CHP Jan 2009 For Civil Works
CHP Jan 2009 For Civil Works
                                             Under EPC awarded to SEPCO III, Civil works are awarded Equipment /
Contract Name:                                                                                                                          Civil works
                                             to M/s Gannon Dunkerley and Company Ltd. [M/s GDC] System :
CHP
       M / SEPCOIII / GDC / 5 / 30 11 08 / 006                         Date: From 01.11.2008     to 30.11.2008 [Consolidated]
NO.
         APL / SFQP / 001                                                                    Visual and                                                   Witnessed by AG's FQA, Survelliance by AG's
   1     dated 27.02.2008          A                Excavation           Nature of soil       Random,                    SR                   OK                             FQA
                1.0                                                                        SC as per USCS                                                           Results maintained : LB
                                                                                                                 2 samples in every
         APL / SFQP / 001                                                                                                                                 Witnessed by AG's FQA, Survelliance by AG's
                                              Moisture content of                           Rapid moisture           2000 cum ,
   2     dated 27.02.2008          A                                     Fill materials                                                       OK                             FQA
                                             Fill before compaction                             meter             Results as per IS
                2.6                                                                                                                                                 Results maintained : LB
                                                                                                                       2720
                                                                                                                 For foundation
         APL / SFQP / 001                     Compaction test of                                              backfill one for every                      Witnessed by AG's FQA, Survelliance by AG's
                                                                                          Dry density by core
   3     dated 27.02.2008          A          bakfilling by Proctor      Fill materials                         10 foudations for             OK                             FQA
                                                                                            cutter method
                2.7                          density determination                                              each compacted                                  Results maintained : LB and SR
                                                                                                                       layer
     APL / SFQP / 001                                                    Four trials are         IS 456,                            Witnessed by AG's FQA, Survelliance by AG's
                             Trial Mix (CCS) Mix
7    dated 27.02.2008   A                              Concrete       carried out for each     IS516 and             OK                                FQA
                                    Design
         3.1.5(b)                                                      grade of concrete        IS10262                                   Results maintained : LB and SR
Contractor M/s SEPCO III Manufacturer M/s GDC Executing Department ,APL Mundra FQA,APL Mundra
Copies to :
                                         Under EPC awarded to SEPCO III, Civil works are awarded to M/s
Contract Name:                                                                                                     Equipment / System :Civil works
                                         Simplex Infrastructure Ltd. [M/s SIL]
Contractor     : M/s SEPCO III,China Sub- Contractor : M/s Simplex Infrastructure Ltd. [M/s SIL]                   Manufacturer              Civil
                                                                                                                                             :     works awarded to M/s SIL
Date of Inspection:-
                        From 01.11.2008     to 30.11.2008         [Consolidated]                                   Location                  Unit
                                                                                                                                             :    No: 6   [ 660 MW TPP]
Consolidated Report
CHP M
    NO.
      / SEPCOIII / Simplex / 6 / 301108 / 007                     Date: From 01.11.2008     to 30.11.2008 [Consolidated]
                                                                                                                    2 samples in every
     APL / SFQP / 001                                                                                                                                          Witnessed by AG's FQA, Survelliance by
                                          Moisture content of                                                           2000 cum ,
 2   dated 27.02.2008         A                                      Fill materials    Rapid moisture meter                                        OK                        AG's FQA
                                         Fill before compaction                                                      Results as per IS
            2.6                                                                                                                                                       Results maintained : LB
                                                                                                                          2720
    APL / SFQP / 001         Check for concrete                            The water is tested for its                                           Witnessed by AG's FQA, Survelliance by
6   dated 27.02.2008   A    compressive strength           Water            as per IS 456 at each            IS 456               OK                           AG's FQA
          3.1.4                  and IST                                      change of source                                                          Results maintained : LB
    APL / SFQP / 001                                                       Four trials are carried out       IS 456,                             Witnessed by AG's FQA, Survelliance by
                             Trial Mix (CCS) Mix
7   dated 27.02.2008   A                                  Concrete            for each grade of            IS516 and              OK                           AG's FQA
                                    Design
        3.1.5(b)                                                                    concrete                IS10262                                  Results maintained : LB and SR
Copies to :
1). Contractor / Sub-Contractor          2)Executing Dept/Site               3)FQA Site                  4)CQA & IG
                                                                                                               ADANI POWER LTD
                                                                                                           CHP CLEARANCE REPORT
                                             Under EPC awarded to SEPCO III, Civil works are awarded Equipment /
Contract Name:                                                                                                                      Civil works
