INSTALLATION OF WATER COOLER IN FACTORY
SL.
DESCRIPTION REMARKS UNIT QTY RATE AMOUNT
No.
Supply, installation, testing & commissioning of aboveground PPR, PN 10, SDR11
(Polypropylene Random Copolymer Pipes) water supply pipes for RO water confirming to IS
1 15801 with All necessary fittings including supports, clamping, hanging arrangement, pipes
shall be of heat fusion with socket and punch with necessary dip galvanized clamps,
structural steel supports
a) 50 NB (OD-63 mm) Mtr 425
b) 25 NB (OD-32mm) Mtr 40
2 Fabrication and installation of base support for water cooler Nos. 4
Supply and installation of Brass body quarter turn lever operated ball valve with forged brass
3
hand, chrome plated ball, disc & gland packing shall be PTEF tested to 25 Kg/cm² pressure
a) 25 mm dia (Screwed ends) Nos. 4
4 Supply and installation of following items
a) angle cock Nos. 4
b) 15 mm dia SS braided flexible hose (600 mm length) Nos. 4
5 Supply & installation of following pipe sizes for drainage with necessary fittings
a) 15 mm dia PVC pipe Mtr 6
b) 40 mm dia PVC pipe Mtr 12
6 Supply, Installation ,testing and commissioning of Electrical equipments as per below
a 3Cx4.0 Sq mm Cu. Ar. cable Mtrs 220
b 3Cx4.0 Sqmm Cu Ar Cable Tarmination No 8
c 25mm G.I Conduit mtrs 50
d 6A/16A socket with 20A switch along with 3M Faceplate and 3M back box, Nos 4
e Scissor lifter (Height Works) lot 1
99 Service Network-RA-4 (20.Jan.24) Plumbing Work Takenaka India Pvt. Ltd. (OJI New Factory, Sricity, Tada)