0% found this document useful (0 votes)
7 views1 page

Contact Details: Select ' Link/ Menu. On Selecting The Link / Menu, The Services Under Factory Act Will Be Listed

Uploaded by

globe.2342111
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views1 page

Contact Details: Select ' Link/ Menu. On Selecting The Link / Menu, The Services Under Factory Act Will Be Listed

Uploaded by

globe.2342111
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Screen Reader Skip to Main Content

All User Login

Home Directorate Online Services Dashboard Safety Information Statistics Inspections Documents Gallery & Events Verification FAQ Grievance

Factory Services BOCW Services

Factory Services

Registration in Online Portal

Factories Act - Plan Approval

Factories Act - Registration and Licensing

Factories Act – Renewal of License

Contract Labour Act Registration

Contract Labour Act Licensing

Contract Labour Act License Renewal

Inter State Migrant Workmen Act Registration

Inter State Migrant Workmen Act Licensing

Inter State Migrant Workmen Act License Renewal

Pressure Vessels testing

How Your Application is Processed User Manual FAQ

Details of Services How Your Application is Processed User Manual FAQ

Plan Approval User Manual

Step 1: Enter your verified email-id in Username field and Password in password field and select the Login button.
1.a : On successful validation of username and password user will be redirected to the home page.
Step 2: On selecting the circle shaped Aviator icon on the right top corner of the home page, a pop-up will appear. Select Name of the factory from the dropdown for which
application of factory Plan Approval has to be submitted and select Dashboard Link as shown below.

2.a : On selecting the dashboard link, user will be redirected to services home page.
Step 3: Select ‘ Services offered under Factories Act ’ link/ Menu. On Selecting the Link / Menu, the services under factory act will be listed.

3.a : Select ‘ Plan approval’ service. On selecting this user will be redirected to the ‘ Plan approval’ flow as shown below.

Step 4 : Particulars of the factory


The already provided details of the factory will be auto displayed in the respective fields. User can edit those details such as Particulars of the factory , Situation of the factory
, Address for communication etc. He can select Submit button.
If no modification is required, user can click on Submit button directly.
Tool tips will be available for all the fields illustrating the required input.
The fields marked with “ * ” Mark are mandatory.
If your factory is registered as Micro Small Medium Enterprises (MSME), Select “ Yes ” option in ‘Whether registered as MSME? ’. On selecting the "yes" option, system prompts
user to select MSME type and to enter MSME Number .
Appropriate entries could be selected using Sector dropdown (Private / Public) and Nature of the Industry dropdown (Proprietorship/Partnership/Limited Company).

NIC (National Industrial Classification) code can be entered in two ways

NIC code Search


Selecting the step by step filters (Major category, division and manufacturing process).

Using NIC code Search option:


On selecting search button, a pop up window will appear with NIC code and NIC Description fields.
You can search by NIC Code or NIC Description.
Search result will appear and appropriate NIC code can be selected.
Step by Step Filter Option:
Select Major Category Dropdown
Based on the major category selected, corresponding division will be available in Division dropdown. Select the division from the dropdown.
Based on the Division selected, corresponding Manufacturing Processes will be available in Manufacturing Process Dropdown. Select your Manufacturing Process
from the dropdown.
On the selecting the Manufacturing Process, NIC code will be displayed automatically.

4.a : General Particulars

4.b : Situation of the Factory

Ward number field will be enabled and list of ward number will be listed in dropdown, if Local body type “Municipality” / “Corporation” is selected.
If your factory is located in the Flat / Apartment, Select “ yes ” option in ‘Is the factory located in flat / Apartment’ . On selecting the “ yes” option system prompts you to enter Flat
number, Block number, and Flat name.

4.c : Address for Communication

If factory Communication address is not in India, select “ others” in the state dropdown.On selecting “ others ” in the state drop down, system enables the Other state field
and state can be entered manually.
On selecting the submit button , General Particulars, Situation of the Factory, Address of Communication will be saved and"Saved Successfully" alert will be displayed.

