0% found this document useful (0 votes)
39 views7 pages

CV-Elmer Flores - v1 - English-1

Menambahajan untuk diamnilakan sebagaimana cara untuk mengatasi

Uploaded by

Sutar Miyaldi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views7 pages

CV-Elmer Flores - v1 - English-1

Menambahajan untuk diamnilakan sebagaimana cara untuk mengatasi

Uploaded by

Sutar Miyaldi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

Address: Av.

México N° 453 Cell phone: 945646158


Urb. Sta. Isolina – Comas –
Email:
Lima – Peru
ing.eflores@outlook.es / elmer.floresp@ciplima.org.pe

ELMER EDINSON
FLORES PONCE

INFORMATION Marital Status: Single Age: 34 years Availability: IMMEDIATE


STAFF: DNI: 46529917
Nationality: Peruvian

PROFILE I studied at the National University of Engineering - Graduated in Mechanical Engineering and registered with CIP Registration No.
STAFF: 205971, with experience in field teamwork and engineering software
for:

- Calculation and Analysis of Crane and Lifting Equipment Maneuvers in 2D, 3D and 4D BIM for low, medium and high tonnage.

- Calculation of Metallic Structures

- Calculation of pipes for transporting water, fire water, oil, gasoline, LPG gas, natural gas and sludge.

- 3D Modeling of the Disciplines Architecture, Civil, Concrete and Metal Structures,


Mechanical, Sanitary Installations, Piping, and Electrical Installations for Buildings and Industrial Plants.

Applied to Construction, Manufacturing, Installation, Assembly, Disassembly, Demolition, Maintenance, Planning and
Budgeting.

STUDIES NATIONAL UNIVERSITY OF ENGINEERING - Graduated Mechanical Engineer


COMPLETED:
- Mechanical Engineering Degree - 2006-II – 2011-I
- Project Management, Quality, Maintenance and HR - November 2013 – April 2014
- Residential, Commercial and Industrial Natural Gas - IG3-IPEGA - February – June 2025

BRITISH LANGUAGE - Intermediate English

COSAPI CORPORATE UNIVERSITY

- Soil Compaction - May – June 2014


- Risk Management in Construction - July – August 2014

ESAN UNIVERSITY

- International Diploma in Corporate Finance - June – December 2015

COLLEGE OF ENGINEERS OF PERU - Certified Mechanical Engineer

- TUITION - October 2017

- Technical Expertise in Engineering – November 2024


- Natural Gas Vehicle Projects (NGV) – December 2024

ELECTROTEC Electronics & Robotics

- Residential and Industrial Electrical Installations - August – September 2017

SALESTEC Salesian Technological Institute

- Hydraulics and Electrohydraulics Course - June – July 2018

ESGEP School of Energy and Petroleum Management

- Construction of Gas Stations - LPG Cars - March 2025

ESTRUCAD BIM Technical School

- Diploma in Piping Design for Industrial Plants - February – April 2025

CISold Welding Training Center

- Installation and Commissioning of Fire Protection Systems - February – March 2025


- Fire Network Design for Industries and Buildings - March 2025
EXPERIENCE
COMPANY: PRODICMONT INGENIEROS SAC (July 2023 – April 2025)
LABOR:
Position: Engineering Consultant and Maneuver Supervisor

Location: Lima

-Detailed Lifting Plan for the Construction of Access Bridge, Electrical Rooms and GIS Rooms, for the Intake Tower No. 04
and Platform No. 02 Project - Quellaveco-ANGLOAMERICAN.

Client: COSAPI
Project Manager: Carlos Espinoza
Construction Manager: Jorge Ramos

-Detailed Dismantling Plan for Demolition of Industrial Building Trusses, Bridge Crane, Roof Panels and Steel Lifeline and Support
Calculation Report for the Electromechanical Plant Dismantling Project - BARRICK.

Client: FLESAN
Construction Manager: Manuel Flores Head of
Planning: Roberto Pérez

-Procedure for the Construction and Supervision of High-Rise Pipelines Fire Fighting System of the 04 Fuel Tanks of ÿ26m x Height:
20m and the Suction and Discharge Piping of the Pump Room (Each 3000 GPM Pump), for the Jorge Chávez International Airport
Expansion and Remodeling Project - LAP Lima Airport Partners

Client: SIA TRADING


General Manager: Rolando Casaverde
Construction Manager: Josein Casaverde

-Calculation Report, 3D Modeling and General Arrangement Plans of 03 Entrance Porticos for Industrial Warehouse of Logistics P ark, for
the Expansion and Remodeling Project of the Jorge Chávez International Airport - LAP Lima Airport Partners

