Mas BL 1F 01

The document contains construction notes and specifications related to masonry work, door and window openings, and structural details for a building project. It emphasizes compliance with Saudi Standards and requires submission of various materials for approval. Additionally, it includes dimensions and fire rating requirements for doors and walls, along with references to previous communications and design changes.

Uploaded by

h.hossam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views1 page

Mas BL 1F 01

The document contains construction notes and specifications related to masonry work, door and window openings, and structural details for a building project. It emphasizes compliance with Saudi Standards and requires submission of various materials for approval. Additionally, it includes dimensions and fire rating requirements for doors and walls, along with references to previous communications and design changes.

Uploaded by

h.hossam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7

M
44800

6000 7900 7550 8550 8600 6200

4200
AS EGO REQUIRE
CONSIDER THE FLU/STACK
WITHIN THE GENERATOR
General notes:
ROOM AREA * Assumed coordinated with MEP builders work.
* The comments on the related typical masonry general details "AR-BL-005" already submitted
once with its accessories and lintels schedule should be fulfilled. L
* Contractor to provide plan view, section & elevation of each type of masonry doors openings
scale 1/10 or 1/5.
* In order to match the exact design dimensions of door leaf opening, all the required details
must be taken into consideration (sub-frame thickness, plaster thickness, etc...).
* All internal doors jambs below 10 cm width should be minimum 6cm.
* All related materials to masonry (solid/hollow blocks accessories, fire resistant compressible
joint, etc...) should be submitted for approval.

4200
* Doors / windows openings dimensions should be defined as per Saudi Standards, material Hollow Block Wall
supplier & Design requirements (fire rated & non-fire rated).
* Refer to e-mail reply sent by Erga on 17/08/2023 concerning the doors openings dimensions.
* All shafts masonry walls should be solid blocks. Solid Block Wall
* As directed by the Client the Masonry plan was reviewed according to the new RFC (Arch
package) submitted by the Client; final approval is pending the Engineer/Designer validation.
* Refer to comments on layouts. Thickness of the Block Wall as Dimension in layout

Typical Door Lintel

3500
WA26 WA27 WA28 WA25 WA29 WA30 Typical Wall PILASTER
470 2030 2000 2000 2000 2000 2000 2000 LA07 2000 2025 2025 2025 2025
100 525
150