The “ Preview Form No 1 ” button may be used at any time to see the preview Form No. 1 with details entered so far.
On completion of each step, flow arrow will turn to green colour from red colour

4.d : After successful submission of factory details, select "Particulars of the Occupier" from the Plan approval flow.

Step 5: On selecting Particulars of the Occupier, user will be redirected to Particulars of occupier Page with the following tabs.
Particulars of Occupier
Present Address
Permanent Address
Identity and Address Proof

5.a : The Occupier details which was saved in the User Registration will be auto displayed in the particulars of the occupier.
The details of the occupier can be edited except the following Fields.
First name/ Main calling Name
Middle Name
Last name / Surname
Date of Birth
Age
Father's Name
Gender
Nationality
e-mail ID
5.b : Particulars of the Occupier
Tool tips will be available for all the fields illustrating required input for the field.
The fields marked with “ * ” Mark are mandatory.
If the nationality of the occupier is not India, check “ Others” .
On selecting the “ Others” option system prompts user to enter Passport Number , Visa Type, Visa Valid up to. All the above details are mandatory foreigner.

5.c : Present Address


If occupier is residing in the Flat / Apartment, Select “ yes ” option in ‘ Are you residing in flat or apartment’ . On selecting the “ yes” option system prompts you to enter Flat
number, Block number, and Flat name.
If Present address of occupier is not in India, select “ others” in the state dropdown. On selecting “ others” in the state drop down, system enables the other state field and
prompts user to enter state manually.

5.d : Permanent Address


If occupier is residing in the Flat / Apartment, Select “ yes ” option in ‘ Are you residing in flat or apartment’ . On selecting the “ yes” option system prompts you to enter Flat
number, Block number, and Flat name.
If the Permanent address of occupier is not in India, select “ others” in the state dropdown. On selecting " others ” in the state drop down, system enables the other state field
and prompts user to enter state manually.

5.e : Identity / Address Proof

To upload the photo, select the Browse button and select Occupier image located in the system.

5.f : After Entering the required fields marked with ( * ) in Particulars of the occupier , Present address , Permanent address , Identity / Address Proof tabs , Click on "Submit"
button.

On selecting the submit button, Particulars of the occupier will be saved and "Saved Successfully" alert will be displayed.
Step 6: After successful submission of Manager Details , select Particulars of the Owner of Premises from the Plan Approval flow.

6.a : On selecting Particulars of the Owner of Premises , user will be redirected to Particulars of owner of Premises Page with the following tabs as shown below.
Particulars of Owner
Present Address
Permanent Address
Identity and Address Proof

6.b : Particulars of Owner

If the Factory premises is owned by Occupier himself, check ‘ Owner same as Occupier ’ check box to copy Occupier details to Owner details .
If the factory premise is owned by “Individual / Public Organization / Private Organization” , details as required in the following tabs must be entered.
Particulars of Owner
Present Address
Permanent Address
Identity and Address Proof
If “ Public Organization ” or “ Private Organization ” is selected in the Type of organization dropdown, system will prompt user to enter the name of Organization / Department
and Description.
If “ Public organization” is selected in the Type of organization dropdown, the following fields are not mandatory.
Salutation
Initial
First / Main Calling Name
Middle name
Last name / Surname
Date of Birth
Age
Father name
Mother name
Gender
Nationality
Email Id
Mobile number
Tool tips will be available for every field illustrating the required input for the field.
The fields marked with “ * ” Mark are mandatory.
If the nationality of the Owner is not India, check ‘ Others’ . On selecting the others option system prompts user to enter Passport Number , Visa Type, Visa Valid up to. All the
fields are mandatory for Foreigner.

6.c : Present Address

If the Owner is residing in the Flat / Apartment, check ‘ Are you residing in flat or apartment ’. On selecting the “ yes “option system prompts user to enter Flat number, Block
number, and flat name.
If Present address of owner is not India, select “ others” in the state dropdown .On selecting “ others ” in the state drop down, system enables the other state field and prompts
user to enter state manually.

