Name of Work :- y[kuÅ cfy;k jkT;ekxZ ,l0,p0&34 ds fdeh0&188 ls 216 rd pkSM+hdj.k ,oa lqn`<hdj.k dk dk;ZA
Name of Contractor :- M/S Abhishek Builders                  C.B. No. 33/S.E./2016-17            Date :- 22.08.2016
                                                               4-7 izfr'kr
                                                                           Hkqxrku
                                                               ds vuqlkj              Hkqxrku        Lohd`r              12 izfr'kr
Øe                                                     vuqcfU              dh tkus                            fcuk VSDl                            vfrfjDr VSDl
                                                                vf/kd ds               dh x;h       vkx.ku ds           th0,l0Vh0     (Rg-Rv)/Rv
ka               dk;Z dk fooj.k                         /kr nj
                                                                vk/kkj ij
                                                                            okyh
                                                                                      /kujkf'k      vuqlkj nj
                                                                                                                dh nj
                                                                                                                          lfgr nj                   Hkkj enokj
d                                                                           ek=k
                                                                   nj
                                                                  (A)       (Q)        (A)X(Q)        (RV)        (B)        Rg          (C)        (A)x(Q)x(C)
1                          2                             3        4          5            6             7         8          9           10            11
1    Construction of Embankment with approved
     material obtained from right of way with all lifts
     and leads, transporting to site, spreading, 141.20          147.84   120251.35   17777526.68     146.60    142.40     159.49        0.09        1562870.15
     grading to required slope and compacting to
     meet requirement of Tables 300.1 and 300.2
2    Construction of Embankment with approved
     material obtained from right of way with all lifts
     and leads, transporting to site, spreading,
     grading to required slope and compacting to 141.20          147.84    1911.00     282515.36      146.60    142.40     159.49        0.09         24836.68
     meet requirement of Tables 300.1 and 300.2
     (For Patari)
3    Scarifiying existing bituminos surface by
     machanical means disposal of scarified material    4.10      4.29     4641.00     19922.42        4.40      4.25       4.76         0.08         1630.02
     within all lifts and leads up to 100m.
4    Construction of granular sub-base by providing
     close graded Material, spreding in uniform layer
     with moter grader on prepaired surface mixing
     by mix in place mathed with rotavator at OMC 2679.20       2805.12   29692.89    83292190.86    2731.70    2637.50    2954.00       0.08        6778143.29
     and compating with Vibratory roler to achive
     the deiser density complete as per clause 401
5    Providing, laying, spreading and compacting
     graded stone aggregate to wet mix macadam
     specification including premixing the Material
     with water at OMC in mechanical mix plant
     carriage of mixed Material by tipper to site,
     laying in uniform layers with paver in sub- 2955.60        3094.51   25486.33    78867784.60    3056.70    2950.80    3304.90       0.08        6403856.66
     base / base course on well prepared surface and
     compacting with vibratory roller to achieve the
     desired density.
6   Providing and applying primer coat with
    bitumen emulsion on prepared surface of
    granular Base including clearing of road surface
                                                        24.80    25.97    101196.00   2627614.86     23.50     20.00     22.40    -0.05   -122994.74
    and spraying primer at the rate of 0.60 kg/sqm
    using mechanical means.
7   Providing and applying tack coat-1 with
    bitumen emulsion using emulsion pressure
    distributor at the rate of 0.35 kg per sqm on the
                                                        13.20    13.82    84514.52    1168024.47     14.70     11.40     12.77    -0.13   -153511.79
    prepared bituminous/granular surface cleaned
    with mechanical broom.
8   Providing and applying Tack coat-2 with
    medium setting emulsion using V.G.-10 sprayer
    at the rate of 0.30 kg per sqm on the prepared      11.50    12.04    319676.18   3849061.05     12.70     9.90      11.09    -0.13   -488557.98
    surface cleaned by mechanical broom.
9   Providing and laying bituminous macadam with
    60-90 TPh hot mix plant producing an average
    output of 75 tonnes per hour using crushed
    aggergates of specified grading premixed with
    bituminous binder @ 3.4% of mix for 50-75 mm
    thickness transported to site laid over a 7344.30           7689.48    9368.77    72040981.52   7787.50   6913.60   7743.23   -0.01   -409516.55
    perviously prepared surface with paver finisher
    to the required grade level and alignment and
    rolled as per Clauses 501.6 and 501.7 to achieve
    the desired compaction.