150 450 1800


600
170

170
J
250

250

250

250

500
750

450
450 2800 385 4015
1050 4100 450 3770 600 2900 2030 KEY PLAN
100

N
75
100

50
175

100 100 500 100


250 4000 7250 4550 3900 4900 250

2800
2550

2600
1 2 3 4 5 6 7
SLOPE 15%= SLOPE 18%= SLOPE 18%= SLOPE 15%=

44800
RAMP RAMP

WA26
6000 7900 UP TO GF 7550 8550 DOWN TO B-2 8600 6200

SLOPE CHANGE SLOPE CHANGE

2560
LINE LINE

M M

4200

4200
TH

4600
L 250
L
-4.00
T.O.C B01
4650

4200

4200
WA25 DORMITORY
K K
200

200

3500

3500
4125

200
1F18 250 J J

4600

4600
LA08

290
DORMITORY DORMITORY DORMITORY H
UP
TO GF
H

4200

4200
1F14 1F15 1F17 DORMITORY
ELEVATOR OPENING
DOWN
TO B2

G UP G
TO GF

1800

1800
300X200

1190
ELEVATOR OPENING

1F20 F
DOWN
TO B2 F

2200

47800

47800
+2.2 F.F.L

6000

6000
2450
2600

8200
300X200 DW13 PVC SLEEVE 75mm
E
TH
250
-4.00
T.O.C B01
E

8600

2400

2400
0.75hr IL= 2000mm F.F.L

100
220 300

300

H
+2.2 F.F.L D D

156300

5700

5700
150 450 5750 100X100 1000X300
LA06 250 WA28

1000
865
100

C C
300X200 +2.2 F.F.L +2.4 C.L
600
795

225 950 225


100 WA31
LA09
SLOPE 15%= SLOPE 18%= SLOPE 18%= SLOPE 15%=

+2.2 F.F.L

6700

6700
1325
RAMP RAMP
91

UP TO GF DOWN TO B-2
100

SLOPE CHANGE SLOPE CHANGE


LINE LINE

875
100

PVC SLEEVE 75mm 500X300 50 B B

PVC SLEEVE 100mm

585
300X200
1725

4500

4500
+2.4 C.L
IL= 2000mm F.F.L
DW13 IL= 2500mm F.F.L
900

900

+2.2 F.F.L
950

A A
1285

MEC. SHAFT

1000
0.75hr 188
1280
100

6000 7900 7550 8550 8600 6200


1730

44800

450 2700 1FM06 PVC SLEEVE 75mm 150 500

1150
100

1 2 3 4 5 6 7
130

1000
PVC SLEEVE 100mm
200
100

448 150 550X250 IL= 2400mm F.F.L


285

1125 5350 1175


100

1700X350
100

4200
2400
200

IL= 2500mm F.F.L


OFFICIAL STAMP :
3950

2935
194 299
362 300
100

2900

2900
900

900

DW13
+2.22 F.F.L +2.35 C.L
A APPROVED
100

250 1080
100
950

0.75hr 448 150 238 189 1500 ELECTRICAL ROOM


B APPROVED AS NOTED
100

500X350
1700

BATHROOMS 1F19 100

2100
293 542 Full Wall opening
Full Wall opening
DW14 1F16 500 150 350 to be closed later
600X200 +2.35 C.L
PVC SLEEVE 100mm
to be closed later +2.50 C.L 790 C REVISED &
900

900

PVC SLEEVE 75mm 0.5hr 500X350 800X350

500
width 900mm

500
IL= 2500mm F.F.L
RESUBMIT

1116
950

IL= 2000mm F.F.L width 500mm 500 1475 300 325 +2.35 C.L +2.35 C.L
DW13
3000

WA24 D REJECTED

100 100
+2.35 C.L 185 250 400
DORMITORY 475 600 325

400
150 100 0.75hr 1000

300
450
250

900X350
1F13 DORMITORY 100
G
100

100
500X300
450 127 1604 134 400 950 2550 900 1050 1F21
Wood door should be 0.75 hour fire 100
2950

550
+2.4 C.L
1650 950 300 300X200
rated as per FLS. 400X200 DS17 CORRIDOR
250X150 DW13 REVISION :

950
+2.5 C.L +2.50 C.L 1.5hr N/A 1F01 PVC SLEEVE 75mm
49 BEDS
1600X300 +2.22 F.F.L 0.75hr
Lifts openings dimensions

1800

1800
IL= 2400mm F.F.L 50
500X300 +2.2 F.F.L
should be coordinated 0 22/01/23 ISSUED FOR APPROVAL MI

2350
PVC SLEEVE 100mm FULLY OPENED

1200
+2.4 C.L
2500
950 700 1400 100 +6.300 F.F.L.
450X250 with Elevator's Supplier WA32
800

IL= 2500mm F.F.L ABOVE CEILING LEVEL

700
+6.200 C.L. 250 1 05/02/23 ISSUED FOR APPROVAL MI
100
100

550

500 +2.225mm F.F.L 2900 200 3450

200 334
100 250 383
F

100
200
100

2 08/02/23 ISSUED FOR APPROVAL MI

200
900 100 500 1200 1200 1200 1200 1200 500
250

400 2925
480

400 480

400 480

100

100
DW06

700
900
400

DW13 Full Wall opening


1080

1080

50

200
200
950

1hr to be closed later


30075300 400 320 400

0.75hr DS17
1050

width 400mm
1900

1.5hr REV.
DW13 LA10
2200
150

DATE DESCRIPTION CHECKED BY:

950

47800
400X300 0.75hr NO.
100X100 +2.4 C.L LOBBY
968

1000X350
LIFTS
2750

STAIR 01 1F29 THIS WALL REMOVE AS PER DORMITORY

3000
2.4 F.F.L
2400

2400
THIS DRAWING SHALL NOT BE USED FOR CONSTRUCTION
100

+2.35 C.L
PVC SLEEVE 75mm 300X200 1F06 EMMAR UPDATED PLAN 1F02 1F22
1000

4300
IL= 2000mm F.F.L
+2.5 C.L DW13 200 300 UNTIL CERTIFIED AND STAMPED.
400 5700 2000 WA24
950

0.75hr 204 143 850 150 375 250X150


3000

5300

DORMITORY
2900

FULLY OPENED
1306

300X200 +2.22 F.F.L


1730
1F12 Wall thickness should be 10 cm solid block ABOVE CEILING LEVEL PROJECT :

6000
+2400mm F.F.L
1400

300X200 BATHROOMS 300X200 to provide 2 hours fire rated as per FLS. Full Wall opening
to be closed later
100 50
PVC SLEEVE 100mm PVC SLEEVE 75mm
+2400mm F.F.L 1F11 800X350 +2.4 F.F.L
100 426 300

426 300

376 300

IL= 2000mm F.F.L


PALMS RESIDENCE

50
IL= 2400mm F.F.L width 1400mm

400
400

400

100
3750 +2.35 C.L
100

1000
725

DW11 +6.200 F.F.L.