6.d : Permanent Address


If the Owner is residing in the Flat / Apartment, check ‘ Are you residing in flat or apartment ’. On selecting the "yes" option system prompts user to enter Flat number, Block
number, and Flat name of owner permanent address.
If Present address of owner is in out of India, select others in the state dropdown .On selecting other in the state drop down, system enables the other state field and prompts
user to enter the permanent state of owner manually.

6.e : Identity / Address Proof


To upload the photo, select the Browse button and select Owner image located in the system.

6.f : After Entering the required fields marked with ( * ) in Particulars of the Owner , Present address , Permanent address , Identity / Address Proof tabs , Click on Add button.

If the Premises is owned by more than one individual, multiple owner details can be added by repeating Step 14 to Step 16 and selecting add Button.

On selecting the submit button, Particulars of the Owner will be saved and "Saved Successfully" alert will be displayed.

Step 7: After successful submission of Owner of premises details, select Particulars of the Board of Director / Partner / Registration and license details from the Factory Plan
Approval flow.

Particular of the Director / Partner link will be enabled in the Registration of Factory and Licensing flow, if Nature of industry was selected as Limited company/ Partnership firm
in the Particulars of the factory details.

For Other nature of Industries, Particular of the Director / Partner link will be disabled and user should proceed with Registration and license details from the Registration of Factory
and Licensing flow.

7.a : On selecting Particulars of Board of Director / Partner, user will be redirected to Particulars of Board of Director / Partner Page with the following tabs as shown below.
Particulars of Director / Partner
Present Address
Permanent Address
Identity and Address Proof

7.b : Particulars of Board of Director / Partner

Tool tips will be available for every field illustrating the required input.
The fields marked with “ * ” Mark are mandatory.
If the nationality of the Board of Director / Partner is not India, check ‘ Others ’. On selecting the ‘ Others ’ option system will prompt user to enter Passport Number , Visa Type,
Visa Valid up to. All details are mandatory.

7.c : Present Address

If the Board of Director or Partner is residing in the Flat / Apartment, check ‘ Are you residing in flat or apartment ’. On selecting the “ yes” option system prompts you to enter
Flat number, Block number, and Flat name.
If Present address of Board of Director / Partner is not in India, select “ others” in the state dropdown .On selecting “ Others ” in the state drop down, system enables the other
state field and prompts user to enter Director/Partner state manually.

7.d : Permanent Address

If the Board of Director / Partner is residing in the Flat / Apartment, check ‘ Are you residing in flat or apartment ’. On selecting the “ yes” option system prompts user to enter
Flat number, Block number , and Flat name .
If Present address of BOD / Owner is not in India, select “ others” in the state dropdown. On selecting “ others” in the state drop down, system enables the other state field and
prompts user to enter Director/Partner state manually.

7.e : Identity / Address Proof


To upload the photo, select the Browse button and select Board of Director / Partner image located in the system.

7.f : After Entering the required fields marked with ( * ) in Particulars of the Board of Director / Partner, Present address, Permanent address, Identity / Address Proof tabs , Click
Add button.

Details of all the directors can be by repeating Step 19 and Step 20 and selecting add Button.

On selecting the submit button, Particulars of the Board of Director / Partner will be saved and "Saved Successfully" alert will be displayed.
Step 8: After successful submission of Board of Director / Partner details , select Particulars of Plan from the Factory Plan Approval flow.

8.a : On selecting Particulars of Plan, user will be redirected to Particulars of Plan Page with the following tabs.
Particulars of present plan and previous approvals.
Particulars of capacity and number of workers.
Particulars of manufacturing processes.

8.b : Select ‘Particulars of present plan and previous approvals’ tab.

8.c : Select ‘ Initial Approval ’ Check box and Enter ‘ Initial Approval Description ’
8.d : ‘select Particulars of capacity and number of workers’ tab and Enter ‘Total proposed capacity in H.P.’ and ‘Maximum number of workers proposed to be employed on any
one day in the factory’.
If ‘Total proposed capacity in H.P.’ is NIL , Enter ‘0’ zero in the respective fields.

