ID
A Testing, Reporting and Commissioning
B Circuit Design & Manual Function
C Measurements & Level/Plumb
D Installation of Equipment & Wire-ways
E Wiring & Terminations
G Programming & Automatic Function
I
Aspect
Sub
Sub Criterion Type
Criterion
Name or Description M = Meas
ID
J = Judg
A1 Commissioning process
M
M
M
M
M
M
Aspect
Sub
Sub Criterion Type
Criterion
Name or Description M = Meas
ID
J = Judg
B1 Circuit design
M
M
M
M
M
M
M
M
M
B2 Manual Function - KNX
M
M
M
M
M
M
B3 Manual function - Motor
M
M
M
M
M
M
M
B4 Manual function - Lighting
M
M
M
Aspect
Sub
Sub Criterion Type
Criterion
Name or Description M = Meas
ID
J = Judg
C1 Measurements
M
M
M
M
M
M
M
M
M
M
C2 Plumb/Level
M
M
M
M
M
M
M
M
M
M
Aspect
Sub
Sub Criterion Type
Criterion
Name or Description M = Meas
ID
J = Judg
D1 Installation of Equipment
M
M
M
M
M
M
M
M
M
M
M
D2 Installation of Wireways (Trunking and tray)
J
D3 Installation of Wireways (Cable and conduits)
J
J
J
Aspect
Sub
Sub Criterion Type
Criterion
Name or Description M = Meas
ID
J = Judg
E1 Wiring in boards
J
E2 Cabling on tray
J
E3 Terminations
M
M
M
M
M
Aspect
Sub
Sub Criterion Type
Criterion
Name or Description M = Meas
ID
J = Judg
F1 Programming/Automatic function KNX
M
M
M
M
M
M
M
M
18
Aspect - Description
Installation complete when electrical supply is requested
Safe electrical installation when electrical supply is requested
Safe work practices
Safe work practices
Safe work practices
No short circuits or earth faults
Labeling
Function chart
Aspect - Description
Size - supply cabling PS to Main DB
Colour codes - supply cabling PS to Main DB
Size - supply cabling Main DB to Control Panel
Colour codes - supply cabling Main DB to Control panel
Size - supply cabling control panel to Motor
Size - cabling for lights
Size - cabling for power outlets
Size - cabling for Staircase system
Size - cabling for Motion sensor
Switch actuator Channel A1
Switch actuator Channel A2
Switch actuator Channel A3
Switch actuator Channel A4
Dimming actuator Channel 1
Dimming actuator Channel 2
Motor runs in forward direction when Forward push button is pressed. Motor stays running (forward) as long as Forward push b
Forward indicator lamp (Green) operated when motor running in forward direction.
Reverse push button have no function until motor has stopped
Motor runs in reverse direction when reverse push button is pressed. Motor stays running (reverse) as long as reverse push bu
Reverse indicator lamp (Blue) operated when motor running in reverse direction.
Forward push button have no function until motor has stopped
Emergency stop push button stops motor when running in any direction. Reset itself automatically when released but forward p
pressed again to get motor running.
Yellow indicator will on when there is any over load trip
S1 and S2 controlles H1 independantly as per instructions. All buttons must work for marks to be given.
S1 and S2 controlles H1 independantly as per instructions. All buttons must work for marks to be given.
Motion sensor controlles P3 power point
Aspect - Description
Measurement 1 (Main DB bottom line to center line 200 MM)
Measurement 2 (Motor top line to center line 600 MM)
Measurement 3 (H2 center to center line 1000 MM)
Measurement 4 (PS bottom line to center line 300 MM)
Measurement 5 (Left side of P1 to center line 200 MM)
Measurement 6 (Bottom of 2G to center line 200 MM)
Measurement 7 (Top of trunking to center line 800 MM)
Measurement 8 (Top of cable tray to center line 900 MM)
Measurement 9 (H5 center to center line 700 MM)
Measurement 10 (Motion sensor center to center line 600MM)
Item 1 (Main DB) Level/Plumb
Item 2 (Control Panel) Level/Plumb
Item 3 Horizontal tray on right hand panel - Level
Item 4 Vertical trunking on center wall - Plumb
Item 5 Vertical conduit to S2- Plumb
Item 6 (Motor point) Plumb
Item 7 Horizontal to S1- Plumb
Item 8 (P5) Plumb
Item 9 (P3) Plumb
Item 10 Horizontal trunk on right hand panel - Level
Aspect - Description
Correct equipment in correct locations on left wall of cubicle as per drawing
Correct equipment in correct locations on back wall of cubicle as per drawing
Correct equipment in correct locations on right hand wall of cubicle as per drawing
Correct equipment in correct locations in control panel
Main DB securely installed
Control Panel securely installed
Motion sensor securely installed
H2 securely installed
P3 securely installed
S3 securely installed
PS securely installed
PVC Trunking. Securely fitted. Joints and angles are neat with no gaps (T-joint not included). Secure with no roll.
