Quaid Azam University

The document outlines technical specifications for various wireless network equipment and data center facility equipment, including WLC gateways, access points, switches, and cooling systems. It details the required features, compliance standards, and hardware specifications necessary for optimal performance and security. Additionally, it includes installation and civil work requirements for the data center setup.

Uploaded by

Raja Kashmiri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views9 pages

Quaid Azam University

The document outlines technical specifications for various wireless network equipment and data center facility equipment, including WLC gateways, access points, switches, and cooling systems. It details the required features, compliance standards, and hardware specifications necessary for optimal performance and security. Additionally, it includes installation and civil work requirements for the data center setup.

Uploaded by

Raja Kashmiri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Technical Specifications:

Wireless Network Equipment


Sr. Name of Equipment & Specifications Qty. Unit Price Total
1 WLC (Gateway)
It can manage up to 500+ APs, meeting requirements 02
of medium and enterprise campuses.
2 x 25G SFP28 ports with Transceivers
2 x 10G SPF+ with Transceivers
2 x 2.5 GbE RJ45 ports
At least 12.5 Gbit/s Throughput

Automatic channel optimization


AAA supported active directory / RADIUS/ LDAP support
Must support High Availability
Must support SD-WAN
Must support Network Monitoring
Wi-Fi 7 / Wi-Fi 8 Ready

Management and Security Features


Next Day Inspection (NDI)
SSL Certificates:
Firewall Insights
Granular Control
Threat Protection
Should be able to Run Network for full-stack network
management

WLC Gateway Compliance requirements.


Should be compactable with the following Compliance
International Organization for Standardization 27001
(ISO 27001)
General Data Protection Regulation (GDPR)
International regulations
University Record & Data Retention

Software Requirements.
Support 3rd Pary syslog servers like Kiwi etc.
Support UIPATH AI
Built-in Ticket creation for emergency support
Should be compactable with XDR and SIEM
Endpoint Visibility using Observium or Zabbix
Ability to run Automations using Automation tools like
NETBOX
Ability to run Standalone & offline in absence of
authentication assessment server

Storage Hardware Requirements


(16) 3.5" HDD / SSD support
(2) 10G SFP+ uplinks and (1) 10 GbE RJ45 port
Data protection with RAID Storage Technology
(2) included hot-swap PSUs for power redundancy
Dedicated AI Chipset for AI Utilization
Storage: 8TB HDD (Total 8 HDDs)
3.5 Inch SATA 6Gb/s 7200 RPM 256MB Cache
High Availability Ready: Shadow Mode High Availability
with automatic failover provides uninterrupted
connectivity (VRRP)
Must Support Built-in Touch Display Bezel
With Mounting Railing Kits