100

WA50

1000
2350

84
1.5hr +5.900 C.L. 2900 200 2900
TOWER PROJECT
50

1350

MEC. SHAFT
800

800

800

SERVICE LOBBY STAIR 02


DW13 1FM01
1364 2189 1400 1048 50 (RIYADH-KSA)
1F04 1F03
950

0.75hr 900 900 900


2750

2750

2750
1300

SERVICE LIFT 1645

1000
DW07
250

250
1950

100 950
400

As EGO require 80cm width opening in Wall


1F05 FULLY OPENED 0.75hr
250

PVC SLEEVE 75mm From 35cm from Bottom of first floor slab
250 IL= 2000mm F.F.L
(to be closed later)
250X150 ABOVE CEILING LEVEL MEC. SHAFT
DW13 2900
326 300 442

150 162 1FM02 CLIENT :


0.75hr 3350 220 +2.22 F.F.L 200

100
400 200 0 500 250 1250
800

2280 2500 2700 900 6200


DORMITORY As EGO require shaft
E
158300

400
925

1F10
full opening in Wall modification as indicated
DS22 CW14
100

From 35cm from Bottom of first floor slab


400 (to be closed later) 1hr 250 383

4030
400

400

3750 200
100
800

150 100
WA23
300

2650 1100 950 900 1400 Wall thickness should be 10 cm solid block
500

500

500
300X200

1850
KITCHEN
3620

150 150 150 150


BUILDING OFFICE
900

900

2400
+2400mm F.F.L +7.000 F.L. to provide 2 hours fire rated as per FLS.
1100

1100

300X200 PVC SLEEVE 75mm 1F09


150

100 1F24
200

+2.4 F.F.L 950X350 MANAGEMENT


+2.0 F.F.L
DS15 3600 200 3600 PVC SLEEVE 75mm
2700

2402

2250
N/A +2.35 C.L OFFICES IL= 2000mm F.F.L 100 50 INVESTOR'S VISION COMPANY
2300

100 +6.250 F.F.L. TECHNICAL AREA MEC. SHAFT


150

1F23
1650

1650

300 600 200 1F08 1FM05 300X200 1920


100 370 1800 300 600 400 DS23 +6.200 C.L. +2.42 F.F.L 800X200
CONSULTANT / DESIGNER
4630 MEC. SHAFT
1050

600
DS11
150

As EGO require this wall to


N/A 100
D
100

1FM03 DS09 650 330 be fully opened +2.5 C.L


200

N/A 650 151 1770

100
150 450

N/A
600

50

100
200

2000 200 1900


150

207 301 300 250X200 CW15


100

1200
As EGO require further +2.42 F.F.L
1400 100 1700 100 450 4450 600 1200 100 3500 100 600 100 3060 CW13
1100

As EGo require complete opening for access section and this wall to
300X200 400 950 200
WA22 As EGO require access panel be built later
LA14 LA13
LA15 500X200
1830

+2.5 C.L
door to have access for the pipe work ELEC.SHAFT ELEC. SHAFT L.C. SHAFT GARBAGE CHUTE
100

500X200 2.42 F.F.L


BELOW 1FE01 1FE02 1F07 DW13 WA33

3150
+2.22 F.F.L
installations, cable pulling...etc with 1m width, Lifts walls types around openings W.C. 0.75hr 100 OFFICE
250
1000

1F29 100 1F25


starts 0.7m away from staircase wall.(to be should be defined & coordinated
KITCHENETTE
OFFICE CONTRACTOR :
200

with Elevators Supplier. 1F26 2050


262

closed later) 1F28

5700
2850
1100

PVC SLEEVE 75mm


LA12 1450 1450
800

800X350 IL= 2000mm F.F.L

+2.35 C.L
2700

200
100

400X350
822

1050
3000 400
+2.35 C.L

ARCHIVE
1F27 DW13
2000
950

50 0.75hr DRAWING DISCIPLINE/TYPE: SHOP DRAWING


3150 425 2150 625
1100
200

100 DRAWING TITLE :


450
100

100
C
100

X
FIRST FLOOR
50

WA33 WA34
LA11 IMA 12-02-2024
PLAN BLOCK LAYOUT

SHEET REV.
DRAWN CHECKED DATE SCALE DRAWING NO.
NO. NO.

M.K. (A0)
MI. 10/02/24
1:50
MAS-BL-1F-01 1 1 2