10 Providing      and laying 50mm Dense graded
    bituminous macadam with 100 TPH batch type
    HMP producing an average output of 75 tonne
    per hour using crushed aggregates of specified
    grading, premixed with bituminous binder (VG-
    30) @ 4.5 per cent by weight of total mix and
    filler, transporting the hot mix kto work site,
    laying with a hydrostatic paver finisher with
    sencor control to the required grade, level and 8728.70     9138.95    6711.19    61333222.47   9133.90   7976.90   8934.13   -0.02   -1341448.95
    alignment , rolling with smooth wheeled,
    vibratory and tandem rollers to achieve the
    desired      compaction    as   per    MoRTH
    specifications Clause 507 complete in all
    respects.
11 Providing     and laying 30 mm Bituminous
     Concrete with 100 TPh HMP producing an
     avarage output of 75 tonnes per hour using
     crushed aggergates of specified grading,
     premixed with bituminous binder @5.4 per cent
     mix and filler, transporting the hot mix to work
     site, laying with a hydrostatic paver finisher
     with sensor control to the required grade, level 10033.10   10504.66   11771.92   123659966.53   10835.40   9281.40   10395.17        -0.04        -5024186.87
     and alignment rolling with smooth to achieve
     the desired compaction as per MORTH
     Specification Clause 509 complete in all
     respects including cost of all material, labour
     T&P etc as per directed by Engineer-in-charge.
12 Earth Work in excavation for foundation as per
   clause 301 of MoRTH Specification. For Drain       51.70       54.13     1065.98      57701.12      55.90      53.90     60.37          0.08           4611.96
13 PCC     1:3:6 in foundation with 40 mm gauge
                                                     5114.20     5354.57     104.53     559712.93     5128.90    4540.40   5085.25         -0.01          -4763.71
     brick ballast For Drain
14   Brick work 1:3 as per clause 1300 of MoRTH
     Specification.For Drain & Cluvert               6084.00     6369.95     300.85     1916367.01    5971.40    5147.20   5764.86         -0.03          -66282.41
15   12mm thick Plaster 1:4 as per         clause
     1300&2200 of MoRTH Specification.                114.00      119.36     170.40      20338.60      116.60    101.70     113.90         -0.02           -470.26
16   Supply ,Fitting and placing MS bar
     rainforcement in foundation complete as per
     drawing and Techinical Specification Clauses    4876.00     5105.17     33.84      172759.02     5015.00    4276.80   4790.02         -0.04          -7750.35
     100 and 1202(1485)
17 Supply & laying of 1000 mm Dia Hume Pipe          4516.00     4728.25     15.00       70923.78     4516.00    4516.00   5057.92         0.12           8510.85
18 R.C.C. M-25 as per clause 1500,1700 & 2100
   of MoRTH Specification.                           7288.90     7631.48     43.18      329527.23     7414.30    6412.90   7182.45         -0.03          -10304.62
                                                                                                                                             Total :-   7154671.39
        Contractor                              Junior Engineer                   Assistant Engineer                                 Executive Engineer
              th0,l0Vh0 ds dkj.k njksa ij izHkko ls vfrfjDr dj dh /kujkf'k dk fooj.k
Name of Work :- y[kuÅ cfy;k jkT;ekxZ ,l0,p0&34 ds fdeh0&188 ls 216 rd pkSM+hdj.k ,oa lqn`<hdj.k dk dk;ZA
Name of Contractor :- M/S Abhishek Builders                            C.B. No. 33/S.E./2016-17      Date :- 22.08.2016
                                                                 4-7   fnukad
                                                                                    Hkqxrku
                                                               izfr'kr 01-07-                vo'ks"k
                                                                                    dh tkus                                                           vfrfjDr
                                                                 ds    2017 ls              ek=k ftl           Lohd`r              12
                                                                                     okyh            Hkqxrku             fcuk
Øe                                                     vuqcf vuqlkj     iqoZ                    ij             vkx.ku            izfr'kr               VSDl
                                                                                      dqy             dh x;h            VSDl dh           (Rg-Rv)/Rv
ka               dk;Z dk fooj.k                        U/kr nj vf/kd Hkqxrk
                                                                                     ek=k
                                                                                            th0,l0Vh
                                                                                                     /kujkf'k
                                                                                                                 ds
                                                                                                                          nj
                                                                                                                                th0,l0Vh               Hkkj
d                                                                ds     u dh                  0 ns;           vuqlkj nj         0 lfgr nj              enokj
                                                                                    ¼vafre
                                                              vk/kkj ij x;h                   gSa
                                                                                    ckmpj½
                                                                  nj    ek=k
                                                                 (A)                           (Q)    (A)X(Q)   (RV)      (B)      Rg         (C)    (A)x(Q)x(C)
1                          2                             3       4         5           6        7         8           9        10        11       12       13
1    Construction of Embankment with approved
     material obtained from right of way with all lifts
     and leads, transporting to site, spreading, 141.20        147.84    41815.00     0.00     0.00   6181779.07    146.60    142.40    159.49    0.09   543456.81
     grading to required slope and compacting to
     meet requirement of Tables 300.1 and 300.2
2    Construction of Embankment with approved
     material obtained from right of way with all lifts
     and leads, transporting to site, spreading,
     grading to required slope and compacting to 141.20        147.84                 0.00     0.00      0.00       146.60    142.40    159.49    0.09      0.00
     meet requirement of Tables 300.1 and 300.2
     (For Patari)
3    Scarifiying existing bituminos surface by
     machanical means disposal of scarified material    4.10    4.29                  0.00     0.00      0.00        4.40      4.30      4.82     0.09      0.00
     within all lifts and leads up to 100m.