                                             to M/s Gannon Dunkerley and Company Ltd. [M/s GDC] System :
         APL / SFQP / 001                                                                   Visual and                                                Witnessed by AG's FQA, Survelliance by AG's
   1     dated 27.02.2008         A                Excavation           Nature of soil       Random,                       SR             OK                             FQA
                1.0                                                                       SC as per USCS                                                        Results maintained : LB
         APL / SFQP / 001                                                                   Four trials are            IS 456,                        Witnessed by AG's FQA, Survelliance by AG's
                                               Trial Mix (CCS) Mix
   4     dated 27.02.2008         A                                       Concrete       carried out for each        IS516 and            OK                             FQA
                                                      Design
             3.1.5(b)                                                                     grade of concrete           IS10262                               Results maintained : LB and SR
                                                                                    One set of 6 cubes
                                                                                       per 100 cubic
                                                                                        meter or part
           APL / SFQP / 001                                                           thereof for each                                           Witnessed by AG's FQA, Survelliance by AG's
                                             Crushing strength                                                 IS 456,            OK
   5       dated 27.02.2008       A                                   Concrete      grade of concrete.                                                              FQA
                                              Work test cubes                                                   IS 516
               3.1.5 ( c)                                                            3 cubes tested at                                                 Results maintained : LB and SR
                                                                                    age of 7 days and
                                                                                     3 cubes at age of
                                                                                          28 days
Contractor M/s SEPCO III Manufacturer M/s GDC Executing Department ,APL Mundra FQA,APL Mundra
Copies to :
                                               Under EPC awarded to SEPCO III, Civil works are awarded Equipment /
Contract Name:                                                                                                                           Civil works
                                               to M/s Gannon Dunkerley and Company Ltd. [M/s GDC] System :
CHP
       M / SEPCOIII / GDC / 5 / 2912 08 / 00                            Date: From 01.12.2008     to 29.12.2008 [Consolidated]
NO.
         APL / SFQP / 001                                                                     Visual and                                                   Witnessed by AG's FQA, Survelliance by AG's
   1     dated 27.02.2008          A                Excavation            Nature of soil       Random,                    SR                   OK                             FQA
                1.0                                                                         SC as per USCS                                                           Results maintained : LB
                                                                                                                  2 samples in every
         APL / SFQP / 001                                                                                                                                  Witnessed by AG's FQA, Survelliance by AG's
                                                Moisture content of                          Rapid moisture           2000 cum ,
   2     dated 27.02.2008          A                                      Fill materials                                                       OK                             FQA
                                               Fill before compaction                            meter             Results as per IS
                2.6                                                                                                                                                  Results maintained : LB
                                                                                                                        2720
                                                                                                                  For foundation
         APL / SFQP / 001                       Compaction test of                                             backfill one for every                      Witnessed by AG's FQA, Survelliance by AG's
                                                                                           Dry density by core
   3     dated 27.02.2008          A            bakfilling by Proctor     Fill materials                         10 foudations for             OK                             FQA
                                                                                             cutter method
                2.7                            density determination                                             each compacted                                  Results maintained : LB and SR
                                                                                                                        layer
     APL / SFQP / 001                                                    Four trials are         IS 456,                            Witnessed by AG's FQA, Survelliance by AG's
                             Trail Mix (CCS) Mix
7    dated 27.02.2008   A                              Concrete       carried out for each     IS516 and             OK                                FQA
                                    Design
         3.1.5(b)                                                      grade of concrete        IS10262                                   Results maintained : LB and SR
Contractor M/s SEPCO III Manufacturer M/s GDC Executing Department ,APL Mundra FQA,APL Mundra
Copies to :
                                         Under EPC awarded to SEPCO III, Civil works are awarded to M/s
Contract Name:                                                                                                      Equipment / System :Civil works
                                         Simplex Infrastructure Ltd. [M/s SIL]
Contractor       : M/s SEPCO III,China   Sub- Contractor : M/s Simplex Infrastructure Ltd. [M/s SIL]                Manufacturer              C
                                                                                                                                              : ivil works awarded to M/s SIL
Date of Inspection:-
                            From 01.12.2008    to 31.12.2008       [Consolidated]                                   Location                  Unit
                                                                                                                                              :    No: 6   [ 660 MW TPP]
Consolidated Report
CHP
    M / SEPCOIII / Simplex / 6 / 3112 08 / 0                       Date: From 01.12.2008     to 31.12.2008 [Consolidated]
NO.