2 Access Point Indoor


WiFi IEEE 802.11a/b/g/n/ac/ax/be (WiFi 6/6E, WiFi 7)
WPA-PSK, WPA-Enterprise (WPA/WPA2/WPA3/PPSK)
Can support min 500 plus Concurrent users
Channel Bandwidth upto 320 MHz 200
Frequency Band Range 2.4Ghz, 5Ghz and 6 GHz
2.4 Ghz 2 x 2 (DL/UL MU-MIMO)
5 Ghz 4 x 4 (DL/UL MU-MIMO)
6 Ghz 2 x 2 (DL/UL MU-MIMO)
Network Interface Upto 2.5 GbE RJ45
3 10G Core Switch 02
32 Port Layer Switch with High Capacity 10G SFP+ and
25G SFP28 Connections
28 10G SFP+, 4 25G SFP28 ports with Transceivers
Switching Capacity at least 760 Gbps, Throughput 380
Gbps with Forwarding rate 565 Mpps
Dual Power Supply
Must support Storm Control, Multicast/Broadcast rate
limiting, STP/RSTP, DHCP snooping/guarding, DHCP
Relay, Inter VLAN routing, Network Loop Protection
Wi-Fi 7 / Wi-Fi 8 Ready
4 Layer 3 24 ports PoE Network Switch
24 Ports, Layer 3 Switch with 2.5 GbE PoE+, 2 10G SFP+
Ports 20
GbE PoE 12 Ports, 2.5 GbE RJ45 12 Ports, 2 10G SFP+ ports
Switching Capacity at least 120 Gbps with Forwarding
rate 90 Mpps
PoE Power 400W
Must support Storm Control, STP/RSTP, DHCP
snooping/guarding, DHCP Relay, Inter VLAN routing,
Network Isolation with ACLs
Wi-Fi 7 / Wi-Fi 8 Ready
5 Layer 2 Non PoE 48 Ports Network Switch 15
48 GbE RJ 45 Ports, 4 1G SFP Ports
Switching Capacity at least 104 Gbps, Throughput 52
Gbps with Forwarding rate 75 Mpps
Must support Storm Control, STP/RSTP, DHCP
snooping/guarding
6 Layer 2 Non PoE 24 Ports Network Switch 12
24 GbE RJ 45 Ports, 2 1G SFP Ports
Switching Capacity at least 52 Gbps, Throughput 26 Gbps
with Forwarding rate 38 Mpps
Must support Storm Control, STP/RSTP, DHCP
snooping/guarding
6 SFP Transceivers 10GE Single Mode 20
Single Mode 10 GE SFP +
7 SFP Transceivers 1GE Single Mode 15
Single Mode 1GE SFP +
8 Fiber Single Mode Patch Cords
Fiber Single Mode Patch Cords Single Mode 80
9 Network Cabinet
10U Network Cabinet with Fan with 600mm Depth 30
10 Power Backup. 15
At least 950W DC Power Availability with at least 6 DC
Smart Power ports with 1 G RJ45 ports with maximum
power consumption 995W with Surge Protection
DC Output Direct to Gateways & Switches.
11 PDU (Rack Mount) 2
At least 16 Power Control Outlets with Maximum Output
Current 1875W with Surge protection.
Network Managed PDU Solution
12 Ethernet Surge Protector 30
Protects Ethernet Devices with 2 Passive, surge
protected RJ45 connections compatible with 2.5 GbE
networks with ESD/EMP Protection, Absorbing transient
current with response to surge voltage from 100V/s to
1kV/us, PoE Support, Data Line protection upto 2.5 Gbps
13 Patch Cord:
1 Meter, Pure Copper (Branded) 50
17 96 Core Single Fiber Optic Cable (LTE) Laying based on Around 4
ground survey for backbone DC connectivity with on- KM
campus departmental/hostel, and Department buildings.
18 LAN Networking/Power Work:
Connectivity mounting and installation of all Access
points with Switches existing and current purchase. As per
Duct and PVC pipe for connectivity of Access point actual/ per
throughout the campus including Pure Copper Cat 6 meter
Cable Roll
Complete End to End Connectivity of network switches
with Core switches And Wireless LAN controller with
Access Points.
Power Socket with Power Cable for Network Cabinets
wherever Required
19 Estimation of Passive (Structure Cabling accessories and As per
Fiber Optic Backbone network connectivity) BoQ is actual
separately attached. Survey
Total cost of Wi-Fi Equipment
(Turnkey Basis)
Data Center Facility Equipment
1 Cabinets QTY UOM
42U Closed Cabinet kit, dimension
600mm(W)*1400mm(D)*2000mm(H). Including
9-folded support frame, mounting flange, top
panel with brush, bottom panel with brush,
wheels and cups, front cold air management
1.1 Closed Cabinet Kit 6 No
channel, and rear hot air management channel,
sandwich type transparent front door with
thermal insulation, split rear doors, emergency
ventilation system to open doors upon over
temperature.
Side door with insulation and side air channel
1.2 Side Door sealing panels with insulation, for Closed 2 No
Cabinet of 1100mm(D)*2000mm(H).
Lights for mdc, red light at rear side and blue
1.3 Environment Lights 6 No
light at front side.
Quick installation type tool free blanking panel
1.4 Blanking Panel 180 No
1U height.
Vertical cable organizer, 42U height. Including
1.5 Vertical Cable Organizer 12 No
cable plate, and cable rings.
Top cable management system, seperation of
1.6 Top Cable Management power and signal wiring. Dimension 6 No
600mm(W)*360mm(D)*150mm(H)
Thermal
2
Management System
12.7kW or ghier Inrow type, cooling with
Inrow DX 12.7kW Cooling
2.1 humidification, inverter compressor, condenser 2 No
or higher
included.

3 Power System
UPS rack mount, 20kVA high frequency type,
3.1 Rack Mount UPS-20kVA 2 No
220V/220V, 3U height
Rack mount PDM, 63A 3P power input,
including power meters, surge protection, and
Power Distribution
3.2 power distribution & management braces of 2* 2 No
Module
UPS, 2* Cooling, 1* ups bypass, 4* PDU, and
1* surge protection. 6U height.
3.3 Basic PDU-16 Sockets PDU C13 and C19 Sockets type 10 No

Rack mount battery package, VRLA type, 40*


3.4 Rack Mount Batteries 2 No
12V/9AH batteries. 2U height.
4 Monitoring System
Integrated monitoring host with built in 10-inch
display, communicates with sensors
Monitoring Host- All in (temperature & humidity, smoke, leaking, door
4.1 1 No
One Type open) and equipment (cooling, ups and power
meters). Web portal and Modbus-TCP port.
Wall mounting type.
Sensor - Temperature &
4.2 Temperature and humidity sensor, RS-485 type 6 No
Humidity

