Nile Ispection LPG Tank

Uploaded by

albashir1981
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views8 pages

Nile Ispection LPG Tank

Uploaded by

albashir1981
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

NILE

Equ
No
1
2
3
Inspec
No
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Administration
No
18
19
20
NILE Company

Equipment’s
Subject
Scaffolding for inspection (main hole&safety valve) 9 LPG tanks inspection
25 Ton Crane for disassemble and assemble the safety valve
Truck
Inspection Work
Subject
Open the main holes for ventilation and inspection and close after finish.
Flushing the tanks
Gas Test (confined space)
visual inspection for tanks
Inspection Ultrasonic thickness measurement for shell courses
Inspection Hardness testing shell courses
Inspection Hammer test (Destructive testing)
Inspection for the tank coating
Check all instrument devices, temperature gauges and Level gage or volume measureme
Replace the damage instrument cables in the burned tanks.
Inspection for Concrete, foundation, and Skirt of concrete
Check and calibrate safety valves
Check valves, fittings, and Drain nozzle replace if needed, and replace the gasket.
Hydro test for tanks
Administration
Subject
Supervision
Logistic
Accommodation
Total cost
VAT
Final Total
Fees (USD) Actual Total USD
$4.5/m³ 2232 10000
$100/h 21 2100
$10/h 21 210

Fees (USD) Actual Total USD


$40/pcs 9 360
$100/tank 9 900
$100/tank 9 900
$500/tank 9 4500
$500/tank 9 4500
$1000/tank 9 9000
$500/tank 9 4500
$500/tank 9 4500
Sump lump 1000
Sump lump 1000
Sump lump 1000
$500/valve 9 4500
Sump lump 1000
$500/tank 9 4500

Fees (USD) Actual Total USD


2000
1500
2000
59970
10194.9
70164.9
Company Name

Items
Inspection
DPT materials
Scaffolding
Mobilization
Total
NILE Company
1-Inspection for 9 LPG tanks included (visual, Ultrasonic thickness, DPT, Hardness test
2-Erect Scaffolding for open manholes, safety valves, and inspection
3-Open the Manholes for ventilation
4- Flushing the Tanks by water
5- Inspection for shell courses for the tank
5-Ultrasonic thickness measurement for the tank
6-Hardness testing for the tank
7-Hammer test (Destructive testing)
8- Inspection for Concrete, foundation, and Skirt of concrete
9- Inspection for the tank coating
10- Inspection for Ladder condition.
11-Check and celebrate the safety valves (Dismantle and Reinstall) replace if needed
12-Check the temperature gauges and Level gage or volume measurement
13-Replaced all flange gaskets in burned tanks (prepare for the hydro test)
14-Check valves, fittings, and Drain nozzle replace if needed.
15-Check all instrument devices and replace it if needed
16-Replace the damage instrument cables in the burned tanks.
17-Reinstall the main holes, safety valves, and flanges.
18-Hydrotest for tanks
19-Remove Scaffolding
USD