4    Construction of granular sub-base by providing
     close graded Material, spreding in uniform layer
     with moter grader on prepaired surface mixing
     by mix in place mathed with rotavator at OMC 2679.20      2805.12   6435.00      0.00     0.00   18050962.64   2731.70   2637.50   2954.00   0.08   1468949.37
     and compating with Vibratory roler to achive
     the deiser density complete as per clause 401
5   Providing, laying, spreading and compacting
    graded stone aggregate to wet mix macadam
    specification including premixing the Material
    with water at OMC in mechanical mix plant
    carriage of mixed Material by tipper to site,
    laying in uniform layers with paver in sub- 2955.60         3094.51   4875.00   0.00   0.00   15085751.85   3056.70   2950.80   3304.90   0.08    1224923.37
    base / base course on well prepared surface and
    compacting with vibratory roller to achieve the
    desired density.
6   Providing and applying primer coat with
    bitumen emulsion on prepared surface of
    granular Base including clearing of road surface
                                                        24.80    25.97              0.00   0.00      0.00        23.50     20.00     22.40    -0.05      0.00
    and spraying primer at the rate of 0.60 kg/sqm
    using mechanical means.
7   Providing and applying tack coat-1 with
    bitumen emulsion using emulsion pressure
    distributor at the rate of 0.35 kg per sqm on the
                                                        13.20    13.82              0.00   0.00      0.00        14.70     11.40     12.77    -0.13      0.00
    prepared bituminous/granular surface cleaned
    with mechanical broom.
8   Providing and applying Tack coat-2 with
    medium setting emulsion using V.G.-10 sprayer
    at the rate of 0.30 kg per sqm on the prepared      11.50    12.04              0.00   0.00      0.00        12.70     9.90      11.09    -0.13      0.00
    surface cleaned by mechanical broom.
9   Providing and laying bituminous macadam with
    60-90 TPh hot mix plant producing an average
    output of 75 tonnes per hour using crushed
    aggergates of specified grading premixed with
    bituminous binder @ 3.4% of mix for 50-75 mm
    thickness transported to site laid over a 7344.30           7689.48             0.00   0.00      0.00       7787.50   6913.60   7743.23   -0.01      0.00
    perviously prepared surface with paver finisher
    to the required grade level and alignment and
    rolled as per Clauses 501.6 and 501.7 to achieve
    the desired compaction.
10 Providing       and laying 50mm Dense graded
     bituminous macadam with 100 TPH batch type
     HMP producing an average output of 75 tonne
     per hour using crushed aggregates of specified
     grading, premixed with bituminous binder (VG-
     30) @ 4.5 per cent by weight of total mix and
     filler, transporting the hot mix kto work site,
     laying with a hydrostatic paver finisher with
     sencor control to the required grade, level and 8728.70   9138.95    0.00   0.00   0.00   9133.90    7976.80   8934.02    -0.02   0.00
     alignment , rolling with smooth wheeled,
     vibratory and tandem rollers to achieve the
     desired      compaction    as   per    MoRTH
     specifications Clause 507 complete in all
     respects.