4.3 Sensor - Smoke Smoke sensor, dry contact type with alarm light. 6 No

Sensor - Leaking none


4.4 Water flooding sensor, none positioning type. 2 No
Positioning Type

4.5 Security System


Access controller, management of users, logs
4.6 Access controller
and access authorization
3 in 1 access control reader, supporting
Supporting fingerprint, RFID card, and pin both side front 1 LOT
and back side sides of racks
Door locking system Kit assembly, including
4.7 Door Locking
magnetic type locks, and hydraulic open poles

5 LOCAL PORTION
Electrical Cables
Total Meter
Main Output Cable from as per site
5.1 4cx50mm+Earth PVC/PVC Cable on cable try 1
ATS to UPS PDM Survey by
Vendor

Total Meter
UPS Output Cable from
as per site
5.2 PDM to Each IT rack with 3cx6mm PVC/PVC cable on cable try 1
Survey by
path A+B
Vendor

Total Meter
Main Input cable for In- 4cx6mm PVC/PVC cable + Earth Cable on as per site
5.3 1
row cooling units cable try Survey by
Vendor

6 Earthing
Earth pit for Data Center equipment/Generator
Main Earth Pit for Data
to attain less than 1 Ohm value with all
6.1 Center 1 Job
chemical, copper rope, Copper rod or plate, GI
equipment/Generator
for watering, main hole, complete in all respect
Total Meter
Earth Wire from Earth pits as per site
6.2 1cx35mm PVC/PVC Earth cable 1
to Power room Survey by
Vendor
Total Meter
1x6mm earth cable to SRG earth fo Each IT as per site
6.3 SRG Earthing 1
racks/Cable try with Earth Bar Survey by
Vendor
Cable Management
7
System
Total Meter
G I Cable try Size 8"x3" perforated without
Data/Power/ as per site
7.1 Cooling cable try
cover including powder coated paint, hanging 1
Survey by
rod, bend, through and accessories
Vendor
FM200 Fire
8 Suppression System
(Datacenter)
8.1 Extinguishing Control Panel with batteries
8.2 Optical Smoke detector with base
8.3 First Stage Fire Alarm Sounder
8.4 Second Stage Fire Alarm Sounder Flasher
8.5 Abort Switch 1 LOT

8.6 Gas Discharge Nozzle 360*


8.7 FM200 gas in kgs UL Listed & FM Approved.
cylinder with electrical Actuator and cylinder
8.8
holding bracket.

Conventional fire
9 detection alarm
system (Power Room)
Control Panel with batteries
9.1 12 Volt 3.2 Ah
9.2 Optical Smoke detector with base 1 LOT
9.3 Manual Call Point
9.4 Fire Alarm Sounder flasher

Security and
10
Surveillance
IP Cameras
8 Port NVR including 2x16 TB Surveillance
10.1
Storage Drive 1 No.
10.2 Indoor IP cameras 6 No.
10.3 Management Software 1 No.
10.4 Network Cable 6 Job
10.5 Conduiting with installation 6 Job

Access Control
Touchless 3 in 1 Biometric access control
10.6 3 No.
system
10.7 EM Locks 600 Lbs. 3 No.
10.8 Exit Buttons with Back Box Touch less 3 No.
10.9 Cabling / Conduiting 1 Job
10.10 Management Software 1 No.

In-row Precision air


11
conditioning
TO INSTALL NEW IN-ROW COOLING
11.1
UNITS
Final positioning & installing 12.7kW or higher.
(Liquid and Hot gas copper piping c/w all
11.2
accessories and fittings covering distance from
indoor to outdoor condenser units,
Refrigerant Hard copper Hot Gas Line, Liquid
11.3
Line including Bend, Gas brazing (single circuit)
11.4 Install air cooled condenser bracket support
Drainage system for condensate water c/w
11.5
insulation.
N2 Pressure test at 300 psi for 24 hours for
11.6 1 LOT
copper piping.
Control cabling Conducting from indoor to
outdoor condenser. (To supply and install 3 x
11.7
2.5mm2 + E + 1 Spare PVC cables from indoor
to outdoor condenser unit.)
11.8 Refrigerant gas, R410A.
Water tank with PPR Pipe and water filter for
11.9 humidification water supply (Supply &
Installation included)
11.10 Testing and commissioning.

12 Civil Work
Data Center Partitioning wall with blocks and
12.1 plaster including tempered glass 12mm looking 1 Job
window size 3ftx6 ft
60min fire rated door Size 3'-6''X 7' with all
12.2 Accessories door closer, lock, fireproof glass 1 Job
window.
Paint work to whole facility, datacenter, power
12.3 room, NOC and entrance Lobby with filling, 1 Job
rubbing.
SMD Panel light size 1ftx4ft with cabling size
12.4 1 Job
3x029x2 with motion sensor switch.

