0% found this document useful (0 votes)
144 views1 page

Kovur - First Floor Roof Slab

First floor slab drg

Uploaded by

V.m. Rajan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
144 views1 page

Kovur - First Floor Roof Slab

First floor slab drg

Uploaded by

V.m. Rajan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ISSUED FOR:- CONSTRUCTION ONLY

SPACER ROD
MIN DIA-Y20 1st LAYER 2nd LAYER GENERALTECHNICALNOTES:-
2nd LAYER
SPAN-L3 SPAN-L1 SPAN-L2 SPAN-L3 SPAN-L2 SPAN-L1
1.0 ALL DIMENSIONS ARE IN FEET & INCHES
L1/4 (or) L2/4 (or) LEVELS ARE IN FEET & INCHES.
L1/4 L2/4 L2/4 L1/4
2" L3 2" L3 2" 2.0 GRADE:-
Ld
LEFT RIGHT
ALL CONCRETE - M20 (1:1.5:3),

D
LEFT MIDDLE RIGHT LEFT MIDDLE RIGHT HAND MIX - M20(1:1.5:3), (or)
D

D
CANTILEVER CANTILEVER
Ld RMC - M25(1:1:2),
L1/6 L1/6 L2/6 L2/6 STEEL - FE 550d.
D D D D 3.0 COVER:-
2nd LAYER 1st LAYER 2nd LAYER 1st LAYER VARYING BEAM DEPTH FOOTING-2",COLUMN-1.5",BEAM-1", SLAB-34",
TYPICAL LONGITUDINAL BEAM SECTION DETAILS RC WALL-1.5", WAIST SLAB-34".
4.0 DESIGNED:-
BUILDING DESIGN - G+1 ONLY.
STRUCTURAL DETAILED DRAWING-G+1 ONLY.

LEVELS

2'-0"
5'-0"
SPAN-L2 SPAN-L1

3'-0"
2"
L2/4 L1/4 Ld
2"
Ld NOTE:

IA
D

8*D
1. DISCREPANY, CONFLICTS OR ERROR , IF ANY

8*DIA
FOUND ANY IN THE DRAWING SHALL BE
Ld
BROUGHT TO THE NOTICE OF THE ARCHITECT
S4
LATERAL TIE DETAILS PRIOR TO COMMENCEMENT OF WORK.
S2 S4 ANCHOR REINFORCEMENT
VARYING BEAM DEPTH DETAILS FOR END BEAM 2. COVER BLOCKS SHALL BE USED AS COVER
WITH M20 GRADE

3. THIS DRAWING IS NOT TO BE SCALED


SPAN-L SPAN-L2
LEFT RIGHT

4. FINISHED LEVELS AS PER SITE ENGINEER'S


CB1

RIGHT

RIGHT
MIDDLE INSTRUCTION.
S1 S2 L1/6 L1/4 L2/3

BUILDING BEAM

MIDDLE

MIDDLE
PROPOSED RESIDENTIAL BUILDING AT KOVUR,
TYPICAL ROOF SLAB REINFORCEMENT DETAILS CHENNAI.

LEFT

LEFT
MIDDLE
S2
COMPRESSION LEFT RIGHT
LAP=24*DIA Mr.
BUILDING BEAM
1.3*LAP DIRECTION OF BEAM ARRANGEMENT

TENSION
ARCHITECTSANDPROMOTERS-
LAP=30*DIA
BEAM REINFORCEMENT LAPPING

S3 STAIRCASE 17.05.2025

C.S.L.N ST-07
SLAB SCHEDULE:- S.PS

-
SLAB NAME TYPE OF SLAB THICKNESS SHORTER DIRECTION LONGER DIRECTION

S1 TWO WAY SALB 0'-5" Y10 - 6"C/C Y10 - 6"C/C


S2 ONE WAY SLAB 0'-5" Y10- 6" C/C Y8 - 6 "C/C
FIRST FLOOR ROOF SLAB LAYOUT (STRUCTURAL
WORKING DRAWINGS)
S3 TWO WAY SALB 0'-5" Y10- 6" C/C Y8 - 6 "C/C
S
S4 TWO WAY SLAB 0'-5" Y8 - 6" C/C Y8 -6" C/C
FIRST FLOOR ROOF SLAB LAYOUT