11 Providing     and laying 30 mm Bituminous
     Concrete with 100 TPh HMP producing an
     avarage output of 75 tonnes per hour using
     crushed aggergates of specified grading,
     premixed with bituminous binder @5.4 per cent
     mix and filler, transporting the hot mix to work
     site, laying with a hydrostatic paver finisher
     with sensor control to the required grade, level 10033.10 10504.66   0.00   0.00   0.00   10835.40   9281.40   10395.17   -0.04   0.00
     and alignment rolling with smooth to achieve
     the desired compaction as per MORTH
     Specification Clause 509 complete in all
     respects including cost of all material, labour
     T&P etc as per directed by Engineer-in-charge.
12 Earth Work in excavation for foundation as per
   clause 301 of MoRTH Specification. For Drain      51.70      54.13     0.00   0.00   0.00    55.90      53.90     60.37     0.08    0.00
13 PCC     1:3:6 in foundation with 40 mm gauge
                                                    5114.20    5354.57    0.00   0.00   0.00   5128.90    4540.40   5085.25    -0.01   0.00
     brick ballast For Drain
14   Brick work 1:3 as per clause 1300 of MoRTH
     Specification.For Drain & Cluvert              6084.00    6369.95    0.00   0.00   0.00   5971.40    5335.60   5975.87    0.00    0.00
15   12mm thick Plaster 1:4 as per         clause
     1300&2200 of MoRTH Specification.              114.00     119.36     0.00   0.00   0.00    116.60    101.70     113.90    -0.02   0.00
16   Supply ,Fitting and placing MS bar
     rainforcement in foundation complete as per
     drawing and Techinical Specification Clauses   4876.00    5105.17    0.00   0.00   0.00   5015.00    4276.70   4789.90    -0.04   0.00
     100 and 1202(1485)
17 Supply & laying of 1000 mm Dia Hume      Pipe    4516.00    4728.25    0.00   0.00   0.00   4516.00    3717.12   4163.17    -0.08   0.00
18 R.C.C. M-25 as per   clause 1500,1700 & 2100
                                                7288.90   7631.48   0.00   0.00     0.00    7414.30   6412.90   7182.45      -0.03         0.00
    of MoRTH Specification.
                                                                                                                                Total :- 3237329.55
       Contractor                          Junior Engineer                   Assistant Engineer                           Executive Engineer
                             th0,l0Vh0 ds dkj.k njksa ij izHkko ls vfrfjDr dj dh /kujkf'k dk fooj.k
Name of Work :- y[kuÅ cfy;k jkT;ekxZ ,l0,p0&34 ds fdeh0&188 ls 216 rd pkSM+hdj.k ,oa lqn`<hdj.k dk dk;ZA
Name of Contractor :- M/S Abhishek Builders                                   C.B. No. 33/S.E./2016-17                                                                        Date :- 22.08.2016
                                                                   4-7   fnukad Hkqxrk
                                                                 izfr'kr 01-07-  u dh   vo'ks"k
                                                                                                                     vo'ks"k                                            vfrfjDr
                                                                   ds    2017 ls tkus ek=k ftl           LVkWd ls                Lohd`r              12
                                                                                                Hkqxrku            /kujkf'k ftl            fcuk
Øe                                                       vuqcfU/ vuqlkj   iqoZ   okyh      ij              nh x;h                vkx.ku            izfr'kr               VSDl
                                                                                                 dh x;h                 ij                VSDl dh           (Rg-Rv)/Rv
ka               dk;Z dk fooj.k                           kr nj   vf/kd Hkqxrk    dqy  th0,l0Vh
                                                                                                /kujkf'k
                                                                                                         lkexzh dk
                                                                                                                   th0,l0Vh0
                                                                                                                                   ds
                                                                                                                                            nj
                                                                                                                                                  th0,l0Vh               Hkkj
d                                                                  ds     u dh   ek=k    0 ns;              ewY;                vuqlkj nj         0 lfgr nj              enokj
                                                                                                                    ns; gSa
                                                                vk/kkj ij x;h   ¼vafre   gSa
                                                                    nj    ek=k ckmpj½
                                                                   (A)                    (Q)                        (A)X(Q)      (RV)      (B)      Rg         (C)    (A)x(Q)x(C)
1                           2                              3         4         5         6          7            8         9         10          11        12        13       14            15
1    Construction of Embankment with approved
     material obtained from right of way with all
     lifts and leads, transporting to site, spreading,
     grading to required slope and compacting to          141.20   147.84    41815.00 120251.35 78436.35     11595747.61   0.00   11595747.61   146.60    142.40    159.49     0.09      1019413.34
     meet requirement of Tables 300.1 and 300.2
2    Construction of Embankment with approved
     material obtained from right of way with all
     lifts and leads, transporting to site, spreading,
     grading to required slope and compacting to          141.20   147.84      0.00    1911.00    1911.00     282515.36    0.00    282515.36    146.60    142.40    159.49     0.09       24836.68
     meet requirement of Tables 300.1 and 300.2
     (For Patari)
3    Scarifiying existing bituminos surface by
     machanical means disposal of scarified                4.10     4.29       0.00    4641.00    4641.00     19922.42     0.00    19922.42      4.40      4.30      4.82      0.09        1883.57
     material within all lifts and leads up to 100m.
