Rab 2

The document is an RA Bill Index for M/S Bulk MRO Industrial Supply Pvt. Ltd. related to the supply and services of false flooring for substations at Vedanta Limited, Odisha. It includes various components such as invoices, certificates, and reports, detailing the job period from April 19, 2025, to June 30, 2025. The RA Bill No. is RAB-02, dated July 31, 2025.

Uploaded by

chandan07sahoo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views1 page

Rab 2

The document is an RA Bill Index for M/S Bulk MRO Industrial Supply Pvt. Ltd. related to the supply and services of false flooring for substations at Vedanta Limited, Odisha. It includes various components such as invoices, certificates, and reports, detailing the job period from April 19, 2025, to June 30, 2025. The RA Bill No. is RAB-02, dated July 31, 2025.

Uploaded by

chandan07sahoo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

R.A.

BILL INDEX
CONTRACTOR M/S Bulk MRO Industrial Supply Pvt. Ltd.
JOB NO. EXPANSION PROJECT
NAME OF WORK Supply and services of False Flooring for Substations across Alumina Refinery
CUSTOMER NAME VEDANTA LIMITED, LANJIGARH
NATURE OF WORK SUPPLY & SERVICE BILL
RA BILL NO. RAB-02
DATE 07.31.2025
PROJECT VEDANTA LIMITED, LANJIGARH, ODISHA
PO NO & DATE 57000000083 Dated : 27.01.2025
JOB PERIOD 19th Apr 2025 To 30th Jun 2025
PAGE NO. PAGE NO. TOTAL PAGE
SL NO. DESCRIPTION REMARKS
FROM TO NO.
1 Cover Letter
2 Tax Invoice
3 No Claim Certificate
4 Abstract Sheet of Payment
5 Abstract Sheet of Quantity
6 Measurement Summary Sheet
7 MDCC (Material Dispatch Clearance Certificate)
8 IMIR (Income Material Inspection Report)
9 MTC/Factory Clearance
10 Manufacturer Warranty Certificate
11 Vendor Warranty Certificate
12 Delivery Challan
13 Packing List
14 L.R Copy
15 Gate Entry Document
16 VL Weighment Slip
17 E-Way Bill
18 Supplier Tax Invoice
19 Approved Drawing
20 JMR (Joint Measurement Record)
21 Checklist
22 Material Issue Note
23 Work Completion Certificate
24 Handover Letter
25 MOM
26 Quality Score Card
27 H.S.E. Score Card
28 Material Approval
29 QAP (Quality Assurance Plan)
30 BOQ
31 PO (Purchase Order) Copy
32 Adhesive Use Approval
33 HR Clearance