Performance Appraisal Form
Employee Name: HR-FM-PAF-00
Job Title: Employee Code:
Reporting Manager: Department:
Date of Appraisal: Appraisal Period:
SECTION 1: QUANTITATIVE PERFORMANCE ASSESSMENT (Based on Job Duties)
Rating Scale: 5 = Excellent, 4 = Very Good, 3 = Good, 2 = Needs Improvement, 1 = Unsatisfactory, N/A = Not Applicable
Duty 1:
Tasks / KPIs Quality Timeliness Compliance Score
1. Supervise installation of electrical systems
(cables, DBs, lighting). KPI: Installation quality, 4 4 5 4.3
NCRs
2. Review shop drawings & as-builts. KPI:
4 5 5 4.7
Accuracy & approval cycle
3. Ensure execution per approved designs. KPI:
4 4 4 4.0
Adherence to specs
4. Coordinate with subcontractors. KPI: Delay
5 4 5 4.7
resolution time
Weighted Score for Duty 1 4.4
Duty 2:
Tasks / KPIs Quality Timeliness Compliance Score
1. Participate in testing & commissioning. KPI: 1 1 3 1.7
First-time pass rate
2. Ensure safety procedures. KPI: Safety 2 2 3 2.3
incidents/violations
3. Prepare method statements & IRs. KPI: 3 4 6 4.3
Timely submission
Weighted Score for Duty 2 2.7
Duty 3:
Tasks / KPIs Quality Timeliness Compliance Score
1. Maintain daily reports & logs. KPI: Report
2 2 3 2.3
completeness & accuracy
2. Coordinate for inspections. KPI: Inspection
2 2 3 4.3
delay rate
Weighted Score for Duty 3 3.3
Total Quantitative Score 3.6
Performance Appraisal Form
SECTION 2: QUALITATIVE ASSESSMENT (Knowledge, Skills, Attitude)
Competency Rating (1-5) Comments / Examples
Knowledge of Electrical Codes & Safety
3
Regulations
Proficiency in Reading Designs & Supervision 5
Team Leadership & Site Pressure Management 4
Documentation & Inspection Coordination
4
Skills
Communication Skills (English - C1 Level) 4
Adherence to Safety Protocols on Site 5
Problem-Solving & Decision-Making 3
Average Qualitative Score 4.0
SECTION 3: OVERALL SUMMARY & RECOMMENDATIONS
Summary Score
Quantitative Score (80% of Total) 3.6
Qualitative Score (20% of Total) 4.0
FINAL OVERALL SCORE 3.6
Overall Performance Rating Good
Key Achievements:
Areas for Improvement:
Recommendations:
SECTION 4: DEVELOPMENT PLAN (IDP)
Development Goal Action Steps Target Date Support Required
Department Head
Employee
Approval
Signature: Signature:
Date: [Date] Date: [Date]