4    Construction of granular sub-base by
     providing close graded Material, spreding in
     uniform layer with moter grader on prepaired
     surface mixing by mix in place mathed with
     rotavator at OMC and compating with 2679.20                   2805.12   6435.00   29692.89   23257.89   65241228.22   0.00   65241228.22   2731.70   2637.50   2954.00    0.08      5309193.92
     Vibratory roler to achive the deiser density
     complete as per clause 401
5    Providing, laying, spreading and compacting
     graded stone aggregate to wet mix macadam
     specification including premixing the Material
     with water at OMC in mechanical mix plant
     carriage of mixed Material by tipper to site,
     laying in uniform layers with paver in sub- 2955.60           3094.51   4875.00   25486.33   20611.33   63782032.75   0.00   63782032.75   3056.70   2950.80   3304.90    0.08      5178933.29
     base / base course on well prepared surface
     and compacting with vibratory roller to
     achieve the desired density.
6   Providing and applying primer coat with
    bitumen emulsion on prepared surface of
    granular Base including clearing of road
                                                      24.80    25.97    0.00   101196.00 101196.00   2627614.86       0.00      2627614.86     23.50     20.00     22.40    -0.05   -122994.74
    surface and spraying primer at the rate of 0.60
    kg/sqm using mechanical means.
7   Providing and applying tack coat-1 with
    bitumen emulsion using emulsion pressure
    distributor at the rate of 0.35 kg per sqm on
    the prepared bituminous/granular surface          13.20    13.82    0.00   84514.52   84514.52   1168024.47    2096934.00   -928909.53     14.70     11.40     12.77    -0.13   122085.25
    cleaned with mechanical broom.
8   Providing and applying Tack coat-2 with
    medium setting emulsion using V.G.-10
    sprayer at the rate of 0.30 kg per sqm on the     11.50    12.04    0.00   319676.18 319676.18   3849061.05       0.00      3849061.05     12.70     9.90      11.09    -0.13   -488557.98
    prepared surface cleaned by mechanical
    broom.
9   Providing and laying bituminous macadam
    with 60-90 TPh hot mix plant producing an
    average output of 75 tonnes per hour using
    crushed aggergates of specified grading
    premixed with bituminous binder @ 3.4% of
    mix for 50-75 mm thickness transported to site 7344.30    7689.48   0.00    9368.77   9368.77    72040981.52      0.00      72040981.52   7787.50   6913.60   7743.23   -0.01   -409516.55
    laid over a perviously prepared surface with
    paver finisher to the required grade level and
    alignment and rolled as per Clauses 501.6 and
    501.7 to achieve the desired compaction.
10 Providing    and laying 50mm Dense graded
    bituminous macadam with 100 TPH batch
    type HMP producing an average output of 75
    tonne per hour using crushed aggregates of
    specified grading, premixed with bituminous
    binder (VG-30) @ 4.5 per cent by weight of
    total mix and filler, transporting the hot mix
    kto work site, laying with a hydrostatic paver
    finisher with sencor control to the required 8728.70      9138.95   0.00    6711.19   6711.19    61333222.47 13265756.00 48067466.47      9133.90   7976.80   8934.02   -0.02   -1051896.50
    grade, level and alignment , rolling with
    smooth wheeled, vibratory and tandem rollers
    to achieve the desired compaction as per
    MoRTH specifications Clause 507 complete
    in all respects.
