Management
Management
Profile Profile
PLANNING PLANNING 1.a. How do
1. What factors you typically
do you take prepare for a
Objective: Risk, into Objective: new project or
Resource, and Goals consideration 1. Task allocation task at the
Management when starting a 2. Timeline and construction
project? Scheduling site? What
3. Problem-solving steps do you
take to ensure
to be
2. How do you productive
allocate before starting
resources, to work?
including labor
materials and
equipment, to 1.b. How do
ensure optimal you measure
efficiency and the efficiency
productivity of your work
during performance?
construction?
2. Can you
describe a
recent project
3. Can you where you
describe a were involved
situation where in the
a project faced planning
unforeseen process? What
challenges specific role
during the did you play,
planning and how did
phase? How your
did your firm contribution
adapt and impact the
overcome those project's
challenges? success?
3.a. Do
4. How do you set laborers
realistic and participate in
achievable the planning
project goals process to
and ensure that identify and
they are manage the
communicated resources
effectively to needed for the
all team project? If yes,
members? how do you
contribute?
3.b. How do
you actively
engage with
other laborers,
supervisors,
and managers
to ensure a
cohesive
planning
process?
4. Are there
instances that
the plan can't
be followed
for some
reason? What
are some cases
that you have
already
encountered?
How did you
solve or
overcome this
kind of
problem?
4. How do you
ensure that
you meet the
expected
performance
from your
company/
firm?
5. What
happens after
the project is
finished?
3.c. How
about if you
ran out of
materials?
4. What type
of privilege or
rules are given
to you by the
company with
regard to your
time to ensure
that you will
have a proper
break time?
5.b. How do
you deal with
this situation?
6. What is the
administrator's
strategy where
the set quota
or progress of
work was not
achieved
during the
day?
1.a. How do
1.a. Why is it important
you approach
to know the worker’s
your daily
skills and experiences
tasks to ensure
beforehand?
maximum
work
1.b. How do you make
efficiency?
daily progress
Are there any
checking?
specific
strategies or
1.c. What do you
routines you
usually do if by any
follow?
chance one of your
staff is not doing his
job well? 1.b. Can you
share an
1.d. If something did example of a
not go according to time when you
ORGANIZING plan what do you felt
usually do? exceptionally
ORGANIZING productive at
Objectives: 2.a. What will you do if
1. How do you work? What
someone is against the
effectively do you think
way you balance the Objectives:
assign contributed to
workload? 1. Organizatio
workers to that
n of tools,
their tasks? heightened
2.b. Speaking of equipment
2. How do you efficiency?
workload, how do you and
balance the prevent overloading materials
workload specific workers while 2. Wok 2. Are there
among others are efficiency any tools,
others? underutilized? equipment, or
technologies
that have
significantly
improved your
work
efficiency?
How have
they impacted
your day-to-
day tasks?
3. How do you
prioritize tasks
when you
have multiple
assignments or
responsibilitie
s at once? Are
there any
particular
methods or
approaches
you use?
4.c. In some
circumstances,
what happens
if the job
wasn't
performed
according to
the instruction
or plan?
5. As a
laborer, what
are some of
the most
significant
changes or
improvements
you've
suggested to
enhance
overall work
efficiency on
the job?
6. What do
you think are
the most
common time-
wasting
activities or
distractions at
work? How do
you minimize
or avoid them
to maintain
your
productivity?
7. How
efficient is the
administrator's
organizing
strategy?
8. If you had
the authority
to implement
changes in the
work process
or
organization,
what
improvements
would you
suggest to
enhance the
overall
efficiency of
the labor
force?
9.a. How do
you handle
equipment,
materials, and
tools after
use?
9.b. Who
supervises the
materials,
equipment,
and tools that
are complete
after use?
5.a. How do
your
administrators
monitor the
progress of
work every
day?
5.b. In what
way does your
administrator
motivate you
to efficiently
work?
7. When
something
goes wrong
during your
project, how
does the
administrator
or project
manager
approach
you?
Prepared by:
2 YEAR CIVIL ENGINEERING STUDENTS
ND
(A.Y 2022-2023)
Subject:
MGT 11 – ENGINEERING MANAGEMENT
Instructor:
VICENTE D. CARILLO JR., Ph.D