8.e : Select Particulars of manufacturing processes, Chemical Used and Manufacturing Process Carried On in the factory.

If chemicals are used in the factory , select and Enter following details and Click on Add to List,
Name of the chemical ,
type of storage,
Place of Storage,
unit of storage,
Purpose
Storage capacity,
Capacity in process,
maximum storage capacity
Chemicals added will be displayed in the grid on selecting ‘Add to List’. All the chemicals used in factory to be furnished.

8.f : If factory is engaged in dangerous operation , Select ‘ Whether the factory is engaged in dangerous operations prescribed under rule 95 of Tamil Nadu Factories Rules 1950, ‘
Click here to specify ’ link.
Pop up with dangerous operation will be listed.
Selected the dangerous process as by selecting corresponding check boxes.
If the factory is not involved in any dangerous process, select None check box from the dangerous operation pop up and click on Close button.

8.g : In case factory is engaged in Hazardous process, Select ‘ whether the factory is engaged in any hazardous process indicated under section 2(cb) of factories Act 1948, ‘ Click
here to specify ’ ’ link.
On clicking the ‘ Click here to specify ’ link, a pop up with Hazardous operation will be listed.
Selected the Hazardous process as applicable in the factory by selecting corresponding check boxes.

If the factory is not involved in any dangerous process, select None check box from the Hazardous operation pop up and click on close button.

8.h : After Entering the Required fields marked with ( * ), Click on the Submit button.
On selecting the Submit button, Factory Plan Details will be saved and "Saved Successfully" alert will be displayed.
Step 9: After successful submission Factory Plan Approval Details, select Submit Plan from the Factory Plan Approval flow.

9.a : on selecting the ‘Submit Plan Approval’ from the Factory Plan Approval flow user will be redirected to ‘Submit Plan Approval’ page.
The ‘Plan Approval’ detail which was saved will be auto populated and disabled in respective fields.

9.b : Particulars of manufacturing processes. Tab and select submit to dropdown list.

In submit to Dropdown, List of Joint Directors (Joint Director’) to whom application has to be submitted based on the location will be listed.
The “Preview Form No 1” button may be used at any time to obtain the details of fields entered so far of Factory Plan Approval flow as shown below.

9.c : select Joint Director from the ‘submit to’ dropdown to whom the factory registration and licensing form has to be submitted and select the submit button.
9.d : After Submission of factory registration and licensing details to Joint Director, Print Button will be enabled.
On selecting Print Button Form 1 will be generated in the Pdf Format.
Click on the Print Icon as shown in the below image. Or user can download the form Pdf by selecting icon next to print icon.

9.e : Take the Print out of From No. 1 and forward Form No. 1 in triplicate with signature of occupier and other necessary documents to respective Joint Director.

Step 10: Documents to be submitted


Form No 1 in triplicate
Blue prints of Topo Plan, Site plan (1:400 Scale) , Detailed plan (1:100 Scale) of buildings along with the machinery installation details in triplicate.
Process Flow chart
Hard Copies of supporting document for occupation of premises ( Sale deed / Lease deed / Rental deed etc.,)
Proof of Identity of Occupier
Proof of Address of Occupier

Details of Services How Your Application is Processed User Manual FAQ

Factories Act Registration and Licensing

Who can apply for the services Occupier & Manager

Name of the Labour Welfare Factories Act, 1948 and Tamil Nadu Factories Rules, 1950.
Act enforced.

Beneficiary of the Act. Employees and Employers

Persons to be approached for Director of Industrial Safety and Health, Additional Director-ISH, Joint Director-ISH, Deputy Director-ISH, Assistant Director-ISH
the benefit of the Act.

Documents to be submitted. Registration of Factories


Factories in which 10 or more workers are employed with power being used in the manufacturing process and factories which are engaging 20 or
more workers without using power in manufacturing process are registered under the Factories Act, 1948 and Rules,1950 as per Section 6 of the Act.