11 Providing    and laying 30 mm Bituminous
    Concrete with 100 TPh HMP producing an
    avarage output of 75 tonnes per hour using
    crushed aggergates of specified grading,
    premixed with bituminous binder @5.4 per
    cent mix and filler, transporting the hot mix to
    work site, laying with a hydrostatic paver
    finisher with sensor control to the required
    grade, level and alignment rolling with smooth 10033.10 10504.66   0.00   11771.92   11771.92 123659966.53 17194160.00 106465806.53 10835.40   9281.40   10395.17   -0.04     -4325604.49
    to achieve the desired compaction as per
    MORTH Specification Clause 509 complete
    in all respects including cost of all material,
    labour T&P etc as per directed by Engineer-
    in-charge.
12 Earth  Work in excavation for foundation as
    per clause 301 of MoRTH Specification. For    51.70      54.13     0.00   1065.98    1065.98    57701.12      0.00      57701.12     55.90      53.90     60.37     0.08        4611.96
    Drain
13 PCC    1:3:6 in foundation with 40 mm gauge
                                               5114.20     5354.57     0.00    104.53     104.53   559712.93      0.00      559712.93   5128.90    4540.40   5085.25    -0.01       -4763.71
    brick ballast For Drain
14 Brick work 1:3 as per   clause 1300 of MoRTH
                                                6084.00    6369.95     0.00    300.85     300.85   1916367.01     0.00     1916367.01   5971.40    5335.60   5975.87    0.00        1435.17
    Specification.For Drain & Cluvert
15 12mm   thick Plaster 1:4 as per    clause
                                                 114.00     119.36     0.00    170.40     170.40    20338.60      0.00      20338.60     116.60    101.70     113.90    -0.02        -470.26
    1300&2200 of MoRTH Specification.
16 Supply     ,Fitting and placing MS bar
    rainforcement in foundation complete as per
    drawing and Techinical Specification Clauses 4876.00   5105.17     0.00    33.84      33.84    172759.02      0.00      172759.02   5015.00    4276.70   4789.90    -0.04       -7754.21
    100 and 1202(1485)
17 Supply & laying of 1000 mm Dia Hume    Pipe   4516.00   4728.25     0.00    15.00      15.00     70923.78      0.00      70923.78    3872.00    3717.12   4163.17    0.08        5333.47
18 R.C.C. M-25 as per clause 1500,1700 & 2100
                                              7288.90      7631.48     0.00    43.18      43.18    329527.23      0.00      329527.23   7414.30    6412.90   7182.45    -0.03       -10304.62
    of MoRTH Specification.
                                                                                                                                                                           Total :- 5245863.59
       Contractor                            Junior Engineer                                         Assistant Engineer                                      Executive Engineer
th0,l0Vh0 ds dkj.k njksa ij izHkko ls vfrfjDr dj dh /kujkf'k dk fooj.k
dk;Z dk uke &% y[kuÅ&cfy;k ¼,l0,p0&34½ ds fdeh0&188 ls 216 rd
pkSM+hdj.k
Name                  ,oa
     of Contractor :- M/S   lqn`<+hdj.k
                          Abhishek Builders dk dk;ZA
                                                   C.B. No. 33/S.E./2016-17 Date :- 22.08.2016
                                                                4-70 fnukad
                                                                                   Hkqxrku
                                                               izfr'kr 01-07-               vo'ks"k
                                                                                   dh tkus
                                                                 ds    2017 ls             ek=k ftl           Lohd`r              12
                                                                                    okyh            Hkqxrku             fcuk
Øe                                                     vuqcf vuqlkj     iqoZ                   ij             vkx.ku            izfr'kr               (Rg-    vfrfjDr VSDl
                                                                                     dqy             dh x;h            VSDl dh
ka               dk;Z dk fooj.k                        U/kr nj vf/kd Hkqxrk
                                                                                    ek=k
                                                                                           th0,l0Vh
                                                                                                    /kujkf'k
                                                                                                                ds
                                                                                                                         nj
                                                                                                                               th0,l0Vh              Rv)/Rv    Hkkj enokj
d                                                                ds     u dh                 0 ns;           vuqlkj nj         0 lfgr nj
                                                                                   ¼vafre
                                                              vk/kkj ij x;h                  gSa
                                                                                   ckmpj½
                                                                  nj    ek=k
                                                                 (A)                          (Q)    (A)X(Q)   (RV)      (B)      Rg                  (C)      (A)x(Q)x(C)
1                          2                             3       4         5          6         7            8           9        10        11        12          13
1    Construction of Embankment with approved
     material obtained from right of way with all lifts
     and leads, transporting to site, spreading, 141.20        147.84    41815.00 120251.35   78436.35   11595747.61   146.60    142.40    159.49     0.088     1019413.34
     grading to required slope and compacting to
     meet requirement of Tables 300.1 and 300.2
2    Construction of Embankment with approved
     material obtained from right of way with all lifts
     and leads, transporting to site, spreading,
     grading to required slope and compacting to 141.20        147.84               1911.00   1911.00     282515.36    146.60    142.40    159.49     0.088      24836.68
     meet requirement of Tables 300.1 and 300.2
     (For Patari)
3    Scarifiying existing bituminos surface by
     machanical means disposal of scarified material    4.10    4.29                4641.00   4641.00     19922.42      4.40      4.30      4.82      0.095      1883.57
     within all lifts and leads up to 100m.
