FLOOR TILING WORK CHECKLIST
TILING WORK
Project Name: -
Client: -
General Contractor: - Location: -
Grid: - Date: -
Drawing No: - RFI No: -
S. No. DESCRIPTION YES NO N/A
FLOOR
TILE WORK CHECKLIST
A Pre Execution Checks
1 Are all the required tools available at site?
The surface on which tiles to be laid made moist, free
2 from dust and other contaminations.
3 The plan / setting out for tiling done.
4 All the tiles are of required dimensions.
5 Chipped tiles not used for flooring
6 Button marks established for tiling
Tiles of different boxes of same batched mixed to
7 ensure uniform tonality.
8 Required number of tiles available at the site
Ceramic tiles cured before placing when fixing done
9 using cement mortar
Ceramic tiles cured before placing when fixing done
10 using adhesive
B During Execution Checks
Is correct laying procedure followed (like leveling
11 using rubber hammer and checking with spirit level
etc
Is the spacing of tile maintained using specified PVC
12 spacer
Cleaning of joints from loose mortar done
13 immediately after tile laying
Screed for floor tiling laid as per required slope and
14 level (in wet areas).
15 The skirting provided is in line and level
Slope of the tile is give as per the specifications (in
16 wet areas).
The tiles have been disturbed before the tile
17 adhesive has dried
Tile adhesive removed from the surface of tile using a
18 damp cloth while the tile adhesive is still wet
Is the freshly laid tiles are tapped gently, is there any
19 settlement?
C Post Execution Checks
20 Grouting done 24 hours after tiling
21 The joints are cleaned to remove the loose mortar
22 Are the joints properly aligned?
23 Any hollo sound heard while tapping the tiles
24 Right angles ensured at the corners of tiled surface
Excessive adhesive / cement coming out of tile joints
25 have been cleaned properly.
Observations if any:
Prepared By Checked By
SITE ENGINEER QA/QC ENGINEER MANAGER
Name: Name Name:
Signature: Signature: Signature:
Date: Date: Date:
REMARKS