Persons who propose to start the factory should apply in Form No 2 through online portal along with the payment of appropriate fee to the Jt DISH
concerned for getting the licence.

Documents to be uploaded
Note: All the following documents shall be digitally signed by occupier:

1. Form No 2
2. Proof for Manager Identity
3. Proof for Manager Address
4. Copy of Certificate of Incorporation and Registration of company
5. List of Machinery along with Horsepower details
6.Declaration Form.

Fees applicable for license. Click here to download

Orders issuing officer. Additional Director-ISH - for allotment of Registration number to the New Factory. Joint Director-ISH - issue of licence

Duration 14 Days

Official to be contacted in Director of Industrial Safety and Health, Additional Director-ISH, Joint Director-ISH.
case of grievances

Details of Services How Your Application is Processed User Manual FAQ

Factories Act Renewal of Licence

Who can apply for the services Occupier & Manager

Name of the Labour Welfare Act Factories Act, 1948 and Tamil Nadu Factories Rules, 1950.
enforced.

Beneficiary of the Act. Employees and Employers

Persons to be approached for the Director of Industrial Safety and Health, Additional Director-ISH, Joint Director-ISH, Deputy Director-ISH, Assistant Director-ISH
benefit of the Act.

Documents to be submitted. Renewal of licence

For getting the renewal of license, the occupier should apply in Form No 2 through the online portal along with the payment of prescribed fees
for renewal to the concerned Jt DISH not less than two months before the date of expiry of license.

Documents to be uploaded
Note: All the following documents shall be digitally signed by occupier:

1. Form No 2 (downloaded/digitally signed) 2. Proof for Occupier Identity (In case of amendment)
3. Proof for Occupier Address (In case of amendment)
4. Proof for Manager Identity(In case of amendment)
5. Proof for Manager Address(In case of amendment)
6. Memorandum of articles of Association under Companies Act / Partnership Deed(In case of amendment)
7. List of Machinery with Horse Power details(In case of amendment)

Fees applicable for license. Click here to download

Orders issuing officer. Joint Director-ISH

Duration 30 Days

Official to be contacted in case of Director of Industrial Safety and Health, Additional Director-ISH, Joint Director-ISH.
grievances

Details of Services How Your Application is Processed User Manual FAQ

Contract Labour Act Registration

Who can apply for the services Principal Employer

Name of the Labour Welfare Act Contract Labour (Regulation and Abolition) Act, 1970.
enforced.

Beneficiary of the Act. Contract workers.

Persons to be approached for the Additional Director-ISH, Joint Director-ISH, Deputy Director-ISH, Assistant Director-ISH
benefit of the Act.

Documents to be submitted. To engage contract labour through contractor, the principal employer should apply in Form XII through online portal along with the
payment of prescribed fees to the concerned Jt DISH

Documents to be uploaded
1. Form XII
2. Copy of contract agreements between Principal Employer and Contractors
3. Declaration Form.

Fees applicable for license. Click here to download

Orders issuing officer. Joint Director-ISH concerned

Duration Action to be taken within 7 days.

Official to be contacted in case of Director of Industrial Safety and Health, Additional Director-ISH, Joint Director-ISH.
grievances

Details of Services How Your Application is Processed User Manual FAQ

Contract Labour Act Licensing

Who can apply for the services Contractor

Name of the Labour Welfare Act Contract Labour (Regulation and Abolition) Act, 1970.
enforced.

Beneficiary of the Act. Contract workers.

Persons to be approached for Additional Director-ISH, Joint Director-ISH, Deputy Director-ISH, Assistant Director-ISH
the benefit of the Act.

Documents to be submitted. Contractor should apply for licence in Form II under Rule 21(1) of the Act to the concerned Deputy Director-ISH along with prescribed licence fees
and Security Deposit at the rate of Rs. 100/- per worker as prescribed under section 24 (1) of the Act, through online portal

Documents to be uploaded
1. Form II
2. Form III issued by Principal Employer
3. Declaration Form.

Fees applicable for license. Click here to download

Orders issuing officer. Deputy Director-ISH concerned

Duration Action to be taken within 7 days.