4    Construction of granular sub-base by providing
     close graded Material, spreding in uniform layer
     with moter grader on prepaired surface mixing
     by mix in place mathed with rotavator at OMC 2679.20      2805.12   6435.00   29692.89   23257.89   65241228.22   2731.70   2637.50   2954.00    0.081     5309193.92
     and compating with Vibratory roler to achive
     the deiser density complete as per clause 401
5    Providing, laying, spreading and compacting
     graded stone aggregate to wet mix macadam
     specification including premixing the Material
     with water at OMC in mechanical mix plant
     carriage of mixed Material by tipper to site,
     laying in uniform layers with paver in sub- 2955.60        3094.51   4875.00   25486.33   20611.33   63782032.75   3056.70   2950.80   3304.90   0.081    5178933.29
     base / base course on well prepared surface and
     compacting with vibratory roller to achieve the
     desired density.
6    Providing and applying primer coat with
     bitumen emulsion on prepared surface of
     granular Base including clearing of road surface
                                                        24.80    25.97              101196.00 101196.00   2627614.86     23.50     20.00     22.40    -0.047   -122994.74
     and spraying primer at the rate of 0.60 kg/sqm
     using mechanical means.
7A Providing and applying tack coat-1 with
   bitumen emulsion using emulsion pressure
   distributor at the rate of 0.35 kg per sqm on the    13.20    13.82               8343.10   8343.10     115304.98     14.70     11.40     12.77    -0.131   -15154.37
   prepared bituminous/granular surface cleaned
   with mechanical broom.(Including cost of
   Bitumen)
7B Providing and applying tack coat-1 with
   bitumen emulsion using emulsion pressure
   distributor at the rate of 0.35 kg per sqm on the
                                                        1.00     1.00               76171.42   76171.42    76171.42      1.00      1.00      1.12     0.120     9140.57
   prepared bituminous/granular surface cleaned
   with mechanical broom. (Excluding cost of
   Bitumen)
8A Providing    and applying Tack coat-2 with
   medium setting emulsion using V.G.-10 sprayer
   at the rate of 0.30 kg per sqm on the prepared       11.50    12.04              230809.52 230809.52   2779062.03     12.70     9.90      11.09    -0.127   -352743.94
   surface cleaned by mechanical broom.(Including
   cost of Bitumen)
8B Providing and applying Tack coat-2 with
   medium setting emulsion using V.G.-10 sprayer
   at the rate of 0.30 kg per sqm on the prepared       1.00     1.00               88866.66   88866.66    88866.66      1.00      1.00      1.12     0.120     10664.00
   surface cleaned by mechanical broom.
   (Excluding cost of Bitumen)
9    Providing and laying bituminous macadam with
     60-90 TPh hot mix plant producing an average
     output of 75 tonnes per hour using crushed
     aggergates of specified grading premixed with
     bituminous binder @ 3.4% of mix for 50-75 mm
     thickness transported to site laid over a 7344.30          7689.48             9368.769   9368.769   72040981.52   7787.50   6913.60   7743.23   -0.006   -409516.55
     perviously prepared surface with paver finisher
     to the required grade level and alignment and
     rolled as per Clauses 501.6 and 501.7 to achieve
     the desired compaction.
