0% found this document useful (0 votes)
7 views2 pages

Quotation

go with te above

Uploaded by

kencyber101
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views2 pages

Quotation

go with te above

Uploaded by

kencyber101
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

PLUMBING QUOTATION

FOR 7 STOREY BUILDING


From: Stephen Ndung'u
To: Joshua Murungi Date: 26th July 2025

# Item Unit Item Unit Price Total


1 Ground floor setting out 1 16,000.00 16,000.00
2 Ground floor manhole grease trap stormwater 1 34,000.00 34,000.00
3 Setting our point per floor 7 24,500.00 171,500.00
4 Marking & chasing 99 1,600.00 158,400.00
5 Piping work cold water 99 2,850.00 282,150.00
6 Internal drainage foul soil H20 99 1,650.00 163,350.00
8 Testing 99 1,800.00 178,200.00
9 Rasing main borehole 1 9,000.00 9,000.00
10 Droping main from tank 1 15,000.00 15,000.00
11 Main for hose reel line 1 9,000.00 9,000.00
12 Top roof drainage & piping work 1 5,500.00 5,500.00
13 Tank connection work 1 37,000.00 37,000.00
14 Storm water drainage from top roof 1 24,000.00 24,000.00
15 First floor drainage from above to septic 1 55,000.00 55,000.00
Subtotal 1,158,100.00

Fitting work
1 Water clocet (WC) 101 2,100.00 212,100.00
2 Wash Hand Basin (WHB) 101 1,800.00 181,800.00
3 Stop cork 101 310.00 31,310.00
4 Angle valve 210 110.00 23,100.00
5 Taps 300 130.00 39,000.00
6 Shower 98 600.00 58,800.00
7 Kitchen 98 1,100.00 107,800.00
8 Meter 98 400.00 39,200.00
9 Hose reel installation 6 3,000.00 18,000.00
Subtotal 711,110.00

Grand total 1,869,210.00

…..........................