Official to be contacted in case Director of Industrial Safety and Health, Additional Director-ISH, Joint Director-ISH
of grievances

Details of Services How Your Application is Processed User Manual FAQ

Contract Labour Act Licence Renewal

Who can apply for the services Contractor

Name of the Labour Welfare Act Contract Labour (Regulation and Abolition) Act, 1970.
enforced.

Beneficiary of the Act. Contract workers.

Persons to be approached for Additional Director-ISH, Joint Director-ISH, Deputy Director-ISH, Assistant Director-ISH
the benefit of the Act.

Documents to be submitted. Contractor should apply for renewal not less than 60 days before the date of expiry of licence in Form II through online portal, to the concerned
Deputy Director-ISH along with prescribed licence fees and Auto generated renewed licence could be downloaded.

Documents to be uploaded
1. Form II
2. Form III issued by Principal Employer
3. Declaration Form.

Fees applicable for license. Click here to download

Orders issuing officer. Deputy Director-ISH concerned

Duration Action to be taken within one month.

Official to be contacted in case Director of Industrial Safety and Health, Additional Director-ISH, Joint Director-ISH
of grievances

Details of Services How Your Application is Processed User Manual FAQ

Building and other construction workers Act Registration

Who can apply for the services Employer & Contractor

Name of the Labour Welfare Act enforced. The Building and other Construction workers (Regulation of Employment and conditions of service) Act 1996.

Beneficiary of the Act. Employees

Persons to be approached for the benefit Senior Additional Director-ISH (BOCW), Joint Director-ISH(BOCW), Deputy Director-ISH(BOCW), Assistant Director-ISH(BOCW)
of the Act.

Documents to be submitted. The establishments have to register as per rule 23 in Form No. XII along with necessary fees as prescribed under Rule 27, through online
portal to the concerned Jt DISH(BOCW)
Documents to be uploaded
Note: All the following documents shall be digitally signed by the Employer:

1. Form XII
2. Copy of supporting documents for possession of premises ( Patta/Lease deed / Rental deed etc)
3.Copy of supporting document to undertake construction work (contract agreement/JV agreement/project agreement etc)
4. Proof for Employer Identity
5. Proof for Employer Address
6 Proof of Manager /Person responsible for supervision
7. Copy of Certificate of Incorporation and Registration of company
8. Local body approval for construction
9. Declaration Form

Fees applicable for BOCW Registration. Click here to download

Orders issuing officer. Joint Director-ISH (BOCW)

Duration 7 days

Official to be contacted in case of Director of Industrial Safety and Health, Senior Additional Director-ISH(BOCW), Joint Director-ISH(BOCW)
grievances

Details of Services How Your Application is Processed User Manual FAQ

Interstate Migrant Workmen Act Registration

Who can apply for the services Principal Employer

Name of the Labour Welfare Act Inter-State Migrant Workmen (Regulation of Employment and Conditions of Service) Act 1979.
enforced.

Beneficiary of the Act. Migrant Workers

Persons to be approached for the Additional Director-ISH, Joint Director-ISH, Deputy Director-ISH, Assistant Director-ISH
benefit of the Act.

Documents to be submitted. The establishments employing 5 or more migrant workmen have to register as per rule 3 in Form No. XII along with necessary fees as
prescribed under Rule 12 to the Joint Director-ISH. concerned, through online portal.

Documents to be uploaded
1. Form No XII
2. Copy of Contract agreements between the Principal Employer and Contractors
3. Copy of Contractor License issued by concerned authority for recruitment of migrant workmen in home state
4. Declaration Form

Fees applicable for ISMWA Click here to download


Registration.

Orders issuing officer. Joint Director-ISH concerned

Duration Action to be taken within 7 days.

Official to be contacted in case of Director of Industrial Safety and Health, Additional Director-ISH, Joint Director-ISH
grievances

Details of Services How Your Application is Processed User Manual FAQ

Interstate Migrant Workmen Act Licensing

Who can apply for the services Contractor

Name of the Labour Welfare Act Inter-State Migrant Workmen (Regulation of Employment and Conditions of Service) Act 1979.
enforced.

