0% found this document useful (0 votes)
12 views1 page

Front Side Elevation Transversal Section View 1: Manufacturing Warehouse Jva Builders

Uploaded by

Kevin Piñon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views1 page

Front Side Elevation Transversal Section View 1: Manufacturing Warehouse Jva Builders

Uploaded by

Kevin Piñon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TRANSVERSAL SECTION VIEW 1 FRONT SIDE ELEVATION

TRANSVERSAL SECTION VIEW 2 REAR SIDE ELEVATION

AS-BUILT PLAN

CONTRACTOR : ARCHITECT: NOTE: PROJECT TITLE AND LOCATION: OWNER'S REPRESENTATIVE DESIGNED BY: SHEET CONTENTS: SHEET NO.:

REPUBLIC ACT 9266 Section 33


MANUFACTURING WAREHOUSE DRAWN BY: FRONT SIDE ELEVATION
OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS

GOLDEN MILE BUSINESS PARK, BRGY. MADUYA, CHECKED BY: REAR SIDE ELEVATION
A
LICENSED ARCHITECT
JVA BUILDERS PRC No. : PTR No. :
MUNICIPALITY OF CARMONA, PROVINCE OF CAVITE
DESIGNATION : SENIOR FACTORY MANAGER APPROVED BY: 3
BRGY. TEJERO, GENERAL TRIAS, CAVITE
VALIDITY : DATE ISSUED : OWNER : DATE : JUNE 10, 2020
TRANSVERSAL SECTION VIEW 1
PCAB NO. - 9015
TIN PLACE ISSUED :
NANOFORGE SOLUTIONS SIGNATURE : DATE: TRANSVERSAL SECTION VIEW 2 SHEET 3 0F 5

You might also like