seconds] to ensure thorough blending of all
components. Concrete shall be transported to the site in approved trucks equipped with agitators to
prevent segregation and maintain workability. Placement shall be performed in a continuous manner,
avoiding interruptions to maintain consistency. Consolidation shall be achieved using [Consolidation
Methods, e.g., internal vibrators], ensuring the removal of entrapped air and the complete filling of all
formwork. Proper techniques will be used to prevent segregation and ensure proper placement around
reinforcement.

- Section 033000
- Concrete Formwork: The formwork for all concrete elements in the [Project Name] project shall be
constructed using [Formwork Material, e.g., pressure-treated lumber, steel forms] meeting the strength
and dimensional requirements specified in ACI 347. Forms shall be properly braced and supported to
prevent deflection and ensure the stability of the concrete during placement and curing. Formwork
shall be clean, free of debris, and properly oiled or treated to facilitate easy removal and prevent
adhesion to the concrete. Tolerances for formwork dimensions shall be strictly adhered to, ensuring the
accuracy of the final concrete elements. Formwork shall remain in place until the concrete has achieved
sufficient strength to support its own weight and resist any anticipated loads.

- Section 034000

- Concrete Reinforcement: This section specifies the requirements for reinforcing steel used in all
concrete elements. Reinforcing steel shall conform to ASTM A615, Grade [Reinforcement Grade, e.g.,
60], and shall be free of rust, scale, or other deleterious coatings. The placement of reinforcement shall
strictly follow the details shown on the structural drawings, ensuring proper spacing, cover, and
anchorage. All reinforcement shall be accurately positioned and secured using approved methods to
prevent displacement during concrete placement. Splices shall be made using approved methods,
ensuring adequate strength and continuity of the reinforcement. Regular inspections will be conducted
to verify the correct placement and integrity of the reinforcing steel.

- Section 035000

- Concrete Finishing: This section details the finishing requirements for all exposed concrete surfaces.
The finishing method shall be [Finishing Method, e.g., broomed, floated, troweled] as indicated on the
drawings, resulting in a uniform and aesthetically pleasing surface. Tolerances for surface irregularities
shall be strictly adhered to, ensuring a smooth and even finish. All finishing operations shall be
performed by qualified personnel using approved tools and techniques. Edges and corners shall be
rounded or chamfered as specified to minimize chipping and cracking. The final finish shall be free of
imperfections such as cracks, honeycombing, or excessive surface irregularities.

- Section 036000

- Concrete Protection: Protecting the concrete during and after placement is crucial for ensuring its
durability and longevity. Immediately after placement, the concrete shall be protected from premature
drying by [Curing Method, e.g., water curing, membrane curing], maintaining the required moisture
content for a minimum of [Curing Duration, e.g., 7 days]. During curing, the concrete shall be protected
from extreme temperatures, direct sunlight, and other environmental factors that could negatively
impact its strength and durability.

- Section 037000

- Concrete Testing: A comprehensive testing program is required to ensure the concrete meets the
specified requirements. This includes slump tests to verify workability, air content tests to ensure
proper air entrainment, and compressive strength tests to determine the concrete's ultimate strength.
The frequency of testing shall be as specified, with samples taken at regular intervals during the pouring
process. All testing shall be performed by a qualified testing laboratory, and the results shall be
submitted to the engineer for review and approval. Any concrete that fails to meet the specified
requirements shall be rejected and replaced.