CCC Corporate Presentation L

Consolidated Contractors Company (CCC), established in 1952 in Lebanon, employs around 110,000 people globally and is certified in ISO 14001, ISO 45001, and ISO 9001:2015, emphasizing health, safety, and quality. The company focuses on construction services and has a strong family-oriented culture that promotes loyalty and personal relationships with clients. CCC is recognized for its commitment to sustainability and has received awards for its green initiatives, while also maintaining a strong safety record in its operations.

Uploaded by

Drake bagyenda
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views137 pages

CCC Corporate Presentation L

Consolidated Contractors Company (CCC), established in 1952 in Lebanon, employs around 110,000 people globally and is certified in ISO 14001, ISO 45001, and ISO 9001:2015, emphasizing health, safety, and quality. The company focuses on construction services and has a strong family-oriented culture that promotes loyalty and personal relationships with clients. CCC is recognized for its commitment to sustainability and has received awards for its green initiatives, while also maintaining a strong safety record in its operations.

Uploaded by

Drake bagyenda
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 137

Company Introduction

Consolidated Contractors Company (CCC) was originally formed in 1952 in


Lebanon.

CCC currently employs approximately 110,000 people in its worldwide


operations.

CCC is an ISO 14001 and ISO 45001 certified company with the highest level
of commitment to HSE.

CCC is an ISO 9001:2015 certified company with the highest level of


commitment to Quality.

CCC is an ISO/IEC 27001:2013 certified company and applies the Information


Security Management System (ISMS) to all company activities.

CCC is predominately a construction company, providing project management,


engineering, procurement and construction services to the industry.

Currently ranked 1st in the Middle East and 17th in ENR Top International
Contractors (2019).

3
4
Our CCC Family
CCC is a family company with a unique set of culture
of values and traditions.

Our family culture embodies values, trust, loyalty and hard


work.

Our CCC family members are loyal to the company, and


many have dedicated their entire careers with us.

A main concept behind our family structured company is


having a personal relationship with the work as well as the
clients. We value the “human touch” in all aspects of our
approach as it facilitates a unique and well-cared for result.

CCC‘s strength emanates from our distinct culture; strong


and close relationships with our clients; our employees’
competence and loyalty; our entrepreneurial and flexible
management capability; our dynamism; our focus on quality
and safety and commercial acumen.

Our family values and traditions contribute to our long


term and successful mode of operations
5
Added Value

6
The CCC Commitment
At CCC, we believe that being a leader goes beyond our
commitment of offering innovative and quality excellence.
Our core family values define the principles of our global
operations and are transmitted through
• Placing our Clients' interests above our own
• Long term and Strategic Planning
• Quality Excellence
• Commitment to Safety
• Innovation in all aspects of our Work
• Leadership that spurs us to Success
• Strict adherence to Schedule
• Integrity in our Business and in our Actions
• Open Communication to build trust
• Commitment to the societies and the local communities where
we operate
• Preserving the environment and continually improving our
environmental performance
• Dedication to all the “CCC family members“ and providing
opportunities for our employees to grow and prosper

Our commitment to all our Clients is to be Second to None 7


Sustainability

Vision to lead in promoting green awareness and providing future


generations with a healthy and safe environment as well as social and
economic prosperity
Latest initiative in construction camps and project site facilities in the
Middle East:
– Energy Conservation (Renewable Energy) by utilizing solar powered lighting, solar
heaters and solar photovoltaic power plants
– Water Conservation by utilizing wastewater treatment plants and low flow sanitary
fixtures for all toilets
– The world's first mobile cabin of 24-hour energy autonomy, powered 100% by solar
power, has been successfully tested on the construction sites
CCC was awarded the NGO Best Green Initiative of the Year 2014 from
Middle East’s only sustainability award organization

8
Business Services
Services Provided Forms of Contract Industries

• QA/QC & HSE • Oil and Gas


• Refineries and
• Construction
Petrochemical
Management • Turnkey EPC Packages
• Power and Desalination
• Detailed Engineering • Reimbursable
Contracts Convertible • Mines and Smelters
• Procurement &
to Lump Sum Turnkey • Pipelines
Expediting
Contracts (CLSTK) • Water and Sewage
• Field Fabrication, Treatment
• Build / Own / Operate /
Construction &
Transfer (BOO / BOT / • Airports and Seaports
Installation
BOOT)
• Heavy Civil, Dams,
• Facilities Management • Design / Build with Reservoirs and
• Operations & Guaranteed Maximum Distribution Systems
Maintenance Price
• Road Networks
• Geographic Information • Re-measurable
• Skyscrapers
Systems
• Offshore Construction
• Environmental Projects 9
10
CCC Group Organization Chart

11
CCC Around the World

12
Major Ongoing Projects

13
Landmark Projects

14
Overall Project HSE Accomplishments in 2019
Particulars Projects Achieved
>10 Million Manhours without LTI 7 Projects
5‐10 Million Manhours without LTI 5 Projects
3‐5 Million Manhours without LTI 7 Projects
1‐3 Million Manhours without LTI 5 Projects

Summary of CCC Projects with achievements more than 15 Million Manhours ‐ 2019

CCA 35

JSRU 30

JSPP 20

MDP‐B 15

MDP4 15

UMRP 10

GAZ 10

0 5 10 15 20 25 30 35 40 45 50
16
Comparison of CCC & OGP HSE Statistics
Civil, Oil & Gas and Pipeline Projects
Annual Safety Statistics for CCC Projects Incident Rates CCC VS OGP
Total Total Direct Total Man‐ Frequency Rate Severity Rate Total Recordable Incident Rate
Occupational Year
Year Total LTIs Recordable Man‐hours Days Lost CCC OGP* CCC OGP* CCC OGP*
Fatalities
Cases Worked due to LTIs 2015 0.02 0.06 0.67 10.82 0.11 0.26
2015 36 207 4 393,773,720 1,317 2016 0.01 0.06 0.12 13.38 0.10 0.22
2016 13 243 1 474,368,902 283 2017 0.01 0.05 0.76 8.60 0.05 0.20
2018 0.01 0.05 0.66 10.92 0.04 0.21
2017 13 77 4 334,131,746 1,277 2019 0.01 N/A** 0.85 N/A** 0.06 N/A**
2018 14 70 4 333,600,765 1,105 TRIR Total recordable Rate for the Past Five Years
2019 8 66 4 226,748,122 965 CCC 0.07 OGP Contractors* 0.22
* OGP = International Oil and Gas Producers Association
Comparison between CCC & OGP
** 2019 Safety Indicator Data for OGP not yet issued
Frequency Rates Severity Rates Recordable Injury Rates

Formula used:
Severity Rate: Total Recordable Injury Rate (TRIR):
LTI Frequency Rate (LTI FR):
Total Lost Man Days x 200,000 Total No. of Recordable Cases x 200,000
No. of Lost Time Injury x 200,000
Total Man‐hours worked Total Man‐hours worked 17
Total Man‐hours worked
Comparison of CCC & OGP HSE Statistics
Oil & Gas and Pipeline Projects
Annual Safety Statistics for CCC Projects Incident Rates CCC VS OGP
Total Total Direct Total Man‐ LTI Frequency Rate Severity Rate Total Recordable Incident Rate
Occupational Year
Year Total LTIs Recordable Man‐hours Days Lost CCC OGP* CCC OGP* CCC OGP*
Fatalities
Cases Worked due to LTIs 2015 0.02 0.06 0.13 10.82 0.17 0.26
2016 0.00 0.06 0.08 13.38 0.09 0.22
2015 8 86 0 98,817,712 64
2017 0.01 0.05 0.41 8.60 0.02 0.20
2016 1 44 0 98,198,889 39 2018 0.01 0.05 0.40 10.92 0.04 0.21
2017 3 13 0 111,860,283 231 2019 0.01 N/A** 1.16 N/A** 0.09 N/A**
2018 5 23 1 110,195,909 219 TRIR Total recordable Rate for the Past Five Years
2019 5 31 1 67,213,530 390 CCC 0.08 OGP Contractors* 0.22
* OGP = International Oil and Gas Producers Association
Comparison between CCC & OGP
** 2019 Safety Indicator Data for OGP not yet issued
Frequency Rates Severity Rates Recordable Injury Rates

Formula used:
Severity Rate: Total Recordable Injury Rate (TRIR):
LTI Frequency Rate (LTI FR):
Total Lost Man Days x 200,000 Total No. of Recordable Cases x 200,000
No. of Lost Time Injury x 200,000
Total Man‐hours worked Total Man‐hours worked 18
Total Man‐hours worked
HSE Certificates & Awards

19
HSE Management System & Certification
Strict HSE policy with ultimate goal of Zero accidents
Management commitment to achieve this goal
Continuously assessed and certified with ISO 45001:2018 & ISO 14001:2015
Project specific HSE Management Plan and procedures in accordance with
clients’ HSE requirements are developed to be implemented on all project
activities

20
Quality Management & Certificates
Certified for ISO 9001 since 1993
Continuously assessed by Internal Auditors and the Certification Body Bureau
Veritas for the maintenance of the certification
Accredited by:
– The American Society of Mechanical Engineers (ASME) for the “A” and “PP” Stamps
– The National Board of Boiler and Pressure Vessel Inspectors (NB) for the “R” Stamp

22
Quality Management System Strengths
Corporate Quality Policy Statement Project Quality Policy Statement

23
Quality Management System Strengths
Mature quality management system
– Applied to over 450 projects in 43 countries for over 150 different clients
Detailed documented quality management system
Highly experienced & qualified QA/QC personnel
Strong in-house developed quality management controls systems
– Talisman, ATLAS & VBC dashboard
Proven schemes for continual improvement
– Quality readiness assessments
– Site quality walkthroughs
– Quality online training program
– Quality dashboard reporting & statistical analysis system
– Electronic client satisfaction questionnaire
– Suppliers & subcontractors performance evaluation system
– Lessons learned
– Risk management system
24
Quality Objectives & KPIs
Quality Objectives Quality Key Performance Indicators

The Engineering function objective


Engineering

is to obtain Client approval of all


engineering deliverables in timely
manner in accordance with
specified requirements
Procurement

The Procurement function objective


is to deliver materials in timely
manner in accordance with
approved material s request

The Construction function objective


Construction

is to complete installation works on


time in accordance with
acceptance quality criteria,
engineering instructions and
applicable codes and standards
25
Corporate Social Responsibility (CSR)
CSR is an integral part of the CCC Corporate Vision
CCC’s CSR Initiative undertakes the role of “Corporate Citizenship” to ensure
that business values and behavior are aligned to balance between improving
and developing CCC’s business, as well as improving the quality of life of the
workforce, their families, local communities and societies at large

CCC’s CSR Initiative includes programs related to:


• Environment
• Human Resources
• Workforce and Labor Relations
• Community Involvement
• Ethics and Anti-Corruption

CCC is a member of the following main Global CSR Initiatives:


• United Nations Global Compact – (UNGC)
• UN Global Compact Local Network – Hellas
• Global Business Coalition on HIV/AIDS, TB & Malaria – (GBC)
• Disaster Resource Network (DRN)
• Emirates Environmental Group – CSR Network
• Others 27
CCC Sales & Revenue (US$ Millions)

29
CCC Sales by Region & Client

30
CCC Group Total Manpower (Thousands)

32
CCC Group Workload Chart

33
Jan 2020

ELECTRIC GENERATORS EARTHMOVING PIPELAYING


& LIGHTING TOWERS EQUIPMENT EQUIPMENT
629 758 178

CIVIL ENGINEERING
& CONSTRUCTION EQUIPMENT
1,106
AIR WORK/SURVEY BOATS
COMPRESSORS & STANDARD FACILITIES
313 159
HEAVY DUTY
VEHICLES
1,523

WELDING MACHINES
CRANES VEHICLES 2,673
& LIGHT TRUCKS
546
1,971

TOTAL NO. OF EQUIPMENT: 9,856


TOTAL VALUE OF EQUIPMENT: US$ 830 MILLION
CCC Heavy Lift Division

CCC has been involved in the heavy lift business since 1980 empowered by a
professional team consisting of Engineers, draftsmen, specialists and
supervisors dedicated for this critical operation and following Company Safety
and Quality standards.

The Heavy Lift Division provides the following services:


• Heavy Lift turnkey project

• Heavy Lift Execution

• Heavy Lift Consultation

• Heavy Lift Management

• Heavy Lift Engineering

CCC owns 583 cranes with a capacity ranging from 5 to 1600 tons.

36
CCC Heavy Lift Operations

Type Capacity No.


DEMAG CC 8800-1 Crawler 1,600 T 1
DEMAG CC 2500-1 Crawler 450 T 2
DEMAG CC 2200 Crawler 350 T 1
DEMAG CC 1800-1 Crawler 350 T 2
DEMAG AC 350 Truck Mounted 350 T 2
MANITOWOC M250 Max-Er Crawler 400/225 T 1
DEMAG CC 1500 Crawler 300 T 1

The Highest Flare Stack The Heaviest Lift


Erected 200 m high Erected 2 Propylene
Derrick Flare Stack 28- Rectifiers. Each of 1,780
FL8401 using Demag Tons for the Rabigh
CC8800 at QGX Project – Development Project,
Qatar. Saudi Arabia

37
CCC Heavy Lift Operations

HAWIYAH NGL RUWAIS 3rd NGL KHURSANIYAH PROCESSING FACILITIES


500T - DEMETHANIZER 960T - DEMETHANIZER 468T - WATER OIL SEPARATOR

QATAR GAS EXPANSION SOHAR REFINERY OLEFINS 2 KUWAIT


1,400T - AGR ABSORBER 1,015T - REGENERATOR 255T - BOILER

38
Engineering & Procurement
Expertise
Oil & Gas Upstream, Midstream & Downstream
Gas Treatment, Dehydration Units
Flare & Gas Recovery Systems
Pipelines
Water Treatment, Cooling Water Networks

Engineering Procurement & Support Office Facilities


Total of 200 Engineers and Designers
Office Area: 7,680 m2 in Abu Dhabi UAE
Space for 400 plus staff & Client representatives

Current Annual Engineering Internal capacity


350,000 MHR
200,000 MHR (Pure Engineering)

40
Engineering & Procurement
Engineering Capabilities
Multidiscipline: Process; Loss Prevention; Mechanical Equipment; Piping; Pipelines;
Instruments/Controls/Telecoms; Electrical; Civil/Structural
FEED to Detailed Engineering for EPC
3D CAD capability: PDMS, SP3D, PDS

Engineering Technology

Oil and gas separation


Water and gas injection
Pipeline network
Gas treatment AGRU, dehydration unit DPCU
Gas separation process, LPG, NGL recovery
Sulphur recovery and granulation
Storage and handling system loading / unloading facilities
Utilities (water treatment, steam boiler, hot oil, cooling water, flare and flare gas
recovery, IA, N2, close drain, open drain, etc.)
Automation & Control Systems
Plant Civil, Structural, Mechanical & Electrical Installation
41
Engineering & Procurement
Engineering Design Software

Process: Piping: Instruments:


 HYSYS  Caesar II  SmartPlant Instruments
 PIPESIM  PDS/SP 3D/ PDMS  AVEVA Instruments
 Flarenet  SPOOL GEN  Instrucalc
 PipeNet  PC Cook
Design Visualization:
 HTRI Pipelines:  SmatPlant Review /
 PHA–PRO 7  Pipelines tool box Navis Works
 SP P&ID
 AVEVA P&ID Electrical: Drafting:
 ETAP / CYME  AutoCAD
Loss Prevention:  Microstation
 PHA Pro Civil/Structural:
 Pipenet Spray  Staad Pro Material Management:
Sprinkler  Foundation 3D  Marian
 Framework Plus Document Management:
Mechanical:
 LIMCON  EDMS-VBC
 PVElite
 MAT3D
 ECE
 GT Strudle
 Nozzle Pro
42
Engineering & Procurement
Global Procurement Capabilities

Sourcing Optimization Procurement Execution Compliance

Global
Sourcing Reduced Worldwide Global Systematic
strategies for Registered prices and network of logistics supplier
all categories vendors with capacity certified coordination/ performance
qualification booking inspectors leverage of score
ratings through multi- and pooling carding
Risk project
management expeditors opportunities
sourcing
versus low
cost country
Project Procurement Excellence Dashboard
sourcing

PO / Contract

Management

Management
Performance
Inspection/
Negotiation
Evaluation

Expediting

Logistics /
Strategies

Selection
Sourcing

Creation

Supplier
Material
Bidders

Bids

43
CCC Build Cairo - Engineering Support
Functions
CCC Build provides Engineering support for building projects in the following areas
– Shop drawings preparation (structural, architectural, MEP & Civil)
– Design Management
– Value Engineering
– Quantities Take Off
– Technical Support at Tendering and Construction stages

Facilities
Engineering Staff:
– Manager: 1
– Structural: 21 Engineers
– Architectural: 21 Architects
Total Staff 100
– MEP: 31 Engineers & Draftsmen
Support Staff:
– DCG / ISD / Administrative: 26 employees
Office Area: 750 m2 in Cairo

Current Annual Internal Capacity


Total Engineering Production Hours: 220,000 / year
44
Secure & Trusted Information Systems

CCC has a certified information security


management system (ISMS), in a framework
of policies and procedures that includes all
legal, physical and technical controls involved
in an organization’s information risk
management processes

CCC ensures:
– Commitment to security by CCC to its clients
and partners

– Legal and regulatory compliance

– Manages and minimizes risk exposure

– Commercial credibility, confidence and


assurance

– Enhanced customer satisfaction

– Protects the organization’s assets, shareholders


and customers
The CCC Full Project Controls

47
Communications Layout

48
Advanced Work Packaging/Workface Planning
AWP: A disciplined approach for project planning that is directed at the construction
workface. Coordinated Construction & Engineering work packages are developed
early-on to support path of construction
Key requirement is early collaboration between Engineering & Construction to ensure
that design & material are delivered with a sequence that supports construction. The
process ultimately ensures that all constraints have been addressed
WFP: The practice, by Contractor, to develop early detailed “constraint-free”
Installation Work Packages (IWPs) for site crews. This increased early preparation
should improve safety, productivity and predictability
Fabrication
Major clients in Oil & Gas, Energy and Chemical industry are mandating the
implementation of AWP/WFP
Construction Industry Institute (CII) reported more than 10% improvement in safety,
productivity, and quality

50
Workface Planning at CCC
In 2008, informal WFP implementation in a project led to 10% piping progress
improvement and 16% reduction in piping punch list items
In 2015, first formal implementation at the Rabab Harweel Integrated Project, Oman.
Received Shell award for best implementation. Project successfully completed on
time and within budget
CCC is currently implementing WFP in several major oil & gas projects
CCC has developed 3D database-driven software (C3D) to manage the creation of
IWPs, identify & clear constraints, plan IWPs, issue various work orders to different
crews and report progress Fabrication

CCC has been a major sponsor of AWP/WFP annual conference in Houston since
2014
CCC is a major contributor to advancing AWP/WFP practice through active
participation in several CII research teams

51
Building Information Modeling (BIM)
BIM Team Services:
• Scope management &
coordination
• Shop drawings production
• Constructability studies
• Planning & resource allocation
• Quality and safety
• Cost & progress control Fabrication

• Handover Management
• Invoicing
• Etc.

53
Building Information Modeling (BIM)
Systems Integration
BIM Capabilities:
• In-house BIM authoring capabilities (started
in 1998)
• 3 established BIM centers in Athens-Greece,
Cairo-Egypt & Ramallah-Palestine
• Several 5D/BIM based project control
implementation using in-house developed
system (C3D)
• Support of international standards (e.g. IFC,
COBie, ISO 15926)
• Recipient of several international awards

54
iRisk (Risk Management System)
Helps projects to implement an effective risk management process

Implements 4 Phases for managing Risk life-cycle

iRisk, builds over time, a database of risk information to assist a company to learn
from experience

56
Fabrication Facilities
CCC provides both mobile and permanent fabrication facilities.

Facility Type / Location Monthly Production

Mobile 40 Fabrication Pipe Spool Fabrication: 700 Tons Per Fabshop


Facilities Shops Steel Structure Fabrication: 300 Tons Per Fabshop

ECG Permanent Facility Pipe Spool Fabrication: 600 Tons


Facilities in Eq. Guinea Steel Structure Fabrication: 700 Tons
Rumaila Pipe Spool Fabrication: 1,800 Tons
Permanent Facility
Fabrication
in Iraq Steel Structure Fabrication: 3,000 Tons
Facility
Fabricating 240,000 MT/year of sophisticated
Yanda-CCC
Permanent Facility Modules/Skids, Cryogenic Cold Boxes, Pressure
Fabrication
in China Vessels and Structural Steel, together with
Facility
3.2 million inch-dia/year of pipe spools

58
Oil & Gas Projects
LNGs / GTL / Gas Plants /
Petrochemical

60
3GP Power Generation, Reception Area & Pressure Boost Facility MEI Works

Location: Tengiz, Kazakhstan


Client: TengizChevroil (TCO)
Modularized
Main Contractor: CCC construction
CCC Contract Value: US$ 612 Million strategy - 42
Completion Date: June 2022 modules up to
4,200 ton
Contract Duration: 47 Months
each
61
FGP - 3GP Civils & Core Substation, Site Preparation & Fencing

Location: Tengiz, Kazakhstan


Client: TengizChevroil (TCO)
Main Contractor: CCC
CCC Contract Value: US$ 634 Million
Completion Date: May 2020
Contract Duration: 72 Months

62
Jazan Projects (Packages 1, 2, 4, 5 & 13)*

Location: Saudi Arabia


Client: Saudi Aramco
The largest
Main Contractors: Snamprogetti, Petrofac & Hitachi gasifier-based
Total CCC Contract Value: US$ 1,371 Million (all 5 packages) power facility
Completion Date: September 2019 built in the
world
Contract Duration: 74 Months

63
* The Jazan Project will produce: 80 MMbbl/d gasoline, 250 MMbbl/d diesel and >1mtpa of benzene & paraxylene petrochemical products
Mina Abdullah EPC Package 1, Clean Fuels Project

Location: Kuwait
Client: Kuwait National Petroleum Co.
Main Contractor: Petrofac/Samsung/CB&I JV
CCC Contract Value: US$ 570 Million
Completion Date: December 2019
Contract Duration: 66 Months

64
Pearl GTL Project

Location: Ras Laffan, Qatar


Client: Qatar Shell GTL Ltd. (QSGTL)
Main Contractor: JGC / Kellogg Brown & Root Joint Venture The largest
Contract Value: US$ 1,369 Million
GTL Projects
in the
Completion Date: December 2011 World
Contract Duration: 57 Months

65
Al Khafji Field Development Phase I – Onshore Facilities (EPC)

Location: Saudi Arabia

Client: Al Khafji Joint Operations


Main Contractor: CCC
Contract Value: US$ 539 Million
Completion Date: August 2010
Contract Duration: 48 Months
66
Khursaniyah Gas Plant

Location: Khursaniyah, Saudi Arabia


Client: Saudi Aramco
Main Contractor: Bechtel / Technip Joint Venture 66 Million
Contract Value: US$ 1,118 Million Manhours
without LTI
Completion Date: August 2010
Contract Duration: 60 Months

67
Borouge - EPC Works for Ethylene Cracker 2 (EU2)

Location: Ruwais, Abu Dhabi, UAE


Client: Abu Dhabi Polymers Co. Ltd. (Borouge) One of
Main Contractor: Linde/CCC Consortium the largest
Contract Value: US$ 1,393 Million Ethylene
Crackers in
Completion Date: May 2010
the World
Contract Duration: 38 Months

68
RasGas Onshore / Onplot LNG Expansion (Trains 6 & 7)

Location: Ras Laffan, Qatar


Client: Ras Laffan Liquefied Natural Gas Co. (RasGas)
One of the
Main Contractor: Chiyoda / Technip Joint Venture largest LNG
Trains in the
Contract Value: US$ 590 Million
world with
Completion Date: November 2009 capacity of 7.8
MTPA
Contract Duration: 44 Months

69
Qatargas II LNG Onshore Facilities (Trains 4 & 5)

Location: Ras Laffan, Qatar


Client: Qatar Liquefied Gas Company II (Qatargas)
Constructed
Main Contractor: Chiyoda / Technip Joint Venture 30% of Total
Global
Contract Value: US$ 881 Million Forecasted
Completion Date: June 2009 Production
Capacity
Contract Duration: 48 Months

70
Isomerization and Refinery Revamp (EPC)

Location: Oman

Client: Oman Refinery Co.


Main Contractor: CCC
Contract Value: US$ 100 Million
Completion Date: March 2007
Contract Duration: 29 Months
71
Alba Phase II Expansion
Location: Bioko Island, Equatorial Guinea
Client: Marathon E.G. Production Ltd.
Main Contractor: CCC
Contract Value: US$ 119 Million
Completion Date: December 2004
Contract Duration: 24 Months

72
QAFCO IV Expansion Project, Ammonia/Urea Plant

Location: Qatar
Client: Qatar Fertilizer Company (QAFCO)
Main Contractor: Krupp Uhde
Contract Value: US$ 99 Million
Completion Date: April 2004
Contract Duration: 29 Months

73
Karachaganak Main Works

Location: Kazakhstan
Client: Karachaganak Petroleum Operating BV
Main Contractor CCC / Saipem Consortium
Contract Value: US$ 1,100 Million
Completion Date: December 2003
Contract Duration: 30 Months

74
Power Stations

75
Ras Al-Khair Power & Desalination Plant, Phase 1 - Package P

Location: Saudi Arabia

Client: Saline Water Conversion Corp. (SWCC)


Main Contractor: SEPCO III Electric Power Construction Corp. (China)
Contract Value: US$ 309 Million
Completion Date: February 2016
Contract Duration: 40 Months

76
Nubaria 750 MW Combined Cycle Power Plant Phase III

Location: Behaira, Khneiza Village, Egypt


Client: Middle Delta Electricity Production Company
Main Contractor: CCC / Misr Sons Development (Hassan Allam Sons) Joint Venture
Contract Value: US$ 68 Million
Completion Date: February 2010
Contract Duration: 34 Months
77
Rabigh Independent Water, Steam and Power Plant

Location: Rabigh, Saudi Arabia


Client: Rabigh Arabian Water & Electricity Co.

Main Contractor: Mitsubishi Heavy Industries


Contract Value: US$ 140 Million
Completion Date: November 2008
Contract Duration: 36 Months
78
Jebel Ali Power & Desalination Station ‘L’, Phase 1 – Civil Works

Location: Dubai, UAE


Client: Dubai Electricity & Water Authority
Main Contractor: Mitsubishi / Toshiba Joint Venture
Contract Value: US$ 101 Million
Completion Date: June 2007
Contract Duration: 47 Months
79
Cairo North 2 x 750 MW Power Station, Modules I & II

Location: Cairo, Egypt


Client: Cairo Electricity Production Co.
Joint Venture : CCC / Misr Sons Development (Hassan Allam Sons) Joint Venture
Contract Value: Module I - US$ 27 Million, Module II - US$ 23 Million
Completion Date: July 2006
Contract Duration: Module I - 28 Months, Module II – 25 Months
80
Ghazlan Power Plant, Phase II, Civil Works

Location: Ghazlan, Saudi Arabia


Client: Saudi Consolidated Electricity Co. (SCECO)
Main Contractor: Mitsubishi Heavy Industries Ltd.
Contract Value: US$ 126 Million
Completion Date: July 2003
Contract Duration: 68 Months
81
Renewable Energy

82
Will displace
6m liters of
diesel fuel
annually

EPC 16.6 MW Solar Photovoltaic (PV) Power Plants

Location: Mauritania

Client: Société Mauritanienne d'Électricité (SOMELEC)


Main Contractor: CCC
Contract Value: US$ 31 Million
Completion Date: February 2017
Contract Duration: 15 Months
83
DEWA 13 MW Solar Power Plant

Location: Dubai, UAE

Client: Dubai Water & Electricity Authority (DEWA)


Main Contractor: First Solar Inc.
Contract Value: US$ 15 Million
Completion Date: October 2013
Contract Duration: 9 Months
84
Pipelines

85
Lower Fars Heavy Oil Development Phase 1

Location: Kuwait

Client: Kuwait Oil Co.


Main Contractor: Petrofac/CCC Consortium
CCC Contract Value: US$ 778 Million
Completion Date: January 2020
Contract Duration: 60 Months
86
Fourth Transmission Pipeline EPC2

Location: Thailand

Client: PTT Public Co. Ltd.


Main Contractor: McConnell Dowell/CCC JV
Contract Value: US$ 252 Million
Completion Date: September 2015
Contract Duration: 18 Months
87
Australia Pacific LNG (APLNG) Pipeline

Location: Queensland, Australia

Client: Australia Pacific LNG Pty Ltd.


Main Contractor: CCC / McConnell Dowell Joint Venture
Contract Value: US$ 898 Million
Completion Date: May 2014
Contract Duration: 34 Months
88
QCLNG Export Pipeline - Narrows Crossing

Location: Queensland, Australia

Client: QCLNG Pipeline Pty Co. Ltd (BG Group)


Main Contractor: CCC / McConnell Dowell Joint Venture
Contract Value: US$ 320 Million
Completion Date: January 2014
Contract Duration: 41 Months
89
Sahil, Asab & Shah (SAS) Full Fields Development (EPC)

Location: Abu Dhabi, UAE

Client: Abu Dhabi Company for Onshore Oil Operations (ADCO)


Main Contractor: CCC / Tecnicas Reunidas Consortium
Contract Value: US$ 1,306 Million
Completion Date: October 2013
Contract Duration: 58 Months
90
Ambatovy Project - Nickel Slurry & Tailings Pipeline

Location: Madagascar

Client: Ambatovy Minerals SA


Main Contractor: SNC Lavalin
Contract Value: US$ 258 Million
Completion Date: December 2010
Contract Duration: 35 Months
91
Baku -Tbilisi - Ceyhan Oil Pipeline & South Caucasus Gas Export Pipeline (EPC)

Location: Azerbaijan

Client: Baku-Tbilisi-Ceyhan Pipeline Co. & South Caucasus Pipeline Co.


Main Contractor: CCC
Contract Value: US$ 380 Million
Completion Date: March 2006
Contract Duration: 36 Months
92
Ras Laffan Common Cooling Water System (EPC and O&M)
Location: Ras Laffan, Qatar

Client: Qatar Petroleum


Main Contractor: CCC
Contract Value: US$ 311 Million
Completion Date: EPC - March 2005, + 2 Year Operation & Maintenance
Contract Duration: 42 Months
93
Transportation

94
Qatar Metro Phase 2 – Msheireb & Education City Stations (Major Stations)

Location: Qatar
Location:
Client: Qatar Railways Co.
Client:
Contract
Main Value: CCC
Contractor:
Completion Date::
Contract Value US$ 572 Million
Contract Duration:
Completion Date : September 2019
Contract Duration: 32 Months

95
Riyadh Metro Project, Package 1 – Lines 1 & 2

Location:
Location: Riyadh, Saudi Arabia
Client:
Client: Arriyadh Development Authority (ADA)
Contract
Main Value:
Contractor: Bechtel / Almabani / CCC / Siemens Consortium
Completion Date::
Contract Value US$ 7,897 Million
Contract Duration:
Completion Date : April 2021
Contract Duration: 90 Months

96
Muscat International Airport Main Contract 1-Bridges, Runways, Roads & Utilities

Location: Muscat, Oman


Client: Ministry of Transport & Communications
Main Contractor: CCC / TAV Joint Venture
Contract Value: US$ 1,344 Million
Completion Date: December 2018
Contract Duration: 115 Months

97
IATA ‘A’ Level
of Service
3 Pearl Design
Rating

Abu Dhabi International Airport - Midfield Terminal Building

Location: Abu Dhabi, UAE


Client: Abu Dhabi Airports Co. (ADAC)
Main Contractor: CCC / TAV / Arabtec JV
Contract Value: US$ 4,833 Million
Completion Date: October 2019

Contract Duration: 86 Months


98
PNG LNG Project, EPC 5B Komo Airport & Infrastructure (EPC)
Location: Papua New Guinea

Client: Esso Highlands


Main Contractor: CCC / McConnell Dowell Joint Venture
Contract Value: US$ 513 Million
Completion Date: January 2013
Contract Duration: 37 Months
99
New Doha International Airport - Midfield Area Access System (EPC)

Location: Doha, Qatar

Client: New Doha International Airport (NDIA) Steering Committee


Main Contractor: CCC
Contract Value: US$ 344 Million
Completion Date: June 2014
Contract Duration: 85 Months
100
Beirut International Airport

Location: Beirut, Lebanon


Client: Ministry of Transport
Main Contractor: CCC / Hochtief Joint Venture
Contract Value: US$ 403 Million
Completion Date: October 2000
Contract Duration: 73 Months

101
New Port at Al Duqm - Maritime Works

Location: Duqm, Oman

Client: Ministry of Transport & Communications


Main Contractor: CCC / STFA (Turkey) Joint Venture
Contract Value: US$ 1,884 Million
Completion Date: January 2013
Contract Duration: 69 Months
102
Ras Laffan Port Expansion - Berths & Port Infrastructure (EPC)

Location:
Location: Ras Laffan, Qatar
Client:
Client: Qatar Petroleum
Contract
Main Value:
Contractor: CCC
Completion Date::
Contract Value US$ 1,801 Million
Contract Duration:
Completion Date : March 2012
Contract Duration: 48 Months

103
Upgrading of Mesaimeer Road

Location: Qatar
Location:
Client: Public Works Authority (ASHGHAL)
Client:
Contract
Main Value: CCC
Contractor:
Completion Date::
Contract Value US$ 462 Million
Contract Duration:
Completion Date : August 2021
Contract Duration: 42 Months

104
Design and Construction of Al Bustan Street North

Location: Qatar
Location:
Client: Public Works Authority (ASHGHAL)
Client:
Contract
Main Value: CCC
Contractor:
Completion Date::
Contract Value US$ 720 Million
Contract Duration:
Completion Date : December 2020
Contract Duration: 43 Months

105
Dukhan Highway

Location: Qatar
Location:
Client: Public Works Authority (ASHGHAL)
Client:
Contract
Main Value: CCC
Contractor:
Completion Date::
Contract Value US$ 810 Million
Contract Duration:
Completion Date : March 2018
Contract Duration: 83 Months

106
Lusail Development, Commercial Boulevard with Road A3, Underpass Tunnel

Location: Qatar
Location:
Client: Lusail Real Estate Development Co.
Client:
Contract
Main Value: CCC
Contractor:
Completion Date::
Contract Value US$ 246 Million
Contract Duration:
Completion Date : November 2018
Contract Duration: 46 Months

107
Batinah Expressway - Package 6

Location:
Location: Oman
Client:
Client: Ministry of Transport & Communications
Contract
Main Value:
Contractor: CCC
Completion Date::
Contract Value US$ 322 Million
Contract Duration:
Completion Date : November 2017
Contract Duration: 49 Months

108
Doha Expressway, Package 12 (F-Ring Road)

Location:
Location: Qatar
Client:
Client: Public Works Authority (ASHGHAL)
Contract
Main Value:
Contractor: CCC
Completion Date::
Contract Value US$ 274 Million
Contract Duration:
Completion Date : June 2015
Contract Duration: 50 Months

109
Wadi Dayqah Main & Saddle Dams

Location:
Location: Oman
Client:
Client: Ministry of Regional Municipalities, Environment & Water Resources
Contract
Main Value:
Contractor: Vinci/CCC JV
Completion Date::
Contract Value US$ 112 Million
Contract Duration:
Completion Date : October 2009
Contract Duration: 38 Months

110
Towers / Buildings

111
Msheireb Downtown Doha Phase 4

Location: Doha, Qatar


Client: Msheireb Properties
Joint Venture: CCC
Contract Value: US$ 524 Million
Completion Date: July 2020
Contract Duration: 44 Months
Mall of Oman - Main Works

Location: Muscat, Oman


Client: Majid Al Futtaim Properties (Oman) LLC
Joint Venture: CCC / Shapoorji Pallonji Mideast LLC
Contract Value: US$ 452 Million
Completion Date: February 2020
Contract Duration: 48 Months
City Center Al Zahia

Location: Sharjah, UAE


Client: Majid Al Futtaim Properties
Joint Venture: CCC
Contract Value: US$ 357 Million
Completion Date: April 2020
Contract Duration: 35 Months
Opera Grand Tower - Main Contract

Location: Dubai, UAE


Client: EMAAR Properties
Joint Venture: CCC
Contract Value: US$ 153 Million
Completion Date: June 2020
Contract Duration: 47 Months
City Center Almaza Project

Location: Cairo, Egypt


Client: Majid Al Futtaim Group
Joint Venture: CCC / Hassan Allam Construction
Contract Value: US$ 472 Million
Completion Date: October 2019
Contract Duration: 46 Months