Client: E & P Engineering and Design


Project Manager: Edgar Blas Commercial
Manager: Eduardo Calero

-Assembly drawings for equipment on a Mercedes Benz truck chassis assembled with Putzmeister BSF36 Concrete Pump Truck
and Volkswagen Truck Assembled with Tanker Rosco Maximizer II Asphalt Paver - MT Service Area

Client: Metal Technique


Operations Manager: Arcenio Rodríguez
Services Department: Gerson Huayta

-Calculation Memory, 3D Modeling and Maintenance Platform Plans for Chiller and Maintenance Platform for Hopper, Dryer,
Vacuum Pump and Chiller Tank, for the Project Cover 2621 - San Miguel PET Industries

Client: Andes Solutions Group


Operations Manager: Edwin Villafuerte

- Calculation Memory, Simulation and Lighting Plans, Channeling, Grounding Well, Electrical Panels, Single-Line Diagram and CCTV
System for 02 Gabled Warehouses (Width: 18m x Length: 30m and Height: 6.2m), for the Asset Warehouse Implementation Project -
Cajamarquilla – NEXA

Client: V and P ICE


Chief of Operations: Robert Rosales
Head of Technical Office: Guillermo García
Supervision: CUMBRA
Electrical and Instrumentation Supervisor: Carlos Castillo
EXPERIENCE
COMPANY: COSAPI SA (September 2018 - June 2023)
LABOR:
Position: Mechanical Engineer of Construction, Planning and Budgeting

Chief: Engineer Juan Villar / Engineer Ricardo Rodriguez / Engineer Cesar Montalván

Location: Headquarters-San Isidro-Lima

- Construction and Lifting Plan for Budget of 10 Vertical Pumps (Length: 33m x 13t), Semi-portal Crane
(Capacity 8t), Access Bridge (Length: 43m x 36.3t), Access Bridge (Length: 52.7m x 43t), Electrical Rooms and GIS Rooms, for the Intake Tower No. 04 and
Platform No. 02 Project - Quellaveco-ANGLOAMERICAN.

-Construction and Lifting Plan for Budget of Flotation Cells, PipeRack, Bulk Rougher Cell, Thickener, Hydrocyclone, Filter Pre ss and Flocculant Building, for the
Electromechanical Works in Flotation Project, Regrind, Thickener and Filter – CHINALCO

-Construction and Lifting Plan for the Budget of a Carbon Steel Drive Line of ø22”x4.4km, Pumping Station (GEHO TZPM2000 Positive Displacement Pumps),
Dissipation Station and Electrical Equipment (Electrical Rooms), for the Civil Works, Assembly and Electromechanical Installations Project of the Tailings
Transport System Phase 2 – CHINALCO

-Construction and Lifting Plan for Budget of Main and Maintenance Barges, Electrical Rooms, Transformers and 36” and 42” HDPE Pipes - Recovered Water
System-ANTAMINA.

-Construction and Lifting Plan for Budget of Primary Crusher, Conveyor Belts, Gantries, Galleries, Stock Pile, Belt Feeder, Ba ll Mill, SAG Mill, Hydrocyclone
Nest, Friction Cells, Thickeners and Electrical Rooms - Electromechanical Plant-WORLEY NEXA.

-Construction and Lifting Plan for Budget of Primary Crusher, Secondary Crusher, Lime Silo, Overland Belt, Ore Bin, Tanks, Mai n Workshop and Thickener
Dismantling of Electromechanical Plant-BARRICK.

-Construction and Lifting Plan for Budget of Auxiliary Building Control Tower – Jorge Airport Expansion CHÁVEZ-LAP.

-Construction and Lifting Plan for Budget of Slat Thickener, Centrifugal Pumps, Positive Displacement, Tanks, Pipes, Hydrocyclone Nest and Electrical Rooms
– Quebrada Honda Multidisciplinary Works-SPCC.

-Construction and Lifting Plan for Budget of Semi-Mobile Crusher Building, Bridge Crane, Crusher Turntable, Apron Feeder, Gantries, Galleries, Semi-Mobile
Belts, Mobile Belts, Spreader-60m, Receiving Boom-90m, Mobile Belt Bridge-150m and Electrical Rooms – EPC Waste-1-ANTAMINA.

-Construction and Lifting Plan for the Budget of the Building's Metal Structure (High Quality Finish) – Center Recreational Student -UNIVERSITY OF LIMA.

-Construction and Lifting Plan for Bypass and Chimney Budget - 40m, HRSG Boiler, Chimney - 60m, Drums, Steam Turbine, Electric Generator,Transformer,
Pipe Rack, Ducts, Air Cooled Condenser and Electrical Rooms - Las Flores-SIEMENS Thermal Power Plant.