ESD (Anti-Static)
13
Flooring
ESD Size 2x2 with anti-static vinal flooring with
13.1 1 Job
earthing strip mesh for datacenter Power room
Ultrasonic Anti-
14
rodent
Qty as per
14.1 Ultrasonic Dou Pro-Pest rappeler 1 site survey
Required
Servers Requirements (Qty: 5 Servers) CPU
Generation
on Servers
Chassis Rack-Mountable 2U Server Chassis
Total Cores At least 440 Cores in 5 Servers
4 x Intel® Xeon E5-4669 v4 (2.2GHz/22Cores) CPU Module or
PROCESSOR Higher
MEMORY 1 TB PC4-17000-R (2133Mhz) ECC Registered Server Memory per
Server
2 x 256GB SSD - SATA OS Drive 2 Each Server (Total OS SSD 10 x 256 SSD
SYSTEM DISK in 5 Servers) Read Intensive SSD or Higher with RAID1 Support for OS
Installation
STORAGE 2 x 2 TB SSD SATA Storage Drive for each server
2 x 10 TB SSD DATA Storage for each server or Higher

Combined SSDs Size 100 TB


At least 440
1 x 4-Port 1GE Copper Interface OCP3.0 Ethernet Adapter or Higher Cores Intel
ETHERNET
2 x 2-Port 10GE Fiber Interface Ethernet Adapter With 4 x 10GSFP+ based
Optical Transceiver Module (850nm,300m, LC) Servers and
RAID Controller 1 x P460-B4 12G SAS RAID Controller Module (Supporting 8 SAS Virtualizatio
Ports,4GB Cache, PCIe, No Supercapacitor) n Software
Power Supply 2 x 1600W 80+ Platinum PSU for each server, the power module
can support overclocking for scalability and future GPU
requirements.

Rack Mount Rail Complete Sliding Rail Kit for each server in Rack Mounting

Front Bezel Front Security Bezel should be installed

MANAGEMENT Embedded Server Management Software as per standard


SOFTWARE requirement for RAID and other configurations.

Virtualization Virtualization Software with CPU Socket based licensing with 3


Software (Optional) Years Support Service, licenses should be perpetual

3 Years with warranty including replacement of parts


Hardware WARRANTY
QTY
UPS 10KVA Online
UPS 10KVA Online
Max Configurable Power (Watts) 10.0kWatts /10.0kVA (Rack Mount/Tower Convertible)
Input Voltage Configurable for 220V
Input Voltage Range = 110-300Vac
Input Frequency (sync to mains) 46 - 54 Hz For 50 Hz
Unity Power Factor
Efficiency at Full Load 94% 01
Output Voltage Distortion Less than 5 % at full load
Harmonic Distortion (Less than 1% on Linear Load)
Charging Current = 4A
Dimensions (438*600*88(2U))
Battery Backup = 12V 9Ah*16 Nos Batteries with Third Party Battery Bank
3 Years 5x9 NBD with warranty including replacement of parts
Hardware WARRANTY

Terms & Conditions of Quoted Solution

Participated vendors must have OEM Manufacturer support with respect to quoted Hardware,
Software and related warranties.
Complete LAN/WLAN Turn-Key solution with High performing Wireless LAN solution is required.
All the quoted equipment i.e. switches, controllers/gateways and AP should be from the same
OEM.
The bidder shall be responsible for complete end-to-end connectivity and the network shall be
fully converged.
The bidders would be required to conduct a detailed survey of the existing network and must
submit heat maps with respect to the quoted Wi-Fi equipment along with diagrams of the
Technical Survey Report (TSR), prior to submission of the tender document.
Solution must provide Blanket Coverage of Wi-Fi signal at each and every building to give
maximum coverage and SNR ratio shall be -70 DB to users through expansion of the existing Wi-
Fi network.
The bidder must be responsible for providing Network Cat 6 Cable Roll, Duct Power for newly
installed Switches, Access Points, Uplinks, and Cabinets.
CAT6 Copper Testing requirement: The Power Draw Test must be under 5% for a 1000 FT roll, and
the cable must be shielded.
Complete Cabling Solution including Racks, PDU and
etc. must be from a single premium quality manufacturer / brand.
The bidder must do the survey for the data center in order to fulfill the requirements of
civil/power work and requirements for the installation of the Smart Racks solution.
The specified quantity of items is based on internal assessment. Each bidder must verify the
exact requirements through a physical survey before submitting the tender document within
the designated deadline.
The procurement authority reserves the right to adjust the quantity of equipment during the
purchase order stage.
The Bidders must have a minimum of 10 years of experience in implementing this type of
solution in Pakistan and provide at least three references for similar work within the country