A B C D
303.33 303.33 303.33
BEAM SCHEDULE :
920.00
SIZE BAR
1 1 MARK @ SUPPORTS @ MIDSPAN
B D DIA.
WB DIA STIRRUPS SPACING
cm cm cm TB-1 TB-2 BB-1 BB-2 TB-1 TB-2 BB-1 BB-2
320.00
BEAM-1/
310.00
15.2 25.4 16
300.00
TIE BEAM
SLAB ON FILL SUSPENDED SLAB ON FILL SLAB SCHEDULE :
SLAB ALONG SHORT DIRECTION SPACING (mm) ALONG SHORT DIRECTION SPACING (mm)
2 2 FLOOR BEAM
MARK LOCATION THK.
TYPICAL TYPICAL
171.00
CS/DE DE/MS CS MS
34.60
25.40
TOP
A B C D
15.00
S-1 15 TWO-WAY
BOTTOM
WALL-FOOTING/TIE BEAM
GROUND FLOOR PLAN
SCALE:
CROSS-SECTION THRU A-A
SCALE:
MMØ VERTICAL BARS
37.5 25 37.5 W/ MMØ LATERAL TIES
@ MM, @ MM,
REST @ MM ON
CENTER SPACING
320.00
NATURAL GRADE LINE
37.5
BACKFILL
FLOOR BEAM
171.00
34.60
100
100
25
25.40
NGL
15.00
MMØ BASE BARS
@ EQUAL SPACING B.W.
WALL-FOOTING/TIE BEAM
37.5
25
LONGITUDINAL SECTION THRU 2-2
SCALE:
SECTION
100 C1-F1
FOOTING PLAN DETAIL OF C1 AND F1
SCALE:
SCALE: