0% found this document useful (0 votes)
26 views9 pages

Fsfsfs

Uploaded by

ashokkr.shivalik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views9 pages

Fsfsfs

Uploaded by

ashokkr.shivalik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

RAA

Job Amou
hg tetet
No nt (in vbb
lakhs)
1 hjh
Kn
353q53
xa
kn
a; bmnb
2 bv cscs Wor
353
1.375
251/ 53q53q fjsa’’lckk,,as Wor
3 HMK/03 ’;;,
2.750
251/ fjsa’’lckk,,as Wor
4 HMK/05 ’;;,
czczc 3.300
Wor
5 251/ 6 2.805
HMK/04 ggd
RSTC for construction of D-S-DBO roads Cl-9 surfaced specification from Km 210.00 to Km 255 (net len th 45.00 Km Wo
251/ 2.475 2.475
6 HMK/06
7 7879 08 1467.160 Wo

251/01
8 251/02 Provision of surfacin work bet Km 0.00 to Km 20.00 on Darbuk-Sh ok-DBO road. 898 362.200 Wo

Construction of DSR BB of 1 10' span at Km 6.900 and TSBB of 110' dasda. Wo


9 251/03 115.260 115.260

Scanned with OKEN Scanner


251/04 Construction of road Darbuk-Sh ok-DBO form Km 25.00 to km 50.00 as er Cl-9 s ecifications. 1271.560 1271.560 Wo

10
11 251105 Construction of DSR BB of 110' S an at Km 21.700 on Darbuk-Sh ok-DBO Road. 74.510 74.510 Wo

251106 Construction of BSB of 320' s an at Km 23.120 on road Darbuk-Sh ok-DBO. kkj 284.080 Wo

12
13 251107 Construction of road Dabruk-Sh ok-DBO from Km 144.00 to 154.00 as er Cl-9 s ecifications. kykuk 997.270 Wo

251/08 bbd 1697.310 1697.310 Wo

14
15 251/09 cbcb 895.250 1662.380 Wo
res

251/10 Provision of surfacin work bet Km 20.00 to Km 25.00 on Darbuk-Sh ok-DBO Road. 128.490 128.490 Wo

16
251/11 c 330.160 330.160 Wo

17
251/14 Construction of 400' BSB at Km 130.00 on road Darbuk-Sh ok-DBO. 388.960 388.960 Wo

18
251/15 Provision of surfacin work bet Km 35.00 to Km 45.00 on Darbuk-Sh ok-DBO Road. 289.820 289.820 Wo

19
Construction of road Darbuk-Shyok-DBO form Km 75.00 to km 100.00 as per Cl-9 specifications. 2379.660 Wo
251/16 1356.690 Co
20
251/17 Provision of surfacin work bet Km 45.00 to Km 55.00 on Darbuk-Sh ok-DBO Road. 436.980 439.980 Wo

21
Provision of Road bases surfacin work from Km 55.00 to 65.00 on Darbuk-Sh ok-DBO Road. 492.990 492.990 Wo

22 251/18

Scanned with OKEN Scanner


Construction of DSR BB of 120' s an at Km 64.500 on road Darbuk-Sh ok-DBO. 70.640 70.640 Wo

23 251/19
Construction of road Darbuk-Sh ok-DBO to CV9 s ecifications bet km 100.00 to 115.00. 1413.11 2212.760 W
0 re
24 251/21
25 251/22 Construction of road Darbuk-Sh ok-DBO to Cl-9 s ecification bet Km 115.00 to 130.00. 1807.50 2564.120 Wo
0 485.090 Co
Wo
Co
26 251/23 Provision of Road bases surfacin work from Km 65.00 to 75.00 on Darbuk-Sh ok-DBO Road. 485.090
work Km 75.00 to 85.00 on Darbuk-Sh ok-DBO Road. 579.02 W
0 994.130
27 251/24 Provision of Road bases surfacin from 646.10 1182. W
251/ Provision of Road bases surfacin work from Km 85.00 to 95.00 on Darbuk-Sh ok-DBO Road. 0 470 Co
25
28 Construction of DSR BB of 100' s an at Km 103.500 on road Darbuk-Sh ok-DBO. 194.10 194.100
251/ W
29 0 142.830
26 et
3 251/ Construction of DSR BB of 90' s an at Km 103.250 on Road Darbuk-Sh ok-DBO. ok-DBO. 142.83
0 27 0 W
222.22
0 222.220
31 251/ Construction of 140' TSR BB at Km 74.10 on road Darbuk-Sh 126.15 126.150 W
28 Construction of DSR BB of 80' S an at Km 76.00 on road Darbuk-Sh ok-DBO. 0

3 251/ 304.76 304.760 W


2 29 0
3 251/
30
3 Construction of 150'DDR BB at Km 115.00 on Road Darbuk-Sh ok-DBO.
Provision of road bases surfacin work Km 95.00 to 105.00 on road Darbuk-Sh ok-DBO. 788.990 1148. W
3 251/ 850 Co
4 31

Scanned with OKEN Scanner


:
AA Amount RAA Amount (in Remarks
(in lakhs) lakhs)

Job No Name of Job

35 251/32 Provision of road bases surfacin work Km 105.00 to 115.00 on road Darbuk-Sh ok-DBO. 832.080 1298.030 Work Com leted

36 251/33 Provision of road bass surfacin work km 115.00 to 125.00 on road Darbuk-Sh ok-DBO. 804.040 1489.230 Work Com leted

Constr of 03 Nos BB 120 Ft DSRBB, 150 Ft TSBB & 200 Ft DDRBB against initially sanctioned 02 Nos Work Completed
37 251/34 BBs 200 Ft DDRBB at Km 150.40 old Loc KM 138.00 on Road D-S-DBO 1906.420 1906.420

251/35 Constr of 60 m span Maj pmt Br Steel Super Structure (Through type) along with approaches at Km 449.690 449.690 Work Completed
38 21.70 on Road D-S-DBO

Construction of 40 m span major pmt bridge with steel super structure (through type) along with a Work under Progress
39 251/36 roaches at Km 9.80 on D-S-DBO 542.290 539.390

Construction of 40 m span major pmt bridge with steel super structure (through type) along with a Work Completed
40 251/37 roaches at Km 6.90 on D-S-DBO 549.140 650.620

41 251/38 Construction of road Dabruk-Sh ok-DBO from Km 154.00 to 180.00 as er CI-9 s ecifications. 3059.070 3059.070 Work Com leted

Construction of road Dabruk-Shyok-DBO from Km 180.00 to 210.00 as per Cl-9 specifications. Work Completed
42 251/39 5432.950 5432.950

43 251/40 IRMD Works between Km 34.200 to Km 44.100 due to multiple Cloud Burst on DS- DBO Rd 64.900 64.900 Work Completed

251/41 IRMD occurred at Km 44.90 and Km 124.750 on Road D-S-DBO 269.760 269.760 Work Com leted

Scanned with OKEN Scanner


45 251/43 Constr of 150' s an DDRBB at Km 101.250 on Rd DS-DBO. 256.720 256.720 Work Com leted

46 251/44 Construction of 120 m double s an ma•or mt brid e at Km 23.12 on D-S-DBO S-DBO 640.560 1654.830 Work under Pro ress

47 251/50 IRMD 2012-13 occurred at km 43.9 to 44.15 on D-S DBO road 40.090 40.090 Work Com leted

48 251/51 Provision of misc works between Km 50.00 to Km 154.00 on Road D-S DBO 2143.400 2143.400 Work Com leted

49 251/52 Construction of 150 Ft EWDDRBB 40 R at Km 137.00 on road D-S-DBO 297.420 297.420 Work Com leted

Phase Il works Entailing provisions of Cross drainage structures and river training works to provide all Work Completed
50 251/53 weather connectivit between Km 50.00 to 150.40 on Road D-SDBO 2286.810 2286.810

51 251/54 Pa ment of com ensation Land, buildin and tress for constrn/im vton Road D-S-DBO 2.560 2.560 Work Com leted

RAA Carrying out of SSI, micro pilling , submission of detailed SSI and pile testing report, design upto Work Completed
pile and constrn of dub structure consisting of pile Fdn (upto bottom of pile cap level for constrn of
super structure fora ro riates ecn
52 251/55 7299.160 9955.590

Mass crushing of stones into various size of aggregates and chips in general area of Km 148.00 On Work Completed
Road
D-S-DBO
53 251/56 2352.910 2352.910

Installation/Execution of one 20 KW Solar Power Plant of Km 27.700 for HQ 93 RCC and 2 Nos 10 KW Work Completed
54 A-209/06 Solar Power Plant for Dett Km 120 and Dett Km 148 on D-S-DBO Road in Leh Ladakh region of J&K 103.100 79.800
State
Procurement and erection of shelter for BRO personnel/Casual Paid Labour (CPL's) and equipments Work Completed
55 A-209/13 on D-S-DBO Road under project Himank in J&K State 4922.140 4922.140

Scanned with OKEN Scanner


Provision of furniture newly raised 50 BRTF and allied units deployed on D-S-DBO Road under project Work under progress
56 A-209/15 Himank in Leh Ladakh region of J&K state 68.950 68.950

Construction of 60 m span major pmt bridge with steel super structure (through type) along with a Work under progress
57 251/58 roaches at Km 124.75 on D-S-DBO 1101.550 1336.000

Construction of 60 m span major pmt bridge with steel super structure (through type) along with a Work Completed
58 251/59 roaches at Km 99.300 on D-S-DBO 2098.340 2098.340

59 251/60 AE for construction of road D-S-DBO to Cl-9 SBA between Km 210.00 to 254.90 9805.360 9300.450 Work under ro ress

:
RAA Amount (in Remarks
AA Amount
Job No Name of Job lakhs)
(in lakhs)
RAA for launching of 5 nos EWBB at various critical location (80 Ft at Km 153.00, 100 Ft at Km Work Completed
251/61 161.955, 100 Fc at Km 162.145, 100 Ft at Km 172.695, 130 Ft at Km 174.475 on Road D-S-DBO 636.690 1497.470
60
IRMD occurred due to heavy intensity of snow melting and flash flood bet Km 7.80 to Km 18.20 on Work Completed
61 251/62 Road D-S-DBO 71.560 71.560

62 IRMD occurred due to heavy intensity of snow melting and flash flood bet Km 7.05 to Km 7.30 on 74.810 Work Completed
251/63 Road DS-DBO 74.810

Corrigendum to AA for launching of 12 Nos EWBB at various critical location (170 Ft T DR EWBB at Work Completed
Km 188.00, IOOFt DSREWBB at Km 193.00. 180 Ft TDREWBB at Km 195.80, 180 Ft TDREWBB at km
63 251/65 4089.220 4598.900
196.800, 180 Ft TDREWBB at Km 203.00, 180 Ft TDREWBB at 245.55, 180 Ft TDREWBB at Km 247.40
and 90 Ft DSRWEBB at Km 254.255 On Road D-S-DBO
Provision of road bass surfacing work between km 139.00 to 144.00 by using Cementitious base and Work Completed
64 251/66 cementitious sub base with sami at the interface of cementitious base and bituminous layers as per 928.820 928.820
IRC 37-2012 on Road Darbuk-Sh ok-DBO.
Provision of road bass surfacing work between km 125.00 to 139.00 by using Cementitious base and Work Completed
65 251/67 cementitious sub base with sami at the interface of cementitious base and bituminous layers as per 2690.700 2690.700
IRC 37-2012 on Road Darbuk-Sh ok-DBO.

Scanned with OKEN Scanner


66 251/68 Provision of road bass surfacin work km 144.00 to 152.80 on road Darbuk-Sh ok-DBO 915.650 915.650 Work Com leted

67 251/69 Provision of surfacing works TO Cl-9 (SBA)surfaced spcen between km 154.00 to 164.00 on road Work Completed
Darbuk Sh ok-DBO. 1813.940 1813.940

68 251/70 Construction of 80 m span major pmt bridge with steel super structure (through type) open Work under progress
foundation and a roaches at Km 137.90 on D-S-DBO 1351.800 1539.250

69 251/72 Provision of surfacing works TO Cl-9 (SBA) surfaced spcen between km 164.00 to 180.00 on road Work under progress
Darbuk-Sh ok-DBO. 2783.170 2291.750

Corrigendum to Administrative Approval due to escalation charges and De-Linking of pay & Work Completed
Allowance for provision of surfacing works by using Cementitious base and cementitious sub base as
per IRC-37 of 2012 with sami at the interface of cementitious base and bituminous layersBetween 4119.380 4119.380
Km 210.00 to Km
70 251/73 929
.00 (Net length 12.00 Kms) on D-S-DBO road to Cl-9 SBA surfaced specification
Construction of Re -alignment of road D-S-DBO to NHSL specification *NHSL) bwtewvvn Km 9.950 and Work under progress.
251/74 Km 21.20 (Old Location , New location after Re alignement if Km 15.900) 9net Length of Re alignment 4689.720 4689.720
71 5.950 Kms in Leh Ladakh re ion Jammu & Kashmir state
Provision of surfacing work by using using Cementitious base and cementitious sub base as per IRC- Work under progress.
37 of 2012 with sami at the interface of cementitious base and bituminous layers to CL-9 (SBA)
72 251/75 4516.690 4516.690
specification between Km 242.00 (Revised Loc 243.250) to Km 254.900 (revised Loc Km 256.1500 on
Road D-SDBO.
73 251/77 Additional ermanent works between Km 30.00 and km 148.00 on D-S-DBO. 817.550 817.550 Work Com leted

Providing of Surfacing Works to Cl-9 (SBA) Specifications between Km 180.00 to Km 210.00 (New Loc Work under progress
Km 204.150) on Road D-S-DBO (Net Length 16.778 Kms) Excluding Slide Areas of 7.00 Kms) CSG Road
74 251/78 5929.590 5929.590
in Leh Ladakh re ion of J&K State.

Provision of surfacing works to using Cementitious base and Cementitious sub Base as per IRC-37, Work under progress
2012 with SAMI at the interface of Cementitious base and Bituminous layers between Km 222.00
75 251/82 (New loc Km 216.15) to Km 234.00 (New Loc km 228.15) (Net Length 12.00 Km) on D-S-DBO road to 4671.650 4671.650
Cl-9 (SBA) surfaced specification under 50 BRTF section Project Himank in Leh Ladakh region of J&K
state.

Scanned with OKEN Scanner


AA Amount (in RAA Amount (in
Job No Name of Job Remarks
lakhs) lakhs)
Providing of Surfacing Work to Cl-9 (SBA) Specifications between Km 234.500 to Km 242.000 (New loc Km Work under progress
251/84 5006.430 5006.430
228.650 to Km 243.250 on D-S-DBO road under 50 BRTF under ro•ect Himank
Design and constr of 60 mtr span Major pmt Bridge with steel super structure (through type) with open Work Completed
foundation over Murgo Nala with approches at Km 153.375 on D-S-DBO road under 113 RCC/HQ 50
BRTF/HMK in Leh Ladakh Region of J & K State.

251/81 4059.330 4059.330

Design and construction of 80 mtr span maj Pmt Bridge with steel superstructure (Deck type) with open Work under progress
251/80 foundation over India Gate Nailah at kmj 171.00 on D-S-DBO Road under 1445 BCC/ 50 BRTF (P) 1068.150 1068.150
Himank in Leh Ladakh re ion of J&K State
AE for upgradation of 10 BBrs to class 70R at Km 49.90, Km 61.00, Km 63.00, Km 101.00, Km 111.50, Km Work under progress
251/85 111.60, Km 111.80, Km 112.20, Km 130.00 and Km 142.00 on D-S-DBO rd (CSG) under 1445 BCC/50 BRTF 3602.620 3602.620
of Pro•ect Himank in Ladakh Union Territo
Provn of surfacing work at different location between Km 185.90 to Km 200.00 to Cl-9 specifications on Work Completed
251/86 2509.460 2509.460
road D-S-DBO
\-209/32 Security Fencing, Gates and RP Posts at Km 0.200 on D-S-DBO road for HQ 50 BRTF under Project Himank 78.960 78.960 Work under progress

LaunchingIDe-Launching Of 02 Nos Bailey Bridges Having Load Class Cl 40r And Ancillary Works Work under progress
Across River Shyok At Km 21.400 On Durbuk-Shyok-Dbo Road As An Alternate Arrangement To
251/87 520.440 520.440
BSB Of Load Class Cl-18r At Km 23.12 Under DG's Emergent Power In 50 BRTF/Project Himank In
Union Territo Of Ladakh
251/88 Approximate Estimate for Consultancy Sevices for Checking suitability of use of existing Abutments Piers 33.630 33.630 Work under progress
for upgradation of Existing Bridges to Cl-70R & suggest Remedial measures for
improvement]Strengthening of Existing Pier/Abutments & Design/Drawing of any new proposal of
Abutments/Piers at different location beyond Km 150.00 on D-S-DBO Road under 1445 BCC/50 TF of
Pro•ect Himank in Ladakh UT
Total 121588.680 132046.510

Scanned with OKEN Scanner


Cost over run 10457.830