PHASE 01 – STARTING SOFTWARE AND INTERFACE
PHASE 04 – PLUMBING SYSTEM
   •   Starting Interface
                                                               •   Creating Levels for Plumbing
   •   Template Selection
                                                               •   Reference Level Creation for Sink
   •   Complete Interface Overview
                                                               •   Plumbing Fixture Placement
   •   Unit Settings
                                                               •   Water Supply Piping Routing
   •   Linking Architectural File
                                                               •   Inserting Pump for Water Supply & Connections
   •   Copying & Monitoring
                                                               •   Pump Connection with Overhead/Underground Tanks &
   •   Generating Levels                                           Source
   •   Creating Spaces                                         •   Valve Fixture Connections
                                                               •   Black Water (Soil Pipe) Routing to Septic Tank
PHASE 02 – HVAC SYSTEM
                                                               •   Water Drain Placement
   •   Defining Zones
                                                               •   Grey Water Piping & Connection to Sewage
   •   Heating & Cooling Load Calculation
   •   Placement of Supply Air Terminals (as per CFM)       PHASE 05 – FIRE FIGHTING SYSTEM
   •   VAV (Variable Air Volume) Placement                     •   Creating Separate Discipline for Fire Fighting (Floor & Ceiling
   •   Duct Routing for Supply System                              Plan)
   •   Duct Sizing                                             •   Duplication of Levels
   •   Duct Insulation & Lining                                •   Creating Filters for Fire Fighting Systems
   •   Damper Placement                                        •   Fire Piping Layout
   •   Return Air Placement & Duct Routing                     •   Sprinkler Grid System
   •   AHU System Design & Chiller Placement                   •   Sprinkler Placement
   •   Chiller Pump System (between Chiller & AHU)             •   Fire System Creation & Piping Routing
   •   AHU Connection with VAVs                                •   Inserting Fire Pump in Pump Room
   •   Duct Pressure Loss Report                               •   Inserting Jockey Pump
                                                               •   Expansion Tank Placement
PHASE 03 – ELECTRICAL SYSTEM                                   •   Fire Pump Room Design
   •   Creating Levels for Electrical Systems                  •   Valve & Pressure Gauge Placement
   •   Defining Parameters for Lux Value
   •   Lumens & Lux Calculations
   •   Electrical Load Calculations
   •   Lighting Fixture Placement (as per Lux Value)
   •   Switch & Receptacle Placement
   •   Lighting System Generation
   •   Panel Selection & Insertion
   •   Panel Schedule Creation & Power System Development
   •   Cable Tray Routing
   •   Conduit Routing