PVC Mini Trunking. Securely fitted. Joints and angles are neat with no gaps. Secure with no roll.
Mesh tray. Securely fitted. Bends are equally shaped. Secure with no roll or movement.
Cable. Correctly clipped with straight runs and even bends.
PVC conduits. Bends, angles and jumps are even with no distortions
Flexible conduit. Bends and angles are even
Aspect - Description
Neatness of wiring in Main DB
Neatness of wiring in control panel
Neatness of cables on mesh tray
Main DB: All conductors securely terminated with no bare copper showing
Control Panel: All conductors securely terminated with no bare copper showing
Main DB: All conductors securely terminated with no bare copper showing
S1: All conductors securely terminated with no bare copper showing
H4: All conductors securely terminated with no bare copper showing
Aspect - Description
2G1 button 1 ON H3
2G1 button 2 OFF H3
2G1 button 3 ON/OFF H4
2G1 button 4 Dimming UP/DOWN H7
2G2 button 1 Dimming UP H8
2G2 button 2 Dimming down H8
2G2 button 3 ON/OFF H5
2G2 button 4 ON/OFF H6
s
Judg
Score
Judg
Score
Judg
Score
Judg
Score
0
1
2
3
0
1
2
3
0
1
2
3
0
1
2
3
3
0
1
2
3
Judg
Score
0
1
2
3
0
1
2
3
0
1
2
Judg
Score
Extra Aspect Description (Meas or Judg)
OR
Judgement Score Description (Judg only)
Installation fully complete (all equipment and covers in place) when electrical supply is requested - confirmed by at least 2 Expe
Installation electrically safe (all euipment fixed in place and all cables connected) when electrical supply is requested - confirme
visual check
Safe work practices during power-up (all circuits powered).
If any unsafe practices observed and confirmed by at least 2 experts = 0 marks
Safe work practices during commissioning.
If any unsafe practices observed and confirmed by at least 2 experts = 0 marks
Safe work practices during programming.
If any unsafe practices observed and confirmed by at least 2 experts = 0 marks
No short circuits or earth faults during power-up and commissioning. If any short circuit or earth fault observed and confirmed b
All equipment labelled correctly following commissioning.
Function chart completed by competitor reflecting actual function
Extra Aspect Description (Meas or Judg)
OR
Judgement Score Description (Judg only)
2,5mm2
Colour code as per instructions
2,5mm2
Colour code as per instructions
2,5mm2, wire (Red, Yellow, Blue and green)
1,5mm2
1,5mm2
1,5mm2
1,5mm2
Operates Light H3
Operates Light H4
Operates Light H5
Operates Light H6
Light H7
Light H8
Note:
If any item requiring an earth is not earthed then any circuits associated with that item cannot be powered up and therefore not
function.
Sequence 1
Sequence 2
Sequence 3
Sequence 4
Sequence 5
Sequence 6
Sequence 7
Sequence 8
On/Off from all places without light leaving on or off when testing another switch
On/Off from all places without light leaving on or off when testing another switch
Extra Aspect Description (Meas or Judg)
OR
Judgement Score Description (Judg only)
Plus or minus 2mm vertically
Plus or minus 2mm vertically
Plus or minus 2mm vertically
Plus or minus 2mm vertically
Plus or minus 2mm Horizontally
Plus or minus 2mm vertically
Plus or minus 2mm vertically
Plus or minus 2mm vertically
Plus or minus 2mm Horizontally
Plus or minus 2mm vertically
Bubble on or between lines on level, not outside
Bubble on or between lines on level, not outside
Bubble on or between lines on level, not outside
Bubble on or between lines on level, not outside
Bubble on or between lines on level, not outside
Bubble on or between lines on level, not outside
Bubble on or between lines on level, not outside
Bubble on or between lines on level, not outside
Bubble on or between lines on level, not outside
Bubble on or between lines on level, not outside
Extra Aspect Description (Meas or Judg)
OR
Judgement Score Description (Judg only)
Visual Check by marking team
Visual Check by marking team
Visual Check by marking team
Visual Check by marking team
No roll or movement of Main DB
No roll or movement of Control Panel
No roll or movement of Motion sensor
No roll or movement of H2
No roll or movement of P3
No roll or movement of S3
No roll or movement of PS
Below industry standard or no attempt: Joints are badly cut with excessive gaps. Lids not fitted or not fitted correctly. Roll or mo
Meets industry standard: Joints are neat and even but with gaps. Covers fitted. No roll or movement.
Industry standard with elements of good practice: Joints are neat with only some minor gaps. Covers fitted. No roll or movemen
Excellent in comparison to industry standard: Joints are neat with no gaps. Covers fitted. No roll or movement.
Below industry standard or no attempt: Joints are badly cut with excessive gaps. Lids not fitted or not fitted correctly. Roll or mo
Meets industry standard: Joints are neat and even but with gaps. Covers fitted. No roll or movement.
Industry standard with elements of good practice: Joints are neat with only some minor gaps. Covers fitted. No roll or movemen
Excellent in comparison to industry standard: Joints are neat with no gaps. Covers fitted. No roll or movement.