                                                                                                                     2 samples in every
         APL / SFQP / 001                                                                                                                                       Witnessed by AG's FQA, Survelliance by
                                           Moisture content of                                                           2000 cum ,
  2      dated 27.02.2008        A                                    Fill materials     Rapid moisture meter                                       OK                        AG's FQA
                                          Fill before compaction                                                      Results as per IS
                2.6                                                                                                                                                    Results maintained : LB
                                                                                                                           2720
     APL / SFQP / 001         Check for concrete                            The water is tested for its                                           Witnessed by AG's FQA, Survelliance by
6    dated 27.02.2008   A    compressive strength           Water            as per IS 456 at each            IS 456                OK                          AG's FQA
           3.1.4                  and IST                                      change of source                                                          Results maintained : LB
     APL / SFQP / 001                                                       Four trials are carried out       IS 456,                             Witnessed by AG's FQA, Survelliance by
                              Trial Mix (CCS) Mix
7    dated 27.02.2008   A                                  Concrete            for each grade of            IS516 and               OK                          AG's FQA
                                     Design
         3.1.5(b)                                                                    concrete                IS10262                                  Results maintained : LB and SR
Copies to :
1). Contractor / Sub-Contractor           2)Executing Dept/Site                3)FQA Site                4)CQA & IG
                                                                                                               ADANI POWER LTD
                                                                                                           CHP CLEARANCE REPORT
                                             Under EPC awarded to SEPCO III, Civil works are awarded Equipment /
Contract Name:                                                                                                                      Civil works
                                             to M/s Gannon Dunkerley and Company Ltd. [M/s GDC] System :
CHP
       M / SEPCOIII / GDC / 7 / 291208 / 008                          Date: From 01.12.2008      to 29.12.2008 [Consolidated]
NO.
         APL / SFQP / 001                                                                   Visual and                                                Witnessed by AG's FQA, Survelliance by AG's
   1     dated 27.02.2008         A                Excavation           Nature of soil       Random,                       SR             OK                             FQA
                1.0                                                                       SC as per USCS                                                        Results maintained : LB
         APL / SFQP / 001                                                                   Four trials are            IS 456,                        Witnessed by AG's FQA, Survelliance by AG's
                                               Trial Mix (CCS) Mix
   4     dated 27.02.2008         A                                       Concrete       carried out for each        IS516 and            OK                             FQA
                                                      Design
             3.1.5(b)                                                                     grade of concrete           IS10262                               Results maintained : LB and SR
                                                                                    One set of 6 cubes
                                                                                       per 100 cubic
                                                                                        meter or part
           APL / SFQP / 001                                                           thereof for each                                           Witnessed by AG's FQA, Survelliance by AG's
                                             Crushing strength                                                 IS 456,            OK
   5       dated 27.02.2008       A                                   Concrete      grade of concrete.                                                              FQA
                                              Work test cubes                                                   IS 516
               3.1.5 ( c)                                                            3 cubes tested at                                                 Results maintained : LB and SR
                                                                                    age of 7 days and
                                                                                     3 cubes at age of
                                                                                          28 days
Contractor M/s SEPCO III Manufacturer M/s GDC Executing Department ,APL Mundra FQA,APL Mundra
Copies to :
                                             Under EPC awarded to SEPCO III, Civil works are awarded to M/s
Contract Name:                                                                                                             Equipment / System :Civil works
                                             Simplex Infrastructure Ltd. [M/s SIL]
Contractor       : M/s SEPCO III,China       Sub- Contractor : M/s Simplex Infrastructure Ltd. [M/s SIL]                   Manufacturer         Civil
                                                                                                                                                :     works awarded to M/s SIL
Date of Inspection:-
                            From 01.12.2008      to 31.12.2008        [Consolidated]                                       Location             Unit
                                                                                                                                                :    No: 8   [ 660 MW TPP]
Consolidated Report
CHP
    M / SEPCOIII / Simplex / 8 / 311208 / 00                          Date: From 01.12.2008      to 31.12.2008 [Consolidated]
NO.
