Report of Final Acceptance Test for Base Transceiver Station Equipment
(BTS, nano BTS and FDUAMCO)
Installed by M/s NSN
Contract # TBL/SE/Project-2/2005-2006 Date: July 27, 2006
20 February 2012
Report of Final Acceptance Test For BTS, nano BTS and FDUAMCO. Installed by M/s Nokia Siemens Networks (NSN) Contract # TBL/SE/Project-2/2005-2006, Dated 27 July 2006 A FAT committee was formed vide letter No. 14.35.1212.500.08.001.12 dated February 29, 2012 with the following members to conduct Final Acceptance Test of BTS, nano BTS and FDUAMCO installed by NSN: Sl. No. 1. 2. 3. Designation of the officers DGM, System Operation, Dhaka. Assistant Manager/Junior Officer, System Operation Assistant Manager/Junior Officer, System Engineering Status Convenor Member Member
The FAT report is as follows: A. Description of the Installation M/s Nokia Siemens has installed BTS and FDUAMCO. The location of BSC and OMC-R in the Teletalk Mobile Network is as follows:
B. C.
MSC
TRAU
BSC
BTS + FDUAMCO
MS
OMC-R
MSC = Mobile Switching Center BTS = Base Transceiver Station TRAU = Transcoding and Rate Adaptation Unit MS = Mobile Station BSC = Base Station Controller B. Photocopy of the FAT order The photocopy of the FAT order (one page) is given in Annex-01. D. List of Test Items and that of unsuccessful Items 1. List of Test Items
a. b. c. d. e. f. g. h.
Equipment Delivery Status. Installation Status. Commissioning & Integration Status. Acceptance Status. PAC Status. Status of Pending Items (PAT files). System put into On Air. Present Status.
2. List of unsuccessful Items.
There is no unsuccessful item.
C. List of Bill of Quantity (BoQ) Signed by FAT Committee The required BoQ signed by FAT Committee is given in Annex-02. D. Compliance with Tender Document, Contract and Specification M/s Nokia Siemens Networks has supplied and installed the materials/features as per Tender Documents, Contracts and Specification Contracts. E. Recommendation for FAC: As per test results and observation, the BTS and FDUAMCO are installed and operational, FAC may be issued as there is no pending item. F. Detailed FAT Documents signed by FAT Committee: The detailed FAT documents signed by FAT Committee have been given as Annex-03. This FAT report is performed on ... For Teletalk
Assistant Manager/Junior Officer, System Operation Teletalk Bangladesh Limited
Assistant Manager/Junior Officer, System Engineering
Teletalk Bangladesh Limited
DGM, System Operation, Dhaka Teletalk Bangladesh Limited
For NSN Bangladesh Ltd.
TI Engineer Nokia Siemens Networks Bangladesh Limited
Project Manager Nokia Siemens Networks Bangladesh Limited