116
Abu Dhabi Plaza, Package 4 – Main Works

Location: Astana, Kazakhstan


Client: Aldar EuroAsia LLP (ALDAR)
Main Contractor: CCC / Arabtec Joint Venture
Contract Value: US$ 1,373 Million
Completion Date: August 2020
Contract Duration: 89 Months

117
Forum El-Djazair, Zones 1 & 4, Residential Buildings & Villas

Location: Algiers, Algeria

Client: Société Algéro-Emiratie de Promotion Immobilière (EMIRAL)


Main Contractor: CCC / Drake & Scull Joint Venture
Contract Value: US$ 302 Million
Completion Date: June 2020
Contract Duration: 96 Months
118
Saraya Aqaba

Location: Aqaba, Jordan


Client: Saraya Aqaba Real Estate Development Co. PSC
Main Contractor: CCC / Drake & Scull / Arabtec Joint Venture
Contract Value: US$ 505 Million
Completion Date: December 2018
Contract Duration: 53 Months

119
Burj Vista

Location: Dubai, UAE


Client: EMAAR Properties
Main Contractor: CCC
Contract Value: US$ 231 Million
Completion Date: September 2018
Contract Duration: 51 Months

120
Nile Corniche Towers (St. Regis Hotel)

Location: Cairo, Egypt

Client: Qatari Diar Real Estate & Tourism Investment Co.


Main Contractor: CCC
Contract Value: US$ 524 Million
Completion Date: March 2018
Contract Duration: 89 Months
121
Opera House, Main Building Works

Location: Dubai, UAE


Client: EMAAR Properties
Main Contractor: CCC
Contract Value: US$ 211 Million
Completion Date: August 2016
Contract Duration: 33 Months
122
Faculty of Islamic Studies

Location: Doha, Qatar


Client: Qatar Foundation for Education, Science & Community Development
Contract Value: US$ 254 Million
Completion Date: May 2016
Contract Duration: 61 Months

123
Multipurpose Hall at Lusail Sports Club

Location: Lusail, Qatar


Client: Qatar Olympic Committee
Main Contractor: CCC
Contract Value: US$ 388 Million
Completion Date: April 2017
Contract Duration: 53 Months

124
The Landmark Tower

Location: Abu Dhabi, UAE


Client: The Department of the President’s Affairs
Main Contractor: CCC / Al Habtoor Engineering Enterprises Co. JV
Contract Value: US$ 431 Million
Completion Date: December 2012
Contract Duration: 69 Months
125
Barwa Commercial Avenue

Location: Doha, Qatar


Client: Barwa Real Estate Co.
Prime Contractor: Hochtief
CCC Contract Value: US$ 620 Million
Completion Date: June 2012
Contract Duration: 52 Months

126
Princess Nora Bint Abdul Rahman University for Women-Site Works Infrastructure & Utilities

Location: Riyadh, Saudi Arabia


Client: Ministry of Finance
Main Contractor: CCC / El Seif Eng. Contracting Co. JV
Contract Value: US$ 2,086 Million
Completion Date: August 2011
Contract Duration: 32 Months

127
The Dubai Mall

Location: Dubai, UAE


Client: Emaar Properties PJSC
Main Contractor: CCC / Dutco Balfour Beatty Joint Venture
Contract Value: US$ 1,306 Million
Completion Date: March 2009
Contract Duration: 56 Months

128
Sports Hall at Khalifa Sports City

Location: Doha, Qatar


Client: Aspire Logistics
Main Contractor: CCC / Murray & Roberts Joint Venture
Contract Value: US$ 161 Million
Completion Date: September 2005
Contract Duration: 26 Months

129
3D Printing Utilizing CyBe Robotic Arm Machinery

Location: Riyadh, Saudi Arabia


Client: National Housing Services Co.
The first
Main Contractor: CCC (Technology Provider: CyBe Construction) livable 3D
Contract Value: US$ - printed house
Completion Date: August 2018 in the world
Contract Duration: 3 Months

130
Healthcare

131
Sidra Medical & Research Centre, Completion of Design & Construction

Location: Qatar
Client: Qatar Foundation
Main Contractor: CCC/MIDMAC Joint Venture
Contract Value: US$ 738 Million
Completion Date: May 2018
Contract Duration: 46 Months

132
•King Hussein Cancer Center Outpatient Tower & East Tower, 3 – Main Works
Location: Jordan
Client: King Hussein Cancer Foundation
Main Contractor: CCC/Haddadin Engineering
Contract Value: US$ 14 Million
Completion Date: March 2017
Contract Duration: 35 Months

133
•Goulmima Dialysis Center
Location: Morocco
Client: Private Engineering Office
Main Contractor: CCC
Contract Value: US$ 66 Million
Completion Date: September 2016
Contract Duration: 27 Months

134
•Sheikh Khalifa Bin Zayed Al Nahyan Specialized Medical Centre – Main Works
Location: Casablanca, Morocco
Client: Khalifa Bin Zayed Al Nahyan Foundation
Main Contractor: CCC
Contract Value: US$ 100 Million
Completion Date: November 2014
Contract Duration: 39 Months

135
Advantages to Clients Using CCC Services
Excellent financial and management resources

Long term and current related experience

Top Management commitment to HSE&S, Quality and to Social Responsibility

“One” Address Company

Outstanding interface with Engineering

Availability of large multinational workforce

Vast resources and established procedures

In-house developed computerized programs for construction estimating cost


and schedule control

As a private company, CCC can provide unmatched flexibility in operations &


rapid decision making

Proven & strong record in new countries