         APL / SFQP / 001                      Check for concrete                            The water is tested for its                                          Witnessed by AG's FQA, Survelliance by
  3      dated 27.02.2008         A           compressive strength          Water             as per IS 456 at each                 IS 456            OK                        AG's FQA
               3.1.4                               and IST                                      change of source                                                         Results maintained : LB
         APL / SFQP / 001                                                                    Four trials are carried out          IS 456,                         Witnessed by AG's FQA, Survelliance by
                                               Trial Mix (CCS) Mix
  4      dated 27.02.2008         A                                        Concrete             for each grade of               IS516 and             OK                        AG's FQA
                                                      Design
             3.1.5(b)                                                                                 concrete                   IS10262                              Results maintained : LB and SR
                                                                                              One set of 6 cubes per
                                                                                              100 cubic meter or part
          APL / SFQP / 001                                                                   thereof for each grade of                            OK             Witnessed by AG's FQA, Survelliance by
                                                Crushing strength                                                            IS 456,
  5       dated 27.02.2008        A                                         Concrete                 concrete.                                 [Separate                       AG's FQA
                                                 Work test cubes                                                              IS 516
              3.1.5 ( c)                                                                     3 cubes tested at age of                       sheets attached]         Results maintained : LB and SR
                                                                                               7 days and 3 cubes at
                                                                                                  age of 28 days
Copies to :
1). Contractor / Sub-Contractor           2)Executing Dept/Site                   3)FQA Site                4)CQA & IG
                                                                                                               ADANI POWER LTD
                                                                                                           CHP CLEARANCE REPORT
                                              Under EPC awarded to SEPCO III, Civil works are awarded Equipment /
Contract Name:                                                                                                                      Civil works
                                              to M/s Gannon Dunkerley and Company Ltd. [M/s GDC] System :
CHP
       M / SEPCOIII / GDC / 9 / 2912 08 / 0                           Date: From 01.12.2008      to 29.12.2008 [Consolidated]
NO.
         APL / SFQP / 001                                                                   Visual and                                                Witnessed by AG's FQA, Survelliance by AG's
   1     dated 27.02.2008          A               Excavation           Nature of soil       Random,                       SR             OK                             FQA
                1.0                                                                       SC as per USCS                                                        Results maintained : LB
         APL / SFQP / 001                                                                   Four trials are            IS 456,                        Witnessed by AG's FQA, Survelliance by AG's
                                               Trial Mix (CCS) Mix
   4     dated 27.02.2008          A                                      Concrete       carried out for each        IS516 and            OK                             FQA
                                                      Design
             3.1.5(b)                                                                     grade of concrete           IS10262                               Results maintained : LB and SR
                                                                                    One set of 6 cubes
                                                                                       per 100 cubic
                                                                                        meter or part
           APL / SFQP / 001                                                           thereof for each                                           Witnessed by AG's FQA, Survelliance by AG's
                                             Crushing strength                                                 IS 456,            OK
   5       dated 27.02.2008       A                                   Concrete      grade of concrete.                                                              FQA
                                              Work test cubes                                                   IS 516
               3.1.5 ( c)                                                            3 cubes tested at                                                 Results maintained : LB and SR
                                                                                    age of 7 days and
                                                                                     3 cubes at age of
                                                                                          28 days
Contractor M/s SEPCO III Manufacturer M/s GDC Executing Department ,APL Mundra FQA,APL Mundra