- Construction and Lifting Plan for Concentrate Warehouse Budget, Tripper, Flat and Tubular Belts,Porticos, Shiploader Galleries and Electrical Rooms – EPC
Port Facilities- Quellaveco- ANGLOAMERICAN.

-Construction and Lifting Plan for Budget of Primary Crusher, Conveyor Belts, Porticos, Galleries,Stock Pile, Apron Feeder, Be lt Feeder, Hydrocyclone Nest,
Gearless Ball Mill, Gearless SAG Mill, Bridge Crane, Concentrate and Tailings Thickeners, Vertical Mill, Friction Cells, Pipe Rack and Electrical Rooms –
Quebrada Blanca Concentrator Plant-QB2-CHILE-VP1-VP2-VP3-TECK.

-Construction and Lifting Plan for Budget of Primary Crusher, Conveyor Belts, Gantries, Galleries, Stock Pile, Belt Feeder, Hy drocyclone Nest, Gearless
Ball Mill, Gearless SAG Mill, Bridge Crane, Concentrate and Tailings Thickeners, Friction Cells, Pipe Rack and Electrical Roo ms – North Concentrator
Plant K170-K171-K172- ANGLOAMERICAN.
EXPERIENCE
COMPANY: PRODICMONT INGENIEROS SAC (March 2016 – August 2018)
LABOR:
Position: Mechanical Engineer of Construction, Planning and Budgeting

Location: Lima

-Manufacturing and Installation of Hydraulic Gates (Radial, Flat and Cofferdam), Mechanical Gate Lifting and Hoisting
System (Winch Type and Differential Type) and Electromechanical System for River Weed Removal for La Nueva
Achirana Intake, Facalá Intake and Bernales Intake.

-Design, Manufacture and Installation of a Lattice Structure for a Long Pedestrian Bridge: 15.2mx Width: 1m x Height: 1m.

-Design and Manufacture of an Oleo-hydraulic Formwork Machine for a Water Supply Tunnel with a Diameter of 2.5m x
Formwork Length of 6m – 08 de Agosto Hydroelectric Power Plant Project.

-Design and Manufacture of Vertical Tunnel Lifting System for Formwork of Balance Chimney with Diameter: 3m x Height:
88m – 08 de Agosto Hydroelectric Power Plant Project.

-Design, Manufacture and Installation of Gym for Urban Park (Bench for
Abdominals, Parallel Bars, Push-ups, Handrails, Ellipticals and Seesaw).

-Assembly and Installation of Embroidery Machines Length: 6.9m x Width: 1.95m x Height: 1.26m
x Weight: 3Ton.

-Design and Manufacture of Interior and Exterior Metal Molds for Formwork of Mailboxes
Concrete.

-Design and Manufacture of Metal Molds for Forming Sidewalks.

-Manufacturing and Installation of Swing Gate (02 Leaves) Width: 4.52m x Height: 4.02m
Material: Steel-Wood, with Anti-Panic System.

-Design and Manufacture of Tantric Chair for Hotels, Material: Steel-Upholstered.

-Construction and assembly of a 5-ton gantry crane and a 20-ton gantry crane.

- Manufacture and Installation of a 3-Ton Electronic Scale.

-Manufacture and Installation of a 9m^3 Cistern for Water for Human Consumption, with Disinfection certificate.

-Manufacturing and Installation of Stainless Steel Structures, Accessories and Furniture for the Company CINEPOLIS. Material:
Stainless Steel, Bronze, Nylon.

- Manufacturing and Installation of Stainless Steel Railings and Handrails – Length: 60m.

- Manufacturing and Installation of Spiral Staircase with Aluminum Steps.

- Manufacturing and Installation of 2-Leaf and 4-Leaf Industrial Swing Gates - Lurín.

-Manufacturing and Installation of a Non-Overflowing Swing Door Driven by a Gearmotor 1/2HP LiftMaster with Push Button - Lurín.

-Engineering of 02 2-leaf tilting industrial gates with mechanical lifting system - Length: 15m x Height: 6m - Lurín.

-Manufacturing and Installation of Electric Fence for Homes – Length: 16m.

-Maintenance of 150L and 90L Gas Cookers - FAGOR Brand and Gas Tilting Pans FAGOR brand.
EXPERIENCE COMPANY: COSAPI SA (November 2013 – February 2016)
LABOR:
Area: Critical Maneuvering Area

Chief: Eng. Jorge Pariona / Eng. Christian Ratto

Location: Headquarters-San Isidro-Lima

-Study and creation of SolidWorks plans for single and tandem lifting maneuvers of steel gantries with a maximum weight of 60 tons
using crawler and truck-mounted cranes.