Below industry standard or no attempt: Joints are badly cut with excessive gaps Cuttings have sharp edges and/or burrs. Roll o
Meets industry standard: Joints are neat and even but with gaps. Some cuttings have sharp edges and/or burrs. No roll or mov
Industry standard with elements of good practice: Joints are neat with only some gaps. Cuttings have no sharp edges but some
tray or brackets
Excellent in comparison to industry standard: Joints are neat with no gaps. Cuttings have no sharp edges or burrs. No roll or m
Below industry standard or no attempt: Clips unevenly spaced. Cable not straight and even. Bends too sharp or too long.
Meets industry standard.Cable straight and even with good bends but clips not evenly spaced.
Industry standard with elements of good practice: Cable straight and even with good bending and the majority of cable clips eve
Excellent in comparison to industry standard: Cable straight and even with good bending and all cable clips evenly spaced.
Below industry standard or no attempt: Saddles not evenly spaced, poor termination to trunking or boxes, poor bends with unev
overs not matching
Meets industry standard: Majority of bends have even radius with some minor distortion. Saddles evenly spaced and correct ter
boxes. Jump overs not matching.
Industry standard with elements of good practice: All of the bends have even radius with no distortion. Saddles evenly spaced a
trunking and boxes. Jump overs closely matching.
Excellent in comparison to industry standard: All of the bends are smooth, have identical bend radius and are at the correct ang
Below industry standard or no attempt: Saddles not evenly spaced, poor termination to trunking or boxes, poor bends with unev
Meets industry standard: Majority of bends have even radius. Saddles evenly spaced and correct terminations to trunking and b
Industry standard with elements of good practice: All of the bends have even radius. Saddles evenly spaced and correct termin
Excellent in comparison to industry standard: All of the bends are smooth, have identical bend radius and are at the correct ang
Extra Aspect Description (Meas or Judg)
OR
Judgement Score Description (Judg only)
Below industry standard or no attempt: All cables not loomed or loomed but untidy. Cabling not straight and vertical into switchg
Meets industry standard: All looms are neat and tidy but with some cabling crossover. Some cabling straight and vertical into sw
Industry standard with elements of good practice: All looms neatl with very few cabling crossovers. Majority of cabling straight a
Excellent in comparison to industry standards: All looms with no cabling crossovers. All cabling straight and vertical into switchg
Below industry standard or no attempt: All cables not loomed or loomed but untidy. Cabling not straight and vertical into switchg
Meets industry standard: All looms are neat and tidy but with some cabling crossover. Some cabling straight and vertical into sw
Industry standard with elements of good practice: All looms neatl with very few cabling crossovers. Majority of cabling straight a
Excellent in comparison to industry standards: All looms with no cabling crossovers. All cabling straight and vertical into switchg
Below industry standard or no attempt: All cables not cable tied or cable tied but untidy. Cables not secured properly to tray. Be
Meets industry standard: Cables neat and tidy but cable ties are unevenly spaced. No kinks or twists on cables. Most of the ben
Industry standard with elements of good practice: Cables neat and tidy and cable ties are evenly spaced. No kinks or twists on
cables are even.
Excellent in comparison to industry standards: Cables well grouped and stacked, very neat and tidy and cable ties are evenly s
cables. All of the bends on cables are even.
No copper visible when viewed at 90 degrees and no damage to the copper conductors. No movement of conductor in terminal
No copper visible when viewed at 90 degrees and no damage to the copper conductors. No movement of conductor in terminal
No copper visible when viewed at 90 degrees and no damage to the copper conductors. No movement of conductor in terminal
No copper visible when viewed at 90 degrees and no damage to the copper conductors. No movement of conductor in terminal
No copper visible when viewed at 90 degrees and no damage to the copper conductors. No movement of conductor in terminal
Extra Aspect Description (Meas or Judg)
OR
Judgement Score Description (Judg only)
Operation as per instructions
Operation as per instructions
Operation as per instructions
Operation as per instructions
Operation as per instructions
Operation as per instructions
Operation as per instructions
Operation as per instructions
Mark
10.00
25.00
15.00
20.00
15.00
15.00
Max Total
Mark Criterion A 10.00
Mark
1.00
1.00
0.75
0.75
0.50
2.00
2.00
2.00
Max Total
Mark Criterion B 25.00
Mark
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
1.25
1.25
1.25
1.25
1.25
1.25
1.25
2.00
1.50
1.50
Max Total
Mark Criterion C 15.00
Mark
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
Max Total
Mark Criterion D 20.00
Mark
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.50
1.50
1.50
1.50
1.75
1.25
Max Total
Mark Criterion E 15.00
Mark
4.00
4.00
3.00
1.00
1.00
0.75
0.75
0.50
Max Total
Mark Criterion G 15.00
Mark
1.75
2.00
1.75
2.00
1.75
2.00
2.00
1.75
Total
Competition 100.00
Mark