0% found this document useful (0 votes)
110 views1 page

Kovur - Foundation Layout

Foundation details

Uploaded by

V.m. Rajan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views1 page

Kovur - Foundation Layout

Foundation details

Uploaded by

V.m. Rajan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ISSUED FOR:- CONSTRUCTION ONLY

GENERALTECHNICALNOTES:-

N.G.L GRADE BEAM N.G.L 1.0 ALL DIMENSIONS ARE IN FEET & INCHES
GRADE BEAM

IA
LEVELS ARE IN FEET & INCHES.
8*D

Min-3"
D
8*DIA
3 NO.S
MINIMUM 2.0 GRADE:-
SOIL FILLING WITH GOOD ALL CONCRETE - M20 (1:1.5:3),
COMPACTION HAND MIX - M20(1:1.5:3), (or)

Y8-6"C/C

Y8-6"C/C
DEPTH OF FOUNDATION

DEPTH OF FOUNDATION
LATERAL TIE DETAILS
MIN-1' RMC - M25(1:1:2),
AT END ANCHORAGE
STEEL - FE 550d.
B

D=7'-0"

D=7'-0"
A B C E DEVELOPEMENT LENGTH 'Y' DENOTED TMT BARS
3.0 COVER:-
a 3 NO.S MINIMUM 3 NO.S MINIMUM FOOTING-2",COLUMN-1.5",BEAM-1", SLAB-34",

D
6" 6" RC WALL-1.5", WAIST SLAB-34".

06 06

6" 4"

6" 4"
4.0 DESIGNED:-
EF4 EF3 EF4 BUILDING DESIGN - G+1 ONLY .
A A STRUCTURAL DETAILED DRAWING- G+1 ONLY.
L-LENGTH OF FOOTING L-LENGTH OF FOOTING
FOOTING (F) CROSS-SECTION ECCENTRIC FOOTING (EF) CROSS-SECTION 5.0 SOIL TEST:-

6"

6"
SBC - 7 T/M2 AT 6'-0"
FROM NGL.( As per Builder's information)

6" 6"

B-WIDTH OF FOOTING

B-WIDTH OF FOOTING
NOTE:
05 05
EF3 F1 EF3 A 1. DISCREPANY, CONFLICTS OR ERROR , IF ANY
B
FOUND ANY IN THE DRAWING SHALL BE
A
BROUGHT TO THE NOTICE OF THE ARCHITECT
PRIOR TO COMMENCEMENT OF WORK.

2. COVER BLOCKS SHALL BE USED AS COVER


WITH M20 GRADE
L-LENGTH OF FOOTING L-LENGTH OF FOOTING

FOOTING (F)-PLAN ECCENTRIC FOOTING (EF)-PLAN 3. THIS DRAWING IS NOT TO BE SCALED

04 04 4. FINISHED LEVELS AS PER SITE ENGINEER'S


EF1 EF1 N.G.L GRADE BEAM INSTRUCTION.

LAP=40*DIA
SOIL FILLING WITH GOOD

SECOND FLOOR
SEPTIC TANK 7' DEEP (6000 LTS) COMPACTION

Y8-6"C/C
PROPOSED RESIDENTIAL BUILDING AT KOVUR,
DEPTH OF FOUNDATION

1'-0"
10'-6"

1.3*LAP
CHENNAI.
D=7'-0"

03 CF1 03
EF2 a 3 NO.S MINIMUM
D

2"
6"

FIRST FLOOR
02 02
6" 4"

10'-6"
A
well L-LENGTH OF FOOTING
CF2 COMBINED FOOTING (CF) CROSS-SECTION ARCHITECTSANDPROMOTERS-
01 01
6"

LAPPING DISTANCE

GROUND FLOOR

10'-6"
B-WIDTH OF FOOTING

A B
ROAD 6"

LAPPING
17.05.2025

D
BASEMENT
A C D E
C.S.L.N ST-02

5'-0"
S.PS

FOUNDATION LAYOUT L-LENGTH OF FOOTING


-

FLOOR LEVELS AT END ANCHORAGE


COMBINED FOOTING (CF)-PLAN
ECCENTRIC FOOTING (EF)-SCHEDULE:- FOUNDATION LAYOUT (STRUCTURAL WORKING DRAWINGS)

SIZE OF FOOTING THICKNESS BOTTOM TOP


FOOTING NO.S REINFORCEMENT REINFORCEMENT COMBINED FOOTING (CF)-SCHEDULE:- S
FOOTING (F)-SCHEDULE:- LxB D A B
THICKNESS TOP & BOTTOM TOP & BOTTOM
EF1 6'0 " X 6'0" 1'-6" 02 Y12-6"C/C Y12-6"C/C FOOTING SIZE OF FOOTING NO.S REINFORCEMENT REINFORCEMENT
THICKNESS BOTTOM
SIZE OF FOOTING L x B NO.S REINFORCEMENT EF2 5'-6"x5'-6" 1'-6" 01 Y12-6"C/C Y 12-6"C/C LxB D A B
FOOTING
D A EF3 5'-0"x5'-0" 1'-4.5" 03 Y10-6"C/C Y10-6"C/C CF1 11'4.5" X 5'3" 1'-4.5" 01 Y10-6"C/C Y10-6"C/C
F1 6-0"x6'-0" 1'-6" 01 Y12-6"C/C EF4 4'-6"x4'-6" 1'-4.5" 03 Y10-6"C/C Y10-6"C/C CF2 11'4.5" X 4'6" 1'-4.5" 01 Y10-6"C/C Y10-6"C/C
ISSUED FOR:- CONSTRUCTION ONLY

You might also like