10 Providing     and laying 50mm Dense graded
   bituminous macadam with 100 TPH batch type
 A
   HMP producing an average output of 75 tonne
   per hour using crushed aggregates of specified
   grading, premixed with bituminous binder (VG-
   30) @ 4.5 per cent by weight of total mix and
   filler, transporting the hot mix kto work site,
   laying with a hydrostatic paver finisher with
                                                   8728.70   9138.95   3881.80   3881.80   35475571.84   9133.90    7976.80   8934.02    -0.022   -776338.61
   sencor control to the required grade, level and
   alignment , rolling with smooth wheeled,
   vibratory and tandem rollers to achieve the
   desired      compaction     as   per   MoRTH
   specifications Clause 507 complete in all
   respects.(Including cost of Bitumen)
10 Providing     and laying 50mm Dense graded
   bituminous macadam with 100 TPH batch type
 B
   HMP producing an average output of 75 tonne
   per hour using crushed aggregates of specified
   grading, premixed with bituminous binder (VG-
   30) @ 4.5 per cent by weight of total mix and
   filler, transporting the hot mix kto work site,
   laying with a hydrostatic paver finisher with
   sencor control to the required grade, level and 4959.80   4959.80   2829.39   2829.39   14033208.52   4959.80    4788.00   5362.56    0.081    1139565.12
   alignment , rolling with smooth wheeled,
   vibratory and tandem rollers to achieve the
   desired      compaction    as   per    MoRTH
   specifications Clause 507 complete in all
   respects.(Excluding cost of Bitumen)
11 Providing and laying 30 mm Bituminous
   Concrete with 100 TPh HMP producing an
 A
     avarage output of 75 tonnes per hour using
     crushed aggergates of specified grading,
     premixed with bituminous binder @5.4 per cent
     mix and filler, transporting the hot mix to work
     site, laying with a hydrostatic paver finisher
     with sensor control to the required grade, level
     and alignment rolling with smooth to achieve 10033.10 10504.66    8331.17   8331.17   87516072.43   10835.40   9281.40   10395.17   -0.041   -3555694.81
     the desired compaction as per MORTH
     Specification Clause 509 complete in all
     respects including cost of all material, labour
     T&P etc as per directed by Engineer-in-charge.
     (Including cost of Bitumen)
11 Providing   and laying 30 mm Bituminous
   Concrete with 100 TPh HMP producing an
 B
   avarage output of 75 tonnes per hour using
   crushed aggergates of specified grading,
   premixed with bituminous binder @5.4 per cent
   mix and filler, transporting the hot mix to work
   site, laying with a hydrostatic paver finisher
   with sensor control to the required grade, level
   and alignment rolling with smooth to achieve 5025.00       5025.00   3440.75   3440.75   17289768.75    5025.00   4850.90   5433.01   0.081       1403853.53
   the desired compaction as per MORTH
   Specification Clause 509 complete in all
   respects including cost of all material, labour
   T&P etc as per directed by Engineer-in-charge.
   (Excluding cost of Bitumen)
12 Earth Work in excavation for foundation as per
     clause 301 of MoRTH Specification. For Drain    51.70     54.13    1065.98   1065.98    57701.12       55.90     53.90     60.37    0.080        4611.96
13 PCC     1:3:6 in foundation with 40 mm gauge
                                                    5114.20   5354.57   104.53    104.53     559712.93     5128.90   4540.40   5085.25   -0.009       -4763.71
     brick ballast For Drain
14   Brick work 1:3 as per clause 1300 of MoRTH
                                                    6084.00   6369.95   300.85    300.85    1916367.01     5971.40   5335.60   5975.87   0.001        1435.17
     Specification.For Drain & Cluvert
15   12mm thick Plaster 1:4 as per         clause
                                                    114.00    119.36    170.40    170.40     20338.60      116.60    101.70    113.90    -0.023       -470.26
     1300&2200 of MoRTH Specification.
16   Supply ,Fitting and placing MS bar
     rainforcement in foundation complete as per
     drawing and Techinical Specification Clauses   4876.00   5105.17    33.84     33.84     172759.02     5015.00   4276.70   4789.90   -0.045       -7754.21
     100 and 1202(1485)
17 Supply & laying of 1000 mm Dia Hume     Pipe     4516.00   4728.25    15.00     15.00     70923.78      4516.00   4335.36   4855.60   0.075        5333.47
18 R.C.C. M-25 as per    clause 1500,1700 & 2100
                                                 7288.90      7631.48    43.18     43.18     329527.23     7414.30   6412.90   7182.45   -0.031      -10304.62
     of MoRTH Specification.
                                                                                            376091399.06                                  Total :-   8853128.80
        Contractor                                Junior Engineer                      Assistant Engineer                                Executive Engineer