Here are the correct answers to your multiple-choice questions categorized by topic for clarity:
---
Construction Documentation and Estimation
1. Shows items for construction with specs, quantity, and unit price:
✅ Bill of Quantity
2. Term/process for taking measurements and estimating civil works:
✅ Quantity Survey
3. Main purpose of costing or estimating:
✅ Identifying engineering estimate of the work for bidding purpose
(Also accepted: "Work out economical use of materials, labor and equipment’s")
4. Data required for masonry work cost estimation:
✅ Specification and rate of materials
5. True about work item measurements for BoQ:
✅ Deep excavation conducted for the stone foundation work is measured in m³
6. Measurement for steel bar in retaining walls:
✅ Measured in meter length from structural drawing
---
Quality & Project Management
7. Good project managers ensure quality control by:
✅ Maintaining the desired quality
8. Quality supervision cycle:
✅ Plan - Do - Check - Act
9. Management's response to unusable ideas:
✅ Being supportive while explaining how the idea is not right
10. Project time reduction results in:
✅ Increasing the direct cost and decreasing the indirect cost
11. Performing two or more activities independently:
✅ Resource Task Management Skill
12. Work schedule and resource assignment prepared by:
✅ Contractor
13. Project monitoring is required:
✅ At any stage of the project deemed necessary
14. Project manager needs communication to:
✅ Provide information and instructions
15. Quality control is:
✅ Monitoring specific project results to ensure compliance and improve quality
16. A team leader must:
✅ Define the problem properly
17. Organizing means:
✅ Establishing structural relationships to perform work effectively
---
Construction Materials and Methods
18. Reinforcement cover based on in ES EN2 2013:
✅ Exposure condition
19. Protective clothing for dust, grease, etc.:
✅ Overalls
20. Test for internal cracks and voids:
✅ Non-destructive test
21. Maintenance method for brickwork:
✅ Re-pointing of old brickwork
22. Leadership evidenced by:
✅ Supervisors understand the jobs of their subordinates
23. Post-demolition actions:
✅ Cleaning, storage and environmentally friendly waste management
24. Reason for brick's continued use:
✅ Retains its good appearance over a long period
25. Choice of masonry units depends on:
✅ Local availability, compressive strength, cost and durability
26. To retain excavated soil:
✅ Timbering
27. Structural clay units shaped, dried, and burned:
✅ Bricks
28. Mechanical characteristic of bricks:
✅ Flexure strength
29. Light and strong bricks needed because:
✅ Dense and heavy bricks conduct heat and sound at greater rate
30. Advantage of hollow bricks:
✅ Offer better insulation against heat and sound
31. Protect sides of trenches from collapsing:
✅ Providing timber or other boards
32. Give rough stone surface aesthetic appearance:
✅ Dressing
---
Construction Drawings and Elements
33. Drawing with cut lines for material details:
✅ Sectional drawing
34. Membrane to prevent ground moisture:
✅ Damp proofing course
35. Underside of eaves (roof component):
✅ Soffit
36. System of casting concrete in moulds off-site:
✅ Pre-cast structures
37. Temporary framework in construction:
✅ Scaffolding
38. Cavity walls act as:
✅ Insulating material
39. Line set by authorities for construction limit:
✅ Building Line
40. Water leaking from walls/floors is:
✅ Dampness
41. Best side for fresh air windows:
✅ Northern
42. Tool to cut soft bricks:
✅ Scutch
43. Wall width to thickness ratio:
✅6
44. Cement + sand + pebbles + water mixture:
✅ Cement Concrete
45. If vibrator fails during concreting:
✅ Add some amount of water and compact by hands
46. Temporary concrete support:
✅ Form work
47. Cement paste means:
✅ Chemical reaction when cement contacts water
---
Contract and Legal Aspects
48. Document defining legal rights and obligations:
✅ General Conditions of Contract
49. Stirrups spacing for economy:
✅ May be increased at mid-span
50. Economical reinforcement at mid-span:
✅ The number of stirrups will be decreased compared to support section
51. Purpose of Supplementary Conditions:
✅ Extend General Provisions to fit specific project
---