-Study and Implementation of the Assembly Procedure for a 500m Long and 2.9m Wide Rubber Belt for a Conveyor Belt for
the Cerro Verde-Arequipa Project.

-Study and creation of SolidWorks plans for the simple lifting maneuvers of the top shell of the Constancia Project crusher.

-Study of Assembly Options and Creation of SolidWorks Plans for Simple Lifting Maneuvers for Prefabricated Concrete
Columns for the Construction of a Paper Mill in Chile - Forestal Papelera Concepción.

-Assembly and Construction Plan for the 600 Ton Reactors and Pipe Racks Structures of the Petroperú Project. 1,300-ton and
1,000-ton cranes.

-Planning, Construction, Operations and Safety Documentation of the Sulfuric Acid Plant Construction Project of the VOTORANTIM
METAIS Company.

-Operation of FRP (Fiberglass) Reactors, Modular Steel Porches (HT=60m), FRP Chimney, Stainless Steel Ducts (L=15m).
Supervision: AUSENCO.

COMPANY: COSAPI SA (May 2013 – November 2013)


EXPERIENCE
Project: Constancia-SMP (Structural, Mechanical & Piping)

Area: Maneuver Study Engineering

Chief: Eng. José Ramos

Project Location: Cusco

-Study and preparation of drawings in SolidWorks and AutoCAD for the simple lifting, tandem lifting, turning, verticalization,
transfer, loading and unloading of the parts or elements of 2 ball mills (ÿ26ftx41ft), 2 SAG mills (ÿ36ftx26.5ft), a 400t cra wler
lattice crane, a 200t hydraulic crane and a 16t tower crane, with a 50m boom and a 32m height.

-Selection of Lifting Elements (Shackles, Straps, Slings, etc.) for Simple Lifting, Tandem Lifting, Turning, Verticalization, Transfer,
Loading and Unloading of Project Equipment.

-Calculation of the balance beams and lifting lugs for simple lifting, tandem lifting, turning, verticalization, transfer, loading and
unloading of the project equipment.

-Study and Drawing in SolidWorks and AutoCAD of the Simple Lifting, Tandem, Turning, Verticalization, Transfer, Loading
and Unloading Maneuvers of the Parts or Elements of the Primary Gyratory Crusher 1600x3000 Traylor "TSU" (Length
6.6mx Width 6.6mx Height 10.7m) – FLSmidth, which as main parts were the following:

• Bottom Shell
• Middle Shell
• Top Shell
• Main Shaft Assembly
• Spider

The study of the maneuvers was carried out with the 500t hydraulic crane, 400t crawler crane, 200t hydraulic crane and bridge crane
of the Primary Crushing Building.

Supervision: AUSENCO. End Client: HUDBAY


EXPERIENCE COMPANY: COSAPI SA (February 2012 – May 2013)
LABOR:
Project: Expansion of Production Capacity-UNACEM

Area: Technical Office and Critical Maneuvers

Chief: Eng. Julio Gutiérrez / Eng. José Ramos

Project Location: Lima

-Measurement of fastening elements (bolts, nuts, washers, etc.), anchor bolts, Hilti resin, structural profiles, sheets, etc. for the
manufacture of metal structures (platforms, railings, racks, stairs, ducts, pipes, etc.).

-Manufacturing and Detail Drawings (AutoCAD, SolidWorks and Tekla Structures) of Steel Structures (Platforms, Railings, Racks,
Stairs, Ducts, Pipes, etc.).

-3D Modeling (SolidWorks and Tekla Structures) of Steel Structures (Platforms, Railings, Racks, Stairs, Ducts, Pipes, etc.) fo r
Manufacturing and Interference Detection with Existing Equipment in the Plant.

Calculation of Buckling of the Internal Bracings of Kiln 2 of Cementos Lima.

-Reinforcement Calculation of Structure 411EB1EB2 and 411EB3EB4 for the Assembly Maneuver of the Gearmotors.

-Verification by Structural Calculation of the Support (Portico) of the Twin Ducts for the Assembly of the 362EB2 Elevator
Gearmotors.

-Calculation of the Lifting Lugs for Section BC of Furnace 2 of 150 t.

-Calculation of Platform for Transfer of Axial Thrust of Furnace 2.

COMPANY: IG INTERNATIONAL SAC (August – December 2011)

-Engineering for the Implementation of New Measuring Bridges for the Measurement of Natural Gas Flow in Batteries, Compression
Stations and Production Wells of the PETROBRAS Company.