Beneficiary of the Act. Migrant Workers

Persons to be approached for the Additional Director-ISH, Joint Director-ISH, Deputy Director-ISH, Assistant Director-ISH
benefit of the Act.

Documents to be submitted. The Contractor employing migrant workmen has to apply for licence as per Rule 7 in Form II along with the prescribed fees and security
Deposit to the concerned Deputy Director-ISH. through online portal.

Documents to be uploaded
1. Form No II
2. Copy of Contract License issued by concerned authority for recruitment of migrant workmen in home state
3. Form No III issued by Principal Employer
4. Declaration Form

Fees applicable for ISMWA license. Click here to download

Orders issuing officer. Deputy Director-ISH

Duration Action to be taken within 7 days.

Official to be contacted in case of Director of Industrial Safety and Health, Additional Director-ISH, Joint Director-ISH
grievances

Details of Services How Your Application is Processed User Manual FAQ

Interstate Migrant Workmen Act Licence Renewal

Who can apply for the services Contractor

Name of the Labour Welfare Inter-State Migrant Workmen (Regulation of Employment and Conditions of Service) Act 1979.
Act enforced.

Beneficiary of the Act. Migrant Workers

Persons to be approached for Additional Director-ISH, Joint Director-ISH, Deputy Director-ISH, Assistant Director-ISH
the benefit of the Act.

Documents to be submitted. The Contractor employing migrant workmen has to apply for renewal not less than 30 days before the date of expiry of licence in Form II. along with
the prescribed fees and auto generated renewed licence could be downloaded to the concerned Deputy Director-ISH, through online portal.

Documents to be uploaded
Note: All the following documents shall be digitally signed by the contractor:

1. Form No II (downloaded/digitally signed)


2. Form No VI issued by Principal Employer
3. Declaration Form

Fees applicable for ISMWA Click here to download


Renewal license.

Orders issuing officer. Deputy Director-ISH

Duration Action to be taken within one month.

Official to be contacted in Director of Industrial Safety and Health, Additional Director-ISH, Joint Director-ISH
case of grievances

Details of Services How Your Application is Processed User Manual FAQ

Pressure Vessels testing

Who can apply for the Occupier & Manager


services

Name of the Labour Welfare Factories Act, 1948 and Tamil Nadu Factories Rules, 1950.
Act enforced.

Beneficiary of the Act. Employees and Employers

Persons to be approached Director of Industrial Safety and Health, Additional Director-ISH, Joint Director-ISH, Deputy Director-ISH, Assistant Director-ISH
for the benefit of the Act.

Documents to be submitted. Pressure Vessels


All the Pressure Vessels operating above atmospheric pressure excluding steam boilers coming under the purview of Indian Boiler Act should be
examined or tested externally once in every six months, internally once in every year or hydrostatically once in everytwo years or subjected to
ultrasonic test once in every four years.

For examination and testing of Pressure Vessels the occupier should apply in Form No. 8-B along with fee Prescribed under Rule 56–B one month in
advance from the date on which the vessel falls due for such examination or test to the Joint Director-ISH concerned .

Orders issuing officer. Joint Director-ISH, Deputy Director-ISH, Assistant Director-ISH

Official to be contacted in Director of Industrial Safety and Health, Additional Director-ISH, Joint Director-ISH
case of grievances

Contact Details
T.S.No 47/1,Sidco Industrial Estate,(Near Metro Water Roundtana), Guindy, Chennai-32

044-22502103, 044-22502104 (Direct).

cif@tn.gov.in

Directorate Safety Information Documents Login

Directorate Related to Factories RTI All User Login

Function and Activities Related to BOCW Government Orders Privacy Policy

Organisation List of Dangerous Operations Minimum Wages Delete Account

Contact OrganList of Hazardous Process Award Schemes

Chemicals Notifiedogram Court Judgements

Transfers and Posting

Citizen Charter

You might also like