0% found this document useful (0 votes)
30 views2 pages

Consultant 11

Uploaded by

joejeejay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views2 pages

Consultant 11

Uploaded by

joejeejay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Obs Ref: ELRASS / 11

HSE Observation Record


Date Raised: 2025/03/13

Cluster: NWC Directorate/CBU: ‫منطقة القص م‬

‫جنوب‬ ‫وع تنف ذ ش ات ال ف الص‬ ‫م‬


Project Name: Project no. 161240138
‫محافظة الرس‬

Supervising Consultant: ‫كه‬ ‫كة ع دﷲ السع د و‬ Contractor: ‫للمقاوﻻت‬ ‫كة الع‬

Location visited: ‫التعل م‬ Observer: ‫م الرو‬ ‫م ع دال‬

1. OBSERVATION: A non-fulfilment of specified requirements (details shall include the requirement, the failure, the objective evidence
and the implication for the project or process if the risk remains un-managed):

‫الرحاب محافظة الرس وتم رصد المﻼحظات‬ ‫ف الص‬ ‫وع أن شاء ش ات ال‬ ‫لنظام السﻼمة والصحة المهن ة لم‬ ‫خﻼل عمل ة المراجعة والتدقيق الداخ‬
: ‫التال ة‬
. ‫عدم وجود لوحات ارشاد ة وتحذي ة‬ -1
. ‫عدم نظافة منطقة العمل عد اﻻنتهاء من العمل‬ -2

Name: ‫م الرو‬ ‫م ع دال‬ Signature: Date: 2025/03/13

2. IDENTIFY ROOT CAUSE: The action plan should be prescribed by the Contractor.

3. CORRECTIVE ACTION: The action plan should be prescribed by the Contractor.

4. PREVENTIVE ACTION (action taken to prevent recurrence): This section should only be completed where a root cause of the
observation has been identified that requires further action, in order the observation does not recur.

Proposed Action Date

Name: Signature: Date:

Consultant Approval: Approved ☐ Approved with comments ☐ Rejected ☐

Comments:

Name: Signature: Date:

5. FOLLOW UP AND CLOSE-OUT: The following evidence has been examined and confirms that corrective action has been taken.

Consultant Approval: Approved ☐ Approved with comments ☐ Rejected ☐

Comments:

Consultant 1 of 2
Consultant 2 of 2