-Assistant/Supervisor of the Laying of HDPE Pipes DN 355 SDR 13.6 on the occasion of
Replacement of asbestos cement pipes for HDPE pipes for the New Rolling Mill Project – ACEROS AREQUIPA – PISCO.

COMPANY: ELECTROCOM INGENIEROS SAC (February – April 2011)

-Design and Manufacture of a Small 300 Kg Gantry Crane.

-Design and Manufacture of the Permanent Mold Support (Shell) for casting Staples 5 Bolt Anchor.

-Finite Element Analysis of Suspension and Anchoring Clamps for Low and Medium Towers Tension with its respective Tensile tests.

COMPANY: WATSON INGENIEROS SAC (January 2010 – January 2011)

-Design, Construction and Assembly of a Bridge Crane – 5 Ton.

-Design, Construction and Assembly of a 220L Fuel Storage Tank Gallons.

-Design and Construction of a Fruit and Vegetable Conveyor Belt.

-Design and Construction of an Impact/Abrasion Testing Machine for Protective Coatings.

-Design and Manufacture of Interior and Exterior Metal Molds for Drain Boxes (Material: Concrete).
KNOWLEDGE: -Office 365 (Word, Excel, Power Point) / MS Project

-SolidWorks 2024 / SolidWorks Simulation 2024 / SolidWorks Flow Simulation 2024 / SolidWorks

-Composer 2024 / SolidWorks Visualize 2024 / SolidWorks Piping 2024 / SolidWorks CAM 2024 -AutoCAD / AutoCAD Mechanical /
3D Studio Max / Fusion 360 / Tekla Structures

-Adobe Premiere Pro / Pinnacle Studio / CorelDRAW Graphics Suite 2021

-FluidSIM (Hydraulics, Pneumatics, Electrohydraulics and Electropneumatics)

-Revit 2025 / Advance Steel 2025 / AutoCAD 3D Plant 2025 / Navisworks Manage 2025

-SAP 2000 v25 / CAESAR II / AMETank / PV Elite / AutoPIPE / Elite Fire / AFT Fathom / AFT Arrow / AFT xStream / FluidFlow /
Pipe Flow Expert
SEMINARS: Induction

-Industrial Safety of the Cementos Lima Project – UNACEM -


-Industrial Safety of the Constancia Mine Project – HUDBAY
-Industrial Safety of the Acid Plant – VOTORANTIM
-Industrial Safety of the Jorge Chávez International Airport Expansion – FCC

Fair

- International Metalworking Fair - FIIMM – 2023 – Jockey Plaza


- International Construction Sector Exhibition - EXCON – 2023 – Jockey Plaza
- FIGAS & VEHIGAS International Fair – 2023 – Jockey Plaza
- EXPOMINA International Fair – 2024 – Jockey Plaza

Seminar

- Welding - 9°-10°-11°-12° - SOLDEXA – UNI

- Industrial Safety – 3M
- Scaffolding and Modular Towers – PERI
- Shackles – CROSBY GROUP
- Teamwork – 2019 - UCC
- Emotional Intelligence – 2019 - UCC
- Integrity – 2019 - UCC
- Energy and Dynamism – 2019 - UCC
- BIM Dynamics – 2019 - UCC
- People Development – 2019 - UCC
- Effective Communication – 2019 - UCC
ENTREPRENEURSHIP: YouTube Channel: Elmer Flores 3D

Description:
- In this channel we will make 3D Drawings based on the Industry with the help of the
3D Technology (3D Software, 3D Printing, 3D Scanning, Virtual Reality and Augmented Reality).

Link:

- https://youtube.com/channel/UC4b3blxDnernGKNB0u71h0w

3D Technology Courses and Services - 3D

Courses for Entrepreneurs and Businesses (In-Person and Virtual).


- 3D Construction Sequence with Equipment, Cranes and Maneuvering Elements.
- 3D Designs, 3D Videos, 2D and 3D Plans, 3D Marketing and Effort Simulations.
- 3D Printing, 3D Scanning, Reverse Engineering, Virtual and Augmented Reality.
- Reverse Engineering.
- CNC Laser Cutting and Engraving for Soft materials (MDF, Acrylic, etc.).

Engineers, technicians and professionals from the following companies have been trained in 3D software and 2D and 3D
maneuvers:
- JK Fire Solutions Electromechanical Systems
- Andes Solutions Group
- COSAPI
- United Techniques
- Romero Gruas
- ETAC Cranes and Equipment Cruz del Sur
- San Lorenzo Cranes and